Proposed Tech Specs,Incorporating Proposed Change 86-02, Modifying Surveillance Testing of Diesel Fuel Oil to Update Tech Specs to Current Industry Stds
ML20154B797
Person / Time
Site: Pilgrim
Issue date: 02/25/1986
From:
BOSTON EDISON CO.
To:
Shared Package
ML20154B777 List:
References
NUDOCS 8603040396
Download: ML20154B797 (2)


Text

- _ _ _ _

Proposed Amendment to Technical Specifications Diesel Fuel Oil Standards A. Narrative The present Technical Specification surveillance requirement mandates that diesel fuel oil be sampled and checked for quality in accordance with specific American Society of Testing and Materials standards (ASTM). The ASTM standards, cited in the current Technical Specifications, have been discontinued and replaced with newer standard reference sources. This .

proposed change will provide new standard reference sources in the two locations of Technical Specifications where diesel fuel oli standards are mentioned.

8. Reason for Change The recommended Technical Specification change is consistent with the current industry practice of utilizing the prevalent quality standard recommended by the American Society of Testing and Materials.

C. Safety Considerations These changes do not present an unreviewed safety question as defined in 10CFR50.59. They have been reviewed and approved by the Operations Review Committee, and reviewed by the Nuclear Safety Review and Audit Committee.

D. Significant Hazards Consideration The NRC has provided guidance concerning the appItcation of standards for determining whether license amendments involve significant hazards considerations by providing certain examples (48FR14870). The change of the Technical Specification surveillances to meet the current industry standard for diesel fuel oil quality constitutes: (1) A purely administrative change to Technical specifications; for example, a change to achieve consistency throughout the Technical Specifications by replacing a discontinued reference to a diesel fuel oil standard with the current ASTM standard to test the quality of diesel fuel oil used in emergency generators and the fire system emergency pump. The changes are purely administrative in context and do not involve a significant hazards consideration.

E. Schedule of Change I f

This amendment will be effective 30 days af ter receipt of approval by the l NRC.

F. Application Fee l

Pursuant to 10CFR170.12(c), Boston Edison submits the enclosed check

  1. 936912 as payment for the application fee to cover the submittal of this Technical Specification change request.

l 8603040396 DR 060225 ADOCK 05000293 PDR l

, LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.A AUXILIARY ELECTRICAL EQUIPMENT- 4.9.A AUXILIARY ELECTRICAL EQUIPMENT SURVEILLANCE

4. 4160 volt buses A5 and A6 are d. Once a month the quantity of

, -energized and the associated 480 diesel fuel available shall be volt buses are energized. logged.

5. The station and switchyard 125 e. Once a month a sample of diesel i

and 250 volt batteries are fuel shall be checked for quality l operable. Each battery shall in accordance with ASTM 04057-81 have an operable battery charger. or.04177-82. The quality shall

- be within the acceptable limits

6. Emergency Bus Degraded Voltage specified in Table 1 of ASTM Annunciation System as specified 0975-81 and logged.
in Table 3.2.B.1 is operable.
2. Station and Switchyard Batterles

) a. Every week the specific gravity, the voltage and temperature of

} the pilot cell and overall battery voltage shall be measured

and logged.
b. Every three months the measurements shall be made of voltage of each cell to nearest 0.1 volt, specific gravity of

] each cell, and temperature of i

j every fifth cell. These i measurements shall be logged.

l' c. Once each operating cycle, the stated batteries shall be i subjected to a rated load discharge test. The specific

gravity and voltage of each cell J shall be determined after the discharge and logged.

B. Operation with Inoperable 3. Emergency 4160V Buses A5-A6 Egulpment Degraded Voltage Annunciation l Whenever the reactor is in Run i Mode or startup Mode with the a. Once each operating cycle,

! reactor not in a Cold Condition, calibrate the alarm sensor.

j the availability of electric i power shall be as specified in b. Once each 31 days perform a

3- 9. 8.1, 3.9.B.2, 3. 9. B.3, channel functional test on the 3.9.B.4, and 3.9.B.5. alarm system.

l f 1. From and after the date that c. In the event the alarm system is j incoming power is not available determined inoperable under 3.b i from the startup or shutdown above, commence logging safety transformer, continued related bus voltage every 30 minutes untti such time as the alarm is restored t: Op,able j status, i

l Amendment No. 195

~ '

LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS

e. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11, " Test of Water Supplies" of the Fire Protection Handbook, 14th edition, published by the National Fire Protection Association.
2. The fire pump diesel shall be demonstrated OPERABLE:
a. at least once per month by verifying that the fuel storage tank contains at least 175 gallons of fuel.
b. at least once per 3 months by verifying that a sample of diesel fuel from the fuel-storage tank, obtained in accordance with ASTM D4057-81 or 04177-82, is within the acceptable limits specified in Table 1 of ASTM 0975-81 with respect to viscosity, water content, and sediment,
c. at least once per operatingcycigby subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for the class of service.
d. by demonstrating that the diesel starting 24-volt battery bank and charger are OPERABLE as follows:
1) at least once per week by verifying that the electrolyte level of each battery is above the plates and battery voltage is at least 24 volts.

Amendment No. 206b