Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000348/1985025 + (ML20151N977)
- ML20151N978 + (ML20151N978)
- ML20151N981 + (ML20151N981)
- ML20151N984 + (ML20151N984)
- B11931, Advises That Mods to Valve Operator & Limit Switch Logic of Return Line Valve MOV 1-IC-3 to Address Dominant Predicted Causes of Isolation Condenser Failure,Described in Probablistic Safety Study,Completed + (ML20151N985)
- ML20151N986 + (ML20151N986)
- ML20151N990 + (ML20151N990)
- IR 05000425/1988018 + (ML20151N993)
- ML20151N994 + (ML20151N994)
- ML20151N999 + (ML20151N999)
- ML20151P000 + (ML20151P000)
- ML20151P002 + (ML20151P002)
- ML20151P003 + (ML20151P003)
- ML20151P006 + (ML20151P006)
- DD-88-04, Advises That Time for Commission to Review Directors Decision DD-88-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 880412.Served on 880420 + (ML20151P008)
- ML20151P010 + (ML20151P010)
- ML20151P012 + (ML20151P012)
- ML20151P019 + (ML20151P019)
- ML20151P022 + (ML20151P022)
- ML20151P025 + (ML20151P025)
- ML20151P028 + (ML20151P028)
- ML20151P029 + (ML20151P029)
- A07122, Forwards Addl Info in Response to IE Bullentin 85-003 Re motor-operated Valve Common Mode Failures.Water Hammer Due to Valve Closure Not Considered in Determination of Pressure Differentials + (ML20151P035)
- PNO-I-85-095, on 851230,seal Failure on RCS Makeup Pump 1A Occurred,Spilling Approx 300 Gallons of Water on Floor.Nine Personnel Slightly Contaminated.Approx 46 Ci Released from Plant.Pump Drained.Personnel Cleaned Up Room + (ML20151P037)
- IR 05000373/1988005 + (ML20151P038)
- ML20151P040 + (ML20151P040)
- ML20151P041 + (ML20151P041)
- ML20151P043 + (ML20151P043)
- ML20151P046 + (ML20151P046)
- ML20151P047 + (ML20151P047)
- 3F1285-13, Responds to Violations Noted in Insp Rept 50-302/85-41. Corrective Actions:Procedure for Startup Revised to Add Signoff for Verification of Agreement W/Acceptance Criterion for Estimated Critical Position Calculations + (ML20151P048)
- ML20151P050 + (ML20151P050)
- ML20151P051 + (ML20151P051)
- ML20151P052 + (ML20151P052)
- ML20151P054 + (ML20151P054)
- ML20151P057 + (ML20151P057)
- ML20151P058 + (ML20151P058)
- ML20151P059 + (ML20151P059)
- ML20151P061 + (ML20151P061)
- ML20151P062 + (ML20151P062)
- ML20151P065 + (ML20151P065)
- ML20151P066 + (ML20151P066)
- ML20151P067 + (ML20151P067)
- IR 05000369/1985030 + (ML20151P070)
- ML20151P071 + (ML20151P071)
- ML20151P073 + (ML20151P073)
- ML20151P074 + (ML20151P074)
- ML20151P075 + (ML20151P075)
- ML20151P077 + (ML20151P077)
- ML20151P078 + (ML20151P078)
- ML20151P080 + (ML20151P080)