DNS VIHOINIA I5LECTHIC AND PowEn Cox1wNY lllC11MOND,VINGINJA 2 32G1 December 19, 1985 Vics Panasommt c.17 Neca. man OrmeATIONM g
r, c,
Dr. J. Nelson Grace Serial No.85-82j Regional Administrator NAPS /JHL:vlh Region II Docket Nos. 50-336 U. S. Nuclear Regulatory Commission 50-339 Suite 2900 License Nos. NPF.
101 Marietta St., N.W.
NPF-EO Atlanta, Georgia 30323 A
Dear Dr. Grace:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 REVISED RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 50-338/85-16 AND 50-339/85-16 We have reviewed your letter of November 20, 1985, which referred to our September 19,1985 response to violation example 5 of Inspection Report Nos. 50-338/85-16 and 50-339/85-16. Our revised response to violation example 5 is addressed in the attachment.
We have no objection to this inspection report being made a matter of public disclosure.
If you have any further questions, please contact me.
Very truly yours, O
1 W. L. Stewart g@
.i.
6
s.
Vsmonwu ELECTRIC AND Powns COMPANY TO Dr.
.J. Neison Grace
. cc:
Mr. Roger D. Walker, Director Division of Reactor Projects Mr. Lester S. Rubenstein, Director PWR Project Directorate # 2 Division of PWR Licensing - A Mr. M. W. Branch NRC Resident Inspector-North Anna Power Station A
. m
_ _ _ _.. _ _, _ _ _.. _ -. _ _ _ _. _ _. _ _ _ _. _ _ -. _ _. _ =. _. _ _. _ _ _ _ _. _ _ _. _ _ _. - _.
=
REVISED RESPONSE TO NOTICE OF VIOLATION ITEM REPORTED DURING NRC INSPECTION CONDUCTED FROM JUNE 3 TO JULY 7, 1985 INSPECTION REPORT NOS. 50-338/85-16 and 50-339/85-16 NRC CO:IMENT:
Technical Specification (TS) 6.8.1 requires that written procedures be established, implemented and maintained covering the areas recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, which includes the areas of equipment control (tagging and locking),
Emergency Core Cooling Systems, record retention and review and control of maintenance, repair and replacement and modification work.
Design Change Package (DCP) 84-26, Addition of Emergency Lighting North Anna 1 and 2, requires that all lamp heads in the designated areas be mounted eight feet plus or minus one foot above finished floor. Various lamp heads in areas where the above requirement applied were mounted above or below the specified heights.
Contrary to the above TS, the referenced procedure was not fully implemented.
This is a Severity Level V violation (Supplement I) and applies to both units.
RESPONSE
- 1. CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED:
Engineers in the Site Engineering Office (SEO) have been cautiched about the selection of words in the procedures for DCP's and Field Changes.
In addition, the tiolation has been distributed to the SEO engineers as required reading.
A copy of the violation and response was submitted to the Engineering and Construction (ESC) Department for review and possible inclusion into the DCP preparation standard STD-GN-0001. This review determined that the standard adequately addresses the preparation of DCPs and does not need to be revised.
2.
CGRRECTIVE STEPS WHICH WILL BE TAKEN TC AVOID FURTHER VIOLATIONS:
No further corrective actions are planned.
3.
THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED:
Full compliance has been achieved.
-