ML20151N978

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-425/88-18 on 880328-31.No Violations or Deviations Noted
ML20151N978
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/18/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151N982 List:
References
NUDOCS 8804260057
Download: ML20151N978 (2)


See also: IR 05000425/1988018

Text

e .

.

/

. APR 181988

Docket No. 50-425

1.icense No. CPPR-109

,

. Georgia Power Company

ATTN: Mr. George F. Head

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-425/88-18

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by A. Szczepaniec on March 28-31, 1988. The inspection included a review of

activities authorized for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

'

lS

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

8804260057 880418 [ \

PDR ADOCK 05000425

. O DCD &,

m .q.

..

..

APR 16M88:

.

'. .

. .

Georgia. Power Company 2

> .

cc.w/ enc 1:

P. D. Rice, Vice President, Project

Director

C. W. Hayes Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager,

Nuclear Operations

L..Gucwa, Manager, Nuclear Safety

and Licensing

J.'A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/ encl:

E. Reis, 0GC

J. Hopkins, NRR

M. Sinkule, RI!

DRS Technical Assistant

NRC Resident Inspector

Document Control Desk

"

State of Georgia

l

l

l

RII RII RII

I P,p

ASzczepaniec:ser FJap MSinkule

04/g/88 04/ /88 04/f/88

l

..