Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151L626 + (ML20151L626)
- ML20151L629 + (ML20151L629)
- ML20151L631 + (ML20151L631)
- B12888, Proposed Tech Specs,Allowing Startup of Plant While Utilizing Provisions of Tech Spec 3.6.3 + (ML20151L633)
- ML20151L636 + (ML20151L636)
- ML20151L637 + (ML20151L637)
- 05000368/LER-1985-025, :on 851118,control Element Assembly Calculator Monthly Functional Test Not Performed.Caused by Personnel Error & Conflicting Monthly Test Schedules.Schedules Restructured & Personnel Counseled + (ML20151L638)
- NSD-NRC-97-5244, Informs That Licensee Will Submit SSAR Revs,Revs to Certified Design Matl & Revs to PRA for AP600 Under Oath or Affirmation IAW 10CFR52.45(d) & 10CFR50.30(b) in Response to + (ML20151L639)
- ML20151L641 + (ML20151L641)
- ML20151L642 + (ML20151L642)
- ML20151L645 + (ML20151L645)
- ML20151L650 + (ML20151L650)
- ML20151L654 + (ML20151L654)
- ML20151L656 + (ML20151L656)
- ML20151L658 + (ML20151L658)
- ML20151L659 + (ML20151L659)
- ML20151L662 + (ML20151L662)
- 05000414/LER-1988-023, :on 880620,main Feedwater Pump Turbine 2A Automatically Tripped on Low Bearing Oil Pressure.Caused by Failed Cutler Hammer Model E30JY8 Pushbutton Switch.Faulty Pushbutton Switch Replaced by Personnel + (ML20151L663)
- ML20151L667 + (ML20151L667)
- ML20151L670 + (ML20151L670)
- ML20151L671 + (ML20151L671)
- ML20151L672 + (ML20151L672)
- 05000528/LER-1985-077, :on 851121,balance-of-plant ESFAS (BOP-ESFAS) Train a Containment Purge Isolation Actuation Signal Initiated.Caused by Improper Reset by Control Room Operator Trainee + (ML20151L673)
- ML20151L674 + (ML20151L674)
- ML20151L676 + (ML20151L676)
- ML20151L677 + (ML20151L677)
- 05000528/LER-1985-091, :on 851122,outstanding Valve Retest Discovered on Shutdown Cooling Isolation Valve.Caused by Misinterpretation of Retest Requirements.Surveillance Test Procedure Performed & Valve Declared Operable + (ML20151L678)
- 05000266/LER-1997-032, :on 970630,discovered Inadequately Rated Electrical Buses Could Disable Switchgear & Cause Secondary Fires.Caused by Characteristic of Original Design. Established twice-per-shift Fire Watches + (ML20151L681)
- ML20151L683 + (ML20151L683)
- IR 05000293/1988020 + (ML20151L685)
- ML20151L686 + (ML20151L686)
- ML20151L688 + (ML20151L688)
- ML20151L693 + (ML20151L693)
- 05000373/LER-1985-068-01, :on 851124,attempt Made to Start RHR Sys a in Shutdown Cooling Mode,Causing Isolation Due to High Flow. Caused by RHR Sys Not Being in Svc for Several Wks.Sys Refilled & Vented Per LOP-RH-06 + (ML20151L695)
- PY-CEI-NRR-0890, Forwards Updated Response to Generic Ltr 87-14 Re Operator Licensing Exam Schedule for Plant.Update Reflects Change in Dates for Annual Requalification Exam to Wk of 890619,per 880718 Telcon + (ML20151L696)
- ML20151L698 + (ML20151L698)
- ML20151L699 + (ML20151L699)
- IR 05000298/1985028 + (ML20151L700)
- ML20151L701 + (ML20151L701)
- ML20151L703 + (ML20151L703)
- ML20151L706 + (ML20151L706)
- ML20151L707 + (ML20151L707)
- 05000458/LER-1985-043, :on 851121,reactor Water Cleanup HX Room Temp Switch Trip Setpoint Found Outside Tech Spec Limit.Caused by Error in Approved Surveillance Procedure.Procedure Revised + (ML20151L708)
- ML20151L709 + (ML20151L709)
- ML20151L710 + (ML20151L710)
- 3F0897-24, Provides Suppl Info for NRC to Consider When Evaluating OL Amend Request to Remove Portion of License Condition 2.C.(5) Which Deals W/Measurement of Decay Heat Dropline Flow + (ML20151L716)
- AECM-88-0145, Requests That Enforcement Discretion Be Exercised on Tech Specs Section 6.5.1.2 & Listed Figures Re Consolidation of Engineering Expertise Into One Dept Recommendations of 1987 Evaluation + (ML20151L717)
- ML20151L718 + (ML20151L718)
- ML20151L721 + (ML20151L721)
- 05000368/LER-1988-012, :on 880430,setpoint Discrepancies Discovered During in Situ Testing of Pressurizer Code Safety Valves. Cause Re Differences in Stated Test Methods.Adjustments Made to Valves 2PSV-4633 & 2PSV-4634 + (ML20151L723)
- ML20151L726 + (ML20151L726)