21 JUL 1988
Docket No. 50-293
Boston Edison Company
ATTN: -Mr. Ralph G. Bird-
Senior Vice President - Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection Number 50-293/88-20
This letter refers to the special inspection conducted by Mr. H. J. Kaplan of
this office on May 2-6, 1988 at the Pilgrim Nuclear Power Station, Plymouth,
Massachusetts and in the Region 1 office the week of June 6,1988. The purpose
of the inspection was to determine if the licensee had modified the Pilgrim
Plant containment in accordance with the commitments to NRC concerning Unre-
solved Safety Issue (USI) A-7.
Mr. Kaplan focused his attention on the QA
aspects of the modification involving materials, welding, and NDE.
At the inspection exit meeting on May 6, 1988, Mr. Kaplan informed
Mr. K. Highfill of your staff that he was unable to verify with complete
certainty that the modification work performed by Graver Energy Systems, the
principal installer, was in complete agreement with the specified requirements;
,
Although extensive modification records existed in the form of microfiche, key
documents that were necessary to correlate the records to specific hardware
installed in the plant were not available.
Mr.
glan requested that your
staff retrieve the key documents, which apparencly had not been microfilmed and
assemble the records to permit a meaningful. assessment.
Subsequently,'on
June 8,1988, Mr. P. Hamilton and Mr.
M.- Andrews of your staff presented
collated document packages to Mr. Kaplan for his review at our Regional Office
in King of Prussia. Mr. Kaplan conducted his review of the submitted document
packages and concluded the records satisfactorily demonstrated that the modi-
fication of the Mark I Containment had been performed in accordance with the
specified installation requirements.
Wi".hin the scope of this investigation, no violations were observed; however,
we do want to emphasize that records of' activities that could affect plant
quality, such as plant modifications, should be readily retrievable.
I
No reply to this letter is required.
,
&B00107gg9,g,
.
t
l
0
DOcM 05000293
l
PNV
0FFICIAL RECORD COPY
IR PILGRIM 88-20 - 0001.0.0
l
07/14/88
g (
DE~C (
i-
<
.
'
.
.
Boston Edison Company
2
-
Your cooperation with us in this matter is appreciated.
Sincerely,
f[f]]};II'"f4Byr'
Jacque P. Durr
Chief, Engineering Branch
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report Number 50-203/88-20
cc w/ encl:
K. Highfill, Station Director
R. Anderson, Plant Manager
J. Keyes, Licensing Division Manager
E. Robinson, Nuclear InformationManager
R. Swanson, Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
The Honorable Peter V. Forman
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MASSPIRG
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
0FFICIAL RECORD COPY
IR PILGRIM 88-20 - 0002.0.0
07/14/88
.
'
.
Boston Edison Compai,y
3
bcc w/ enc 1:
Region I Docket Room (with concurrences)
M. Perkins, Management Assistant, DRMA (w/o encl)
S. Collins, DRP
R. Blough, DRP
L. Doerflein, DRP
R. Bores, DRSS
PA0 (15) SALP Reports and All Inspection Reports
C. Y. Cheng, NRR
G. Bagchi, NRR
T. Marsh, NRR
b
4 .K
RI: RS
MI:DRS
RI:DRS
Kaplan/ tim /rw
Strosnider
Durr
7/1 /88
7/l$/88
7/Jo/88
0FFICIAL RECORD COPY
IR PILGRIM 88-20 - 0003.0.0
07/07/88
-