Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151K967 + (ML20151K967)
- 0CAN079708, Discusses Errors or Changes in ECCS Evaluation & Annual Rept for 1996.Significant Error Notification Previously Reported & Brief Summary of Generic Analyses & Evaluations Performed Since Previous Annual Rept Encl + (ML20151K969)
- ML20151K971 + (ML20151K971)
- ML20151K973 + (ML20151K973)
- LR-N970491, Provides Replacement Page of Attachment 3 to Ltr LR-N970217 Dtd 970619,re RSCS Elimination & RWM Low Power Setpoint Reduction.Page Was Inadvertently Omitted + (ML20151K974)
- ML20151K979 + (ML20151K979)
- IR 05000456/1988019 + (ML20151K980)
- ML20151K982 + (ML20151K982)
- ML20151K984 + (ML20151K984)
- NPL-97-0420, Submits 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. SERs Discussed Contained in WCAP-13565 + (ML20151K985)
- IR 05000458/1984023 + (ML20151K987)
- 3F0897-21, Forwards Emergency Operating Procedures W/Proposed Changes to Reflect TS Change Request Notice 210 Re Mitigation of Small Break Loss of Coolant Accidents & Associated Licensing Design Basis Change + (ML20151K990)
- ML20151K991 + (ML20151K991)
- ML20151K992 + (ML20151K992)
- ML20151K993 + (ML20151K993)
- 05000368/LER-1988-004-01, :on 880211,observed Degraded Sys Flow Led to Discovery That Vol Damper in Sys Ductwork to Control Room Closed.Caused by Failure to Provide Locking Device to Prevent Wingnut from Loosening by Vibration + (ML20151K994)
- ML20151K996 + (ML20151K996)
- ML20151L000 + (ML20151L000)
- ML20151L001 + (ML20151L001)
- 0CAN079709, Forwards Response to Violations Noted in Insp Repts 50-313/97-13 & 50-368/97-13.Corrective Actions:Check Valves BW-4A,BW-4B,2BS-1A & 2BS-1B Successfully Tested to Demonstrate Their Ability to Close + (ML20151L002)
- ML20151L004 + (ML20151L004)
- PNO-III-97-065, on 970805,Westinghouse Circuit Breaker Failed to Open on Demand During Planned Change of Pumps in RHR Sys. RHR Sys Provides Reactor Cooling While Plant Shut Down.Nrc Augmented Insp Team Dispatched to Plant to Review Breaker + (ML20151L005)
- ML20151L009 + (ML20151L009)
- ML20151L011 + (ML20151L011)
- 05000313/LER-1985-012, :on 851121,plug Found Installed in Place of Fusible Sprinkler Head in Lower South Electrical Penetration Room.Caused by Failure of Personnel to Maintain Test Control.Plug Replaced W/Fusible Sprinkler Head + (ML20151L014)
- ML20151L017 + (ML20151L017)
- ML20151L018 + (ML20151L018)
- ML20151L019 + (ML20151L019)
- ML20151L024 + (ML20151L024)
- PNO-II-88-043B, on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems + (ML20151L025)
- ML20151L026 + (ML20151L026)
- ML20151L027 + (ML20151L027)
- ML20151L028 + (ML20151L028)
- ML20151L029 + (ML20151L029)
- ML20151L032 + (ML20151L032)
- ML20151L035 + (ML20151L035)
- IR 05000193/1988002 + (ML20151L036)
- ML20151L038 + (ML20151L038)
- ML20151L039 + (ML20151L039)
- ML20151L041 + (ML20151L041)
- ML20151L044 + (ML20151L044)
- ML20151L050 + (ML20151L050)
- ML20151L053 + (ML20151L053)
- ML20151L056 + (ML20151L056)
- ML20151L059 + (ML20151L059)
- ML20151L061 + (ML20151L061)
- IR 05000416/1988014 + (ML20151L062)
- ML20151L064 + (ML20151L064)
- ML20151L065 + (ML20151L065)
- ML20151L066 + (ML20151L066)
- ML20151L067 + (ML20151L067)