2 9 JUL 1988 a
Mr. Neil P. Smith, Chairman Seismic Qualification Utility Group 801 18th Street N.W.
Suite 300, KMC, Inc.
Washington, DC 20006
Dear Mr. Smith:
The NRC staff has reviewed the Generic Implementation Procedure (GIP),
Revision 0, dated June 1988 and the related documents and reports supporting the GIP, submitted by the Seismic Qualification Utility Group (SQUG). The enclosed Generic Safety Evaluation Report (SER) documents NRC staff review and evaluation of these documents.
In this SER, the staff endorses those parts of the GIP which have been completed and considered to be acceptable for the implementation of USI A-46 provided that open issues listed at the end of each topic are adequately and expeditiously resolved.
There are a few topics that have not yet been completed in the GIP and are still under development by the SQUG.
The review and evaluation of those inct.iplete portions of the GIP and the associated documents and reports will be addressed in future supplements to this SER.
We, therefore, request that you disseminate this Generic SER to the SQUG member utilities and remind them that they are requiced to provide within 60 days of receipt of this letter a schedule for implementation of the seismic verification program at each of their facilities.
Sincerely, Lawrence C. Shao, Director Division of E:1gineering & Systems Technology Office of Nuclear Reactor Regulation
Enclosure:
Generic Safety Evaluation Report cc:
R. E. Shaffstall, M4C DISTRIBUTION:
RES Chron/ Circ TYChang NAnderson RDaer RBosnak TMarsh GBagchi MHodges SNewberry PYChen JRichardson Central Files PDR OFFICIAL RECORD COPY l
'b b
DSIR:REjL DSIR:PM /
NRR EMER:NRR ESG :NRR TYChang
- NAnders W; t
RBaer RB nak PYChen TMarsh GBagchi 7 /z7/88
'?/ 77/88 7 /2//88 7
7/88 7/g//88y}/$/88 7 / /88 L
hN P
- RR EAD:NRR MHodges St w erry JRichprdson Shao g /p/88
}/;G/88 f/,17/88 g / /88 gB030335800729 M
REvcP gngggug l
PNu
4 j#'"*%
UNITED STATES r1 f ;;
NUCLEAR REGULATORY COMMISSION WASWNG ton, D. C. 20555 e
2 9 JUL 1963 Mr. Neil P. Smith, Chairman Seismic Qualification Utility Group 801 18th Street N.W.
Suite 300, KMC, Inc.
Washington, DC 20006
Dear Mr. Smith:
The NRC staff has reviewed the Generic Implementation Procedure (GIP),
Revision 0, dated June 1988 and the related documents and reports supporting the GIP, submitted by the Seismic Qualification Utility Group (SQUG).
The enclosed Generic Safety Evaluation Report (SER) documents NRC staff review and evaluation of these documents.
In this SER, the staff endorses those parts of the GID which have been completed and considered to be acceptable for the impletantation of USl A-46 provided that open issues listed at the end of each topi(. are adequately and expeditiously resolved.
There are a few topics that have not yet been completed in the GIP and are still under development by the SQUG. The review and evaluation of those incomplete portions of the GIP and the associated documents and reports will be addressed in future supplements to this SER.
We, therefore, request that you disseminate this Generic SER to the SQUG member utilities and remind them that they are required to provide within 60 days of receipt of this letter a schedule for implementation of the seismic verification program at each of their facilities.
Sincerely,
(
Lawrence C. Shao, Director Division of Engineering & Systems Technology Office of Nuclear Reactor Regulation
Enclosure:
Generic Safety Evaluation Report cc: