Summary of 880127 CRGR Meeting 128 Re Listed Items,Including Review of Proposed Generic Ltr to Inform Licensees of New NRC Position on Guidelines for Determining Whether Operating Basis Earthquake Limits Exceeded
ML20151L065
Person / Time
Issue date: 04/04/1988
From: Jordan E
Committee To Review Generic Requirements
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
NUDOCS 8804210482
Download: ML20151L065 (2)


Text

.

pa EtCoq'o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 g

j/

April 4, 1988

+...+

MEMORANDUM FOR:

Victor Stello, Jr.

Executive Director for Operations FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 128 The Committee to Review Generic Requirements (CRGR) met on Wednesday, January 27, 1988, from 1-5 p.m.

A list of attendees for this meeting is enclosed (Enclosure 1).

The following items were addressed at the meeting:

1.

L. Shao (NRR) and L. Reiter (NRR) presented for CRGR review a proposed Generic Letter to inform licensees regarding a new NRC staff position on guidelines for determining whether the Operating Basis Earthquake (08E) limits have been exceeded if their sites are affected by a seismic event.

The Committee recommended in favor of issuing the proposed Generic Letter, subject to a number of minor wording revisions to be coordinated with the CRGR staff.

This matter is discussed in Enclosure 2.

2.

The Committce reviewed a proposed NRC Bulletin on Steam Generator Tube Rupture requesting that PWR licensees take certain actions to assure that their plants are not susceptible to the rapidly propagating fatigue mechanisms that led to the SG tube rupture event at the North Anna facility on July 15, 1987.

The Committee recommended in favor of issuing the proposed bulletin, subject to several minor wording changes that are to be coordinated with the CRGR staff.

This matter is discussed in.

3.

The briefing for CRGR by OGC on applicability of 10CFR50.54(f) to proposed 10CFR21 amendments that was scheduled earlier for this meeting was cancelled.

(

4.

The Committee reviewed a proposed NRC Bulletin requesting that licensees make a one-time inspection of Westinghouse Series OS circuit breakers used in Class 1E applications at their facilities and take necessary corrective actions if those components do not meet acceptance criteria included in the bulletin.

The Committee recommended in favor of issuing the proposed bulletta, subject to minor changes to be coordinated with the CRGR staff.

The Committee also recommended that the EDO direct the staff to reconsider a requirement for diverse (ATWS-related) scram systems in Westinghause PWRs, in view of continuing adverse operating experience with the components that are the subject of this bulletin (and J

/

other previous generic communications from the staff).

This matter is discussed in Enclosure 4.

im' l'

8804210482 880404 PDR REVGP NRCCRGR M

MEETINQ128 PDR

s

_g.

5.

The Committee reviewed, and recommended in favor of forwarding to the Commission, a proposed final Amendment to 10CFR73, Appendix B, that would eliminate _the existing schedule link between the annual physical fitness test and the preceding medical examination now required for all armed security personnel at nuclear facilities.

The Committee also endorsed the CRGR Chairman's determination regarding the disposition of two other potential CRGR review items that had been identified by RES.

These matters are discussed in Enclosure 5.

In accordance with the ED0's July 18, 1983 directive concerning "Feedbnck and Closure on CRGR Reviews," a written response is required from the cogrizant office to report agreement or disagreement with CRGR recommendations in these minutes.

The response, which is required within five working days after receipt of these meeting minutes, is to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the ED0 for decisionmaking.

Questions concerning these meeting minutes should be referred to Jim Conran (492-9855).

cen.i si d &

E. O Jorden Edward L. Jordan, Chairman Committee to Review Generic Requirements

Enclosures:

we<

As stated g, t k,m.

cc w/ enclosures:

Distribution: w/o encl.

Commission (5) c' Central File's i

SECY PDR (NRC/CRGR)

Office Directors S. Treby Regional Administrators W. Little CRGR Members M. Lesar W. Parler B. Doolittle (w/ enc.)

i L. Shao CRGR SF (w/ enc.)

L. Reiter CRGR CF (w/ enc.)

E. Rossi M. Taylor (w/ enc.)

J. Conran (w/ enc.)

J. Heltemes (w/ enc.)

C. Sakenas (w/ enc.)

0FC :CRGR:AE00 AE0D-)D

C/C (Af t

4--f~

4

/- '

NAME :J rfr3n: cg : CJ

'temes :

6,0 an DATE : 3// /88 3/ I/88 3/2}/88 OFFICIAt. RECORD COPY

.