Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149G252 + (ML20149G252)
- ML20149G254 + (ML20149G254)
- ML20149G255 + (ML20149G255)
- ST-HL-AE-2503, Monthly Operating Rept for Jan 1988 + (ML20149G256)
- ML20149G257 + (ML20149G257)
- 05000370/LER-1988-001-01, :on 880112,steam Generator Level Deviation Alarm Received in Control Room.Caused by Design & Const/ Installation Deficiency.Operational Protection Sys Implemented Reactor Trip Recovery Procedure + (ML20149G258)
- ML20149G259 + (ML20149G259)
- ML20149G260 + (ML20149G260)
- ML20149G261 + (ML20149G261)
- B16566, Responds to RAI Re Erosion of Cement from Underlying Porous Concrete Drainage Sys + (ML20149G262)
- 05000327/LER-1988-005, :on 880116,turbine Bldg Sump Release Line Radiation Monitor Inappropriately Declared Operable on 880115 Resulting in Failure to Take Grab Samples for 25.5 H. Caused by Operator Error.Grab Samples Resumed + (ML20149G263)
- BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 + (ML20149G264)
- ML20149G265 + (ML20149G265)
- ML20149G266 + (ML20149G266)
- ML20149G269 + (ML20149G269)
- ML20149G270 + (ML20149G270)
- ML20149G271 + (ML20149G271)
- ML20149G272 + (ML20149G272)
- ML20149G273 + (ML20149G273)
- BVY-94-101, Monthly Operating Rept for Sept 1994 for Vermont Yankee Nuclear Power Station + (ML20149G274)
- ML20149G276 + (ML20149G276)
- ML20149G277 + (ML20149G277)
- ML20149G279 + (ML20149G279)
- NRC-94-0085, Monthly Operating Rept for Sept 1994 for Fermi 2 + (ML20149G280)
- ML20149G281 + (ML20149G281)
- ST-HL-AE-2500, Application for Amend to License NPF-71,revising Tech Spec 3.5.3.1 to Clarify Limiting Condition for Operation for High Head Safety Injection Pumps in Mode 4.Fee Paid + (ML20149G283)
- ML20149G285 + (ML20149G285)
- ML20149G289 + (ML20149G289)
- PY-CEI-NRR-1871, Monthly Operating Rept for Sept 1994 for Perry Nuclear Power Plant + (ML20149G290)
- ML20149G291 + (ML20149G291)
- SVP-94-048, Forwards Response to Violations Noted in Insp Repts 50-456/94-18 & 50-457/94-18.Response Withheld + (ML20149G292)
- ML20149G293 + (ML20149G293)
- 1CAN109401, Monthly Operating Rept for Sept 1994 for ANO Unit 1 + (ML20149G294)
- U-602354, Monthly Operating Rept for Sept 1994 for Clinton Power Station Unit 1 + (ML20149G296)
- IR 05000361/1997008 + (ML20149G297)
- ML20149G298 + (ML20149G298)
- PY-CEI-NRR-1834, Forwards Rev 19 to Security Plan.Changes in Rev Made,Per 10CFR50.54(p).Rev Withheld + (ML20149G299)
- ML20149G300 + (ML20149G300)
- 05000370/LER-1987-018-01, :on 870921,inoperable Fire Barrier Due to Wall Section Being Constructed W/O Proper End Connection Found. Caused by Const/Installation Deficiency.Four Fire Barriers Which Were Inoperable Were Repaired + (ML20149G303)
- ML20149G304 + (ML20149G304)
- BVY-94-100, Transmits Summary Rept Related to 10CFR50,App R Lighting Issue Recently Discovered at Plant.Related Procedures Reviewed & Concluded That Existing Procedures & Training Adequate to Achieve Safe Shutdown in Event of Fire + (ML20149G305)
- RC-97-0128, Requests Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements + (ML20149G307)
- ML20149G309 + (ML20149G309)
- ML20149G310 + (ML20149G310)
- ML20149G311 + (ML20149G311)
- ML20149G316 + (ML20149G316)
- ML20149G318 + (ML20149G318)
- IR 05000285/1997011 + (ML20149G320)
- ML20149G322 + (ML20149G322)
- ML20149G323 + (ML20149G323)