Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149E139 + (ML20149E139)
- ML20149E141 + (ML20149E141)
- ML20149E142 + (ML20149E142)
- ML20149E143 + (ML20149E143)
- IR 05000352/1997003 + (ML20149E146)
- ML20149E148 + (ML20149E148)
- ML20149E149 + (ML20149E149)
- ML20149E152 + (ML20149E152)
- ML20149E153 + (ML20149E153)
- ML20149E154 + (ML20149E154)
- ML20149E157 + (ML20149E157)
- ML20149E159 + (ML20149E159)
- ML20149E161 + (ML20149E161)
- ML20149E162 + (ML20149E162)
- ML20149E166 + (ML20149E166)
- ML20149E168 + (ML20149E168)
- ML20149E172 + (ML20149E172)
- ML20149E173 + (ML20149E173)
- ML20149E174 + (ML20149E174)
- DCL-84-022, Requests Errata to Encl Sser 21,Page 2-185,Allegation 82. Review of Sser 21 Indicated Some Factural Errors on Markup of Page 2-185 + (ML20149E177)
- JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant + (ML20149E181)
- ML20149E182 + (ML20149E182)
- IR 05000395/1987035 + (ML20149E183)
- IA-97-222, Final Response to FOIA Request for Documents.Records Subj to Request Identified in App a Already Available in PDR + (ML20149E184)
- ML20149E184 + (ML20149E184)
- ML20149E185 + (ML20149E185)
- ML20149E187 + (ML20149E187)
- ML20149E190 + (ML20149E190)
- ML20149E191 + (ML20149E191)
- PY-CEI-NRR-0763, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-16.Corrective Actions:Instruction PTI-N27-P0001 Revised to Require Each Feedwater Pump Controller to Be Placed in Manual Prior to Testing Associated Feedwater Pump + (ML20149E193)
- ML20149E194 + (ML20149E194)
- ML20149E196 + (ML20149E196)
- ML20149E199 + (ML20149E199)
- ML20149E200 + (ML20149E200)
- ML20149E202 + (ML20149E202)
- ML20149E203 + (ML20149E203)
- ML20149E204 + (ML20149E204)
- ML20149E205 + (ML20149E205)
- ML20149E209 + (ML20149E209)
- DCL-84-045, Submits Design & Const Status of Design Change Notice DCO-EE-446 Re Control Room Ventilation & Pressurization Sys. Design & Const Complete.Repair,Testing Activities & Resolution Scheduled to Be Completed by 840215 + (ML20149E214)
- IA-97-236, Final Response to FOIA Request for Documents.Forwards Document Listed in App a Being Made Available in PDR + (ML20149E215)
- ML20149E215 + (ML20149E215)
- B12767, Submits Comments on Draft SRP Section 3.6.3, Leak-Before- Break Evaluation Procedures, Per Amend to GDC 4 of 10CFR50, App A.Utils Endorse Comments by Nuclear Util Group on Equipment Qualification + (ML20149E219)
- ML20149E223 + (ML20149E223)
- ML20149E224 + (ML20149E224)
- ML20149E226 + (ML20149E226)
- ML20149E227 + (ML20149E227)
- ML20149E228 + (ML20149E228)
- ML20149E229 + (ML20149E229)
- ML20149E230 + (ML20149E230)
- ML20149E231 + (ML20149E231)