Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140E372 + (ML20140E372)
- ML20140E373 + (ML20140E373)
- ML20140E374 + (ML20140E374)
- ML20140E375 + (ML20140E375)
- ML20140E376 + (ML20140E376)
- ML20140E377 + (ML20140E377)
- ML20140E378 + (ML20140E378)
- ML20140E379 + (ML20140E379)
- ML20140E380 + (ML20140E380)
- ML20140E381 + (ML20140E381)
- ML20140E382 + (ML20140E382)
- ML20140E383 + (ML20140E383)
- ML20140E385 + (ML20140E385)
- 05000338/LER-1984-024-01, :on 841206,QA Audit Identified Five Periodic Tests Not Performed within Required Surveillance Intervals. Caused by Communication Breakdown Between Depts.Process to Track Overdue Tests Being Reviewed + (ML20140E386)
- ML20140E387 + (ML20140E387)
- ML20140E388 + (ML20140E388)
- ML20140E389 + (ML20140E389)
- 05000339/LER-1984-013-03, :on 841207 & 09,emergency Diesel Generators 2J & 2H Tripped,Respectively.Facility Shut Down.Cause Not Stated.Maint Performed.Both Emergency Diesel Generators Restored to Operable Status + (ML20140E391)
- ML20140E392 + (ML20140E392)
- 05000409/LER-1984-023, :on 841207,inner Door Upper & Lower Handwheel Shaft Mechanical Seals of Personnel Airlock Leaked Air in Excess of Acceptance Criteria.Both Inner Door Handwheel Shaft Seals Replaced + (ML20140E394)
- 05000483/LER-1984-062, :on 841207,inadvertent ESF Actuation Resulted in Containment Purge Isolation Signal & Control Room Ventilation Isolation Signal.Caused by Blown Fuse.Fuse Replaced + (ML20140E396)
- ML20140E397 + (ML20140E397)
- B11904, Forwards Descriptions of Procedures for Insps of Water Control Structures & Methods of Addressing NRC Concerns Re SEP Topic III-3.C, Inservice Insp of Water Control Structures & Isap Topic 1.29, Flooding Evaluation + (ML20140E398)
- ML20140E399 + (ML20140E399)
- ML20140E400 + (ML20140E400)
- ML20140E402 + (ML20140E402)
- ML20140E403 + (ML20140E403)
- ML20140E404 + (ML20140E404)
- ML20140E405 + (ML20140E405)
- ML20140E406 + (ML20140E406)
- 05000334/LER-1984-006-01, :on 840621,test Methods Used on 120-volt Dc Station Batteries Determined Inadequate.Cause Not Stated. Station Batteries Replaced.New Battery Duty Curves & Test Procedures Developed + (ML20140E407)
- ML20140E408 + (ML20140E408)
- ML20140E409 + (ML20140E409)
- ML20140E410 + (ML20140E410)
- 1CAN128410, Ack Receipt of NRC 841120 Request for Addl Info Re Second 10-yr Inservice Insp Program.Due to Current Refueling Outage Activities & Mail Delays,Response Delayed Until 850131 + (ML20140E411)
- ML20140E412 + (ML20140E412)
- B11313, Submits Addl Justification or Clarification for 10 Open Items from SER for SEP Topic III-5.A, High Energy Pipe Break Inside Containment, Per Section 4.8 of NUREG-0826, Integrated Plant Safety Assessment,Haddam Neck Plant + (ML20140E413)
- IR 05000277/1984025 + (ML20140E414)
- ML20140E416 + (ML20140E416)
- ML20140E417 + (ML20140E417)
- ML20140E419 + (ML20140E419)
- ML20140E421 + (ML20140E421)
- ML20140E422 + (ML20140E422)
- ML20140E423 + (ML20140E423)
- ML20140E424 + (ML20140E424)
- ML20140E425 + (ML20140E425)
- ML20140E427 + (ML20140E427)
- ML20140E430 + (ML20140E430)
- ML20140E433 + (ML20140E433)
- ML20140E434 + (ML20140E434)
- ML20140E436 + (ML20140E436)