Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140B961 + (ML20140B961)
- ML20140B962 + (ML20140B962)
- ML20140B963 + (ML20140B963)
- ML20140B964 + (ML20140B964)
- PNO-I-86-006, on 860123,facility Achieved Initial Criticality.Criticality Boron Concentration Was 1,591 Ppm, 32 Ppm Above Predicted Concentration & within Tech Spec Max Margin of 100 Ppm + (ML20140B965)
- IR 05000313/1997009 + (ML20140B966)
- 05000278/LER-1986-002-02, :on 860217,RWCU Sys Isolated While Unit in Shutdown Mode.Caused by Deenergization of RWCU Sys Nonregenerative HX Outlet Temp Switch by Technicians.Design Change Being Considered + (ML20140B967)
- 05000333/LER-1997-004-01, :on 970428,safety Relief Valve Failed to Open During Setpoint Verification Testing.Caused by Presence of Small Screw.Revised Target-Rock 2-Stage SRV Assembly Test Procedures,Reported Per 10CFR21 + (ML20140B969)
- ML20140B970 + (ML20140B970)
- ML20140B971 + (ML20140B971)
- ML20140B973 + (ML20140B973)
- ML20140B974 + (ML20140B974)
- ML20140B975 + (ML20140B975)
- ML20140B977 + (ML20140B977)
- ML20140B978 + (ML20140B978)
- ML20140B980 + (ML20140B980)
- ML20140B981 + (ML20140B981)
- ML20140B982 + (ML20140B982)
- ML20140B984 + (ML20140B984)
- ML20140B985 + (ML20140B985)
- ML20140B987 + (ML20140B987)
- ML20140B988 + (ML20140B988)
- ML20140B990 + (ML20140B990)
- ML20140B991 + (ML20140B991)
- ML20140B992 + (ML20140B992)
- ML20140B994 + (ML20140B994)
- ML20140B995 + (ML20140B995)
- ML20140B996 + (ML20140B996)
- ML20140B998 + (ML20140B998)
- SNRC-1227, Responds to Fire Protection Issues Noted in Special Insp Rept 50-322/84-46.Steps Taken to Release Fire Watches Described in Sser 9,Section 9.5.2.4 Include Amending License NPF-36 to Ack Fire Detector Distribution + (ML20140B999)
- ML20140C000 + (ML20140C000)
- ML20140C001 + (ML20140C001)
- ML20140C002 + (ML20140C002)
- ML20140C003 + (ML20140C003)
- ML20140C006 + (ML20140C006)
- ML20140C007 + (ML20140C007)
- ML20140C009 + (ML20140C009)
- ML20140C010 + (ML20140C010)
- ML20140C012 + (ML20140C012)
- 05000263/LER-1997-004, :on 970220,failure to Submit Relief Requests for Limited ISI Exams Discovered.Caused by Missed Interpretation of Sections.Required Relief Requests Will Be Submitted for Limited Exams Performed in Future + (ML20140C013)
- ML20140C014 + (ML20140C014)
- ML20140C015 + (ML20140C015)
- ML20140C017 + (ML20140C017)
- IR 05000271/1985038 + (ML20140C020)
- ML20140C021 + (ML20140C021)
- ML20140C022 + (ML20140C022)
- ML20140C023 + (ML20140C023)
- ML20140C024 + (ML20140C024)
- ML20140C025 + (ML20140C025)
- 3F0397-17, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/96-18.Corrective actions:SS-205 Was Revised to Include Operation of New Sys + (ML20140C026)
- ML20140C027 + (ML20140C027)