Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138P778 + (ML20138P778)
- ML20138P779 + (ML20138P779)
- ML20138P780 + (ML20138P780)
- ML20138P781 + (ML20138P781)
- ML20138P782 + (ML20138P782)
- ML20138P784 + (ML20138P784)
- ML20138P785 + (ML20138P785)
- ML20138P787 + (ML20138P787)
- ML20138P788 + (ML20138P788)
- ML20138P790 + (ML20138P790)
- ML20138P792 + (ML20138P792)
- U-600357, Final Deficiency Rept 55-85-09 Re Inadequate Implementation of Design Change Documents by Baldwin Assoc & Improper Use of Field Interference Notice by Zack Co.Initially Reported on 850816.Condition Not Reportable Under 10CFR50.55(e) + (ML20138P796)
- ML20138P798 + (ML20138P798)
- ML20138P800 + (ML20138P800)
- ML20138P801 + (ML20138P801)
- 05000260/LER-1985-016-02, :on 850606,excessive Setpoint Drift Discovered During Bench Testing.On 850722,factory Testing by Automatic Switch Co Confirmed TVA Test Data.Four Switches Returned to Factory + (ML20138P802)
- 05000245/LER-1985-028, :on 851122,possible IGSCC Identified in Several Welds on Both Jet Pump Instrumentation Assemblies.Cause Not Stated.Indications Repaired Using Weld Overlay Technique.W/ + (ML20138P804)
- ML20138P808 + (ML20138P808)
- 05000298/LER-1985-017, :on 851122,HPCI Sys Deemed Inoperable During Startup Operability Testing After Turbine Outage.Caused When Reactor Pressure Exceeded 113 Psig & Operators Unable to Confirm Opening of Injection Valve Disc + (ML20138P812)
- 05000369/LER-1985-036-01, :on 851119,reactor Tripped Due to Feedwater Pump Turbine Trip on High Discharge Pressure.Caused by Rod Control Sys Not Lowering Power Enough During Turbine Runback.Failed Fuse Will Be Replaced + (ML20138P814)
- RBG-22779, Special Rept:On 851111,thermocouples in North Main Steam Tunnel Indicated Temps in Excess of Tech Spec 3/4.7.8 Max Area Temp.Thermocouples to Be Relocated from Close Proximity of Hot Piping + (ML20138P816)
- 05000325/LER-1985-064, :on 851122,automatic Isolation of Units 1 & 2 Common Control Bldg HVAC Sys Occurred.Caused by Spurious Actuation of Sys Air Intake Plenum Chloride Detector 2X-AT-2977 + (ML20138P818)
- 05000324/LER-1985-012-02, :on 851122,unit Scrammed & Automatic Initiation of Primary Containment Groups 2 & 6 Isolation Valves Occurred on Low Level.Possibly Caused by Real or Sensed Flow Perturbation + (ML20138P826)
- 05000368/LER-1985-022, Corrects Forwarding LER 85-022-00.Unit,docket & License Number Incorrectly Listed on Cover Ltr 2CAN118503 + (ML20138P829)
- 05000309/LER-1985-017, :on 851025 & 26,trips Occurred Due to Two Different Inadvertent Main Steam Line Excess Flow Check Valve Closures.Caused by Rupture Disk Failure in Valve Air Piston Cylinders Due to Lack of Torque + (ML20138P830)
- ML20138P833 + (ML20138P833)
- ML20138P835 + (ML20138P835)
- 05000259/LER-1985-055, :on 851122,during Maint Activities,Spare Sleeve Penetration in Fire Barrier Found Unsealed.Caused by Concealed Location Above Suspended Ceiling.Penetration Sealed + (ML20138P841)
- ML20138P848 + (ML20138P848)
- ML20138P850 + (ML20138P850)
- ML20138P855 + (ML20138P855)
- ML20138P857 + (ML20138P857)
- ML20138P858 + (ML20138P858)
- ML20138P859 + (ML20138P859)
- ML20138P861 + (ML20138P861)
- IR 05000245/1985021 + (ML20138P862)
- ML20138P865 + (ML20138P865)
- ML20138P868 + (ML20138P868)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed + (ML20138P871)
- ML20138P873 + (ML20138P873)
- ML20138P874 + (ML20138P874)
- ML20138P876 + (ML20138P876)
- 05000373/LER-1996-015, :on 961126,declared Diesel Driven Fire Suppression Pumps Inoperable Due to Misinterpretation of Ts. Will Change Frequency for Performing Maint to Correspond W/ TS Frequency + (ML20138P877)
- 05000245/LER-1985-027, :on 851121,loss of Normal Power Occurred While Trip Testing Breakers.Caused When Technician Used Incorrect Tripping Sequence,Causing Main Transformer to Divorce from Grid.Gas Turbine Failed to Respond + (ML20138P878)
- ML20138P882 + (ML20138P882)
- 05000254/LER-1997-002-02, :on 970127,several Isolable Piping Sections Could Experience Stresses Above Update FSAR Allowables Due to post-loss of Coolant Accident Thermal Pressurization. Initial Operability Evaluation Was Completed on 970124 + (ML20138P883)
- ML20138P884 + (ML20138P884)
- ML20138P885 + (ML20138P885)
- 05000298/LER-1985-016, :on 851022,during Tour of Primary Containment, NRC Personnel Noted Mechanical Snubber Restricted by Floor Grating.On 851119,during Insp of Outside Containment,Several Seismic Support Discrepancies Found + (ML20138P886)
- ML20138P887 + (ML20138P887)
- ML20138P889 + (ML20138P889)