Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138H901 + (ML20138H901)
- ML20138H903 + (ML20138H903)
- ML20138H907 + (ML20138H907)
- ML20138H908 + (ML20138H908)
- ML20138H910 + (ML20138H910)
- 05000305/LER-1985-020, :on 851113,failure of Train a Main Feedwater Control Valve Caused lo-lo Water Level in Steam Generator 1A & Reactor Trip.Caused by Two of Four Cap Screws Holding Valve Actuator to Yoke Shearing + (ML20138H911)
- ML20138H914 + (ML20138H914)
- ML20138H920 + (ML20138H920)
- ML20138H921 + (ML20138H921)
- ML20138H922 + (ML20138H922)
- ML20138H926 + (ML20138H926)
- BSEP-97-0176, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-02 & 50-325/97-02.Corrective Actions:Operations Shift Mgt Has Reaffirmed W/Appropriate Operations Personnel Mgt Expectations & Requirements for Continuous Use + (ML20138H927)
- ML20138H930 + (ML20138H930)
- ML20138H931 + (ML20138H931)
- ML20138H934 + (ML20138H934)
- ML20138H937 + (ML20138H937)
- ML20138H938 + (ML20138H938)
- ML20138H941 + (ML20138H941)
- ML20138H942 + (ML20138H942)
- ML20138H944 + (ML20138H944)
- ML20138H945 + (ML20138H945)
- ML20138H946 + (ML20138H946)
- ML20138H947 + (ML20138H947)
- ML20138H948 + (ML20138H948)
- ML20138H949 + (ML20138H949)
- ML20138H950 + (ML20138H950)
- ML20138H954 + (ML20138H954)
- PNO-III-85-092A, on 851023,unit Shut Down Due to High Neutron Flux During Startup.Insp Team Concluded That Reactor Sys Equipment Functioned Acceptably.Electronic Circuit Cards Replaced + (ML20138H956)
- ML20138H957 + (ML20138H957)
- ML20138H960 + (ML20138H960)
- RBG-22713, Unusual Event Rept:On 851126,ECCS Initiation Occurred.Caused by Receipt of Level 2 Signal from Level Instrumentation. Personnel Instructed That All Steps in Sys Test Procedures Must Be Followed + (ML20138H961)
- ML20138H962 + (ML20138H962)
- ML20138H964 + (ML20138H964)
- IR 05000298/1985019 + (ML20138H965)
- ML20138H966 + (ML20138H966)
- ML20138H969 + (ML20138H969)
- ML20138H970 + (ML20138H970)
- ML20138H971 + (ML20138H971)
- ML20138H972 + (ML20138H972)
- ML20138H973 + (ML20138H973)
- ML20138H974 + (ML20138H974)
- ML20138H977 + (ML20138H977)
- ML20138H978 + (ML20138H978)
- ML20138H979 + (ML20138H979)
- ML20138H980 + (ML20138H980)
- NLS8500256, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-19.Corrective Actions:Cns Procedure 3.8, Drawing Control Procedure, Will Be Revised & Implemented to Control Use of safety-related Drawings + (ML20138H982)
- ML20138H983 + (ML20138H983)
- 05000237/LER-1985-041-04, :on 851112,unit Scrammed on Greater than 10% Turbine Stop Valve Closure Trip Signal.Caused by Turbine Trip Resulting from Simulated Reactor Vessel High Water Level.Valve Manifold for ECCS Switch Replaced + (ML20138H985)
- ML20138H986 + (ML20138H986)
- 05000280/LER-1985-021, :on 851114,unexpected Start of Auxiliary Feed Pump 2-FW-P-3A Occurred.Caused by Open Coil in Bfd Relay AFP-2XA.Relay Replaced & Tested Satisfactorily + (ML20138H987)
- ML20138H988 + (ML20138H988)