Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B16434, Retracts Commitment Made to Update & Submit Periodically, Plant Readiness-for-Restart List + (ML20138H859)
- ML20138H860 + (ML20138H860)
- ML20138H861 + (ML20138H861)
- 3F0597-21, TS Change Request 212,Rev 1 Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J, Option B + (ML20138H865)
- ML20138H866 + (ML20138H866)
- ML20138H870 + (ML20138H870)
- ML20138H871 + (ML20138H871)
- ML20138H872 + (ML20138H872)
- AECM-85-0404, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent + (ML20138H873)
- ML20138H876 + (ML20138H876)
- ML20138H878 + (ML20138H878)
- ML20138H879 + (ML20138H879)
- ML20138H881 + (ML20138H881)
- ML20138H883 + (ML20138H883)
- ML20138H885 + (ML20138H885)
- ML20138H886 + (ML20138H886)
- ML20138H890 + (ML20138H890)
- IR 05000336/1995201 + (ML20138H891)
- ML20138H892 + (ML20138H892)
- ML20138H894 + (ML20138H894)
- ML20138H895 + (ML20138H895)
- ML20138H899 + (ML20138H899)
- ML20138H900 + (ML20138H900)
- ML20138H901 + (ML20138H901)
- ML20138H903 + (ML20138H903)
- ML20138H907 + (ML20138H907)
- ML20138H908 + (ML20138H908)
- ML20138H910 + (ML20138H910)
- 05000305/LER-1985-020, :on 851113,failure of Train a Main Feedwater Control Valve Caused lo-lo Water Level in Steam Generator 1A & Reactor Trip.Caused by Two of Four Cap Screws Holding Valve Actuator to Yoke Shearing + (ML20138H911)
- ML20138H914 + (ML20138H914)
- ML20138H920 + (ML20138H920)
- ML20138H921 + (ML20138H921)
- ML20138H922 + (ML20138H922)
- ML20138H926 + (ML20138H926)
- BSEP-97-0176, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-02 & 50-325/97-02.Corrective Actions:Operations Shift Mgt Has Reaffirmed W/Appropriate Operations Personnel Mgt Expectations & Requirements for Continuous Use + (ML20138H927)
- ML20138H930 + (ML20138H930)
- ML20138H931 + (ML20138H931)
- ML20138H934 + (ML20138H934)
- ML20138H937 + (ML20138H937)
- ML20138H938 + (ML20138H938)
- ML20138H941 + (ML20138H941)
- ML20138H942 + (ML20138H942)
- ML20138H944 + (ML20138H944)
- ML20138H945 + (ML20138H945)
- ML20138H946 + (ML20138H946)
- ML20138H947 + (ML20138H947)
- ML20138H948 + (ML20138H948)
- ML20138H949 + (ML20138H949)
- ML20138H950 + (ML20138H950)
- ML20138H954 + (ML20138H954)
- PNO-III-85-092A, on 851023,unit Shut Down Due to High Neutron Flux During Startup.Insp Team Concluded That Reactor Sys Equipment Functioned Acceptably.Electronic Circuit Cards Replaced + (ML20138H956)