Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5354, Informs That Util Is Preparing License Amend Request to Support Second Phase of Power Uprate for Plant.Submittal Will Be Provided by 970815 + (ML20138F829)
- ML20138F831 + (ML20138F831)
- ML20138F832 + (ML20138F832)
- ML20138F835 + (ML20138F835)
- 05000245/LER-1985-025, :on 851110,torus-to-drywell Vacuum Breakers Alarm Microswitches Found Out of Calibr.Caused by Adjustment Screws for Microswitch Actuation Not Having Locknut. Microswitches Calibr + (ML20138F836)
- ML20138F839 + (ML20138F839)
- IR 05000259/1991014 + (ML20138F841)
- ML20138F842 + (ML20138F842)
- ML20138F843 + (ML20138F843)
- 05000282/LER-1997-003-02, :on 970325,discovered That Afp Will Trip on Low SG Pressure During Complete Loss of Feedwater ATWS Event. Operability Evaluation of Plant Was Performed + (ML20138F845)
- 05000369/LER-1985-032-01, :on 851018,QA Surveillance Revealed That Chemical & Vol Control Sys Valves 1NV-223 & 2NV-223 Not Partially Stroked.Caused by Lack of Relevant Procedures. Partial Stroke Requirement Will Be Deleted + (ML20138F846)
- B16203, Informs of Cancellation of Commitment B15485-2 Re Ventilation Sys Design Reviews.Commitment Cancelled in Order to Eliminate Duplication of Commitments + (ML20138F849)
- ML20138F850 + (ML20138F850)
- ML20138F851 + (ML20138F851)
- ML20138F854 + (ML20138F854)
- ML20138F857 + (ML20138F857)
- IR 05000259/1990022 + (ML20138F858)
- ML20138F862 + (ML20138F862)
- ML20138F866 + (ML20138F866)
- ML20138F867 + (ML20138F867)
- ML20138F868 + (ML20138F868)
- B11912, Forwards Results of Acceptance Tests on Seals Installed to Protect Fire Barrier Penetrations in Areas Protected by CO2 Sys to Confirm Penetration Seal Integrity & Design Concentration Achieved & Maintained + (ML20138F869)
- ML20138F873 + (ML20138F873)
- ML20138F875 + (ML20138F875)
- ML20138F879 + (ML20138F879)
- ML20138F880 + (ML20138F880)
- ML20138F884 + (ML20138F884)
- ML20138F886 + (ML20138F886)
- ML20138F889 + (ML20138F889)
- ML20138F892 + (ML20138F892)
- 05000366/LER-1997-005-01, :on 970402,unplanned Automatic Engineered Safety Feature Actuation Occurred Due to Personnel Error. Emergency Bus 2F Was Returned to Svc on 970402 + (ML20138F893)
- ML20138F894 + (ML20138F894)
- ML20138F895 + (ML20138F895)
- ML20138F897 + (ML20138F897)
- IA-96-403, Final Response to FOIA Request for Documents.No Agency Records Located + (ML20138F897)
- ST-HL-AE-1544, Forwards marked-up FSAR Page,Identifying Results of Project Analyses of Probability of Missile Strike on Diesel Generator Exhaust + (ML20138F899)
- ML20138F900 + (ML20138F900)
- ML20138F902 + (ML20138F902)
- TXX-4601, Second Interim Part 21 & Deficiency Rept SDAR-202 Re Adequacey of Restraints Provided for Flux Mapping Sys Under Seismic Loads.Initially Reported on 850918.Evaluation Continuing.Completion Expected by 851127 + (ML20138F903)
- ML20138F904 + (ML20138F904)
- ML20138F905 + (ML20138F905)
- ML20138F906 + (ML20138F906)
- PNO-III-97-010A, on 970221,AIT Dispatched to Zion Station to Review Improper Control Rod Movement Occurred,During Reactor Shutdown.Licensee Also Formed Event Investigation Team Led by J Brons,Comm Ed Vice-President Nuclear Support + (ML20138F907)
- ML20138F912 + (ML20138F912)
- ML20138F913 + (ML20138F913)
- ML20138F914 + (ML20138F914)
- ML20138F915 + (ML20138F915)
- ML20138F918 + (ML20138F918)
- HL-5374, Responds to NRC Re Violations Noted in Insp Rept 50-321/96-15.Corrective Actions:Involved Personnel Were Counseled Re Errors & Procedure Enhanced + (ML20138F921)
- ML20138F923 + (ML20138F923)
- ML20138F924 + (ML20138F924)