Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B132 + (ML20138B132)
- ML20138B134 + (ML20138B134)
- ML20138B135 + (ML20138B135)
- ML20138B137 + (ML20138B137)
- ML20138B139 + (ML20138B139)
- U-602732, Forwards Correction to Attachment 8 to Ltr of Response to NOV Contained in Insp Rept 50-461/96-09 + (ML20138B140)
- NPL-97-0182, Forwards Copy of Annual Monitoring Rept for Pbnp for 960101- 1231 & Vendor Analytical Results for Radiological Environ Monitoring Program (REMP) as Well as Vendor Qa/Qc Results + (ML20138B142)
- ML20138B143 + (ML20138B143)
- ML20138B145 + (ML20138B145)
- ML20138B146 + (ML20138B146)
- ML20138B147 + (ML20138B147)
- ML20138B148 + (ML20138B148)
- ML20138B149 + (ML20138B149)
- ML20138B150 + (ML20138B150)
- ML20138B152 + (ML20138B152)
- ML20138B153 + (ML20138B153)
- ML20138B154 + (ML20138B154)
- ML20138B156 + (ML20138B156)
- W3P85-2696, Submits Proposed Schedule for Meeting Reporting Requirements of 10CFR50.62(c)(1) & (c)(2) Re ATWS Final Rule (Generic Ltr 85-06).Implementation of Rule Requires Installation of Diverse Scram Sys & Turbine Trip Prior to Outage Completion + (ML20138B158)
- ML20138B159 + (ML20138B159)
- 3F1085-04, Responds to 850830 Request for Confirmatory Info Re NUREG-0737,Item II.K.3.30, Small Break LOCA Methods & Use of CRAFT-2 Code.Util Concurs W/B&W Position on NUREG-0565 Concerning Noncondensible Gases + (ML20138B161)
- ML20138B162 + (ML20138B162)
- ML20138B163 + (ML20138B163)
- 05000254/LER-1997-007-03, :on 970331,unit One Emergency DG Inadvertently Started Due to Error by RSO While Operating Control Switch. Nso Removed from All Licensed Duties Until Completion of Remediation Plan + (ML20138B164)
- ML20138B165 + (ML20138B165)
- ML20138B167 + (ML20138B167)
- ML20138B169 + (ML20138B169)
- BECO-85-178, Provides Schedule to Implement Requirements of Final ATWS Rule (10CFR50.62) + (ML20138B170)
- ML20138B171 + (ML20138B171)
- ML20138B172 + (ML20138B172)
- AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 + (ML20138B174)
- ML20138B176 + (ML20138B176)
- U-600355, Confirms That Calculations Using NUREG/CR-2913 for Subcooled Water Jets & Extrapolation of NUREG/CR-2913 Data for Pressures Outside Applicable Range Not Performed. Calculations Will Be Clarified in Future FSAR Amend + (ML20138B177)
- ML20138B178 + (ML20138B178)
- ML20138B180 + (ML20138B180)
- ML20138B182 + (ML20138B182)
- ML20138B183 + (ML20138B183)
- ML20138B185 + (ML20138B185)
- ML20138B186 + (ML20138B186)
- ML20138B187 + (ML20138B187)
- IR 05000293/1986001 + (ML20138B190)
- ML20138B193 + (ML20138B193)
- 05000293/LER-1997-006, :on 970321,inadvertent Group Three Isolation Occurred While Troubleshooting 125 Volt Dc Ground on Battery a as Result of Relay Race When Circuit Breaker D4-8 Was Cycled.Electrical Print Reviewed & Verified + (ML20138B195)
- PY-CEI-NRR-0415, Provides Addl Info & Summarizes Previously Supplied Info Re Limited Application of Silicone Sealants on ESF HVAC Ductwork (Reg Guide 1.52).Justification for Sealant Use & Qualification Program Description Encl + (ML20138B198)
- ML20138B199 + (ML20138B199)
- ML20138B200 + (ML20138B200)
- ST-HL-AE-1372, Forwards Responses to Questions 210.02 Through 210.07,per 850806 Request for Addl Info.Info Concerns Piping,Supports & Valves in Cooling Loops of Spent Fuel Pool Cooling & safety-related Instrument tubing.Marked-up FSAR Pages Encl + (ML20138B201)
- ML20138B203 + (ML20138B203)
- ML20138B204 + (ML20138B204)
- ML20138B205 + (ML20138B205)
- 05000369/LER-1997-001-03, :on 970318,failure to Comply W/Ts 3.6.3 Requirements Following Valve 1CF-26AB Inoperability Was Identified,Due to Misinterpretation of Reference Documents. Application of TS to Valve Was Clarified + (ML20138B207)