Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Z686 + (ML20137Z686)
- ML20137Z688 + (ML20137Z688)
- ML20137Z689 + (ML20137Z689)
- IR 05000454/1986008 + (ML20137Z690)
- ML20137Z692 + (ML20137Z692)
- ML20137Z693 + (ML20137Z693)
- 05000250/LER-1985-025, :on 850827 & 30,during App R Safe Shutdown Review,Addl Circuits That May Require Protection,Rerouting or Circuit Mods Identified.Caused by Addl NRC Guidance.Fire Watch Expanded + (ML20137Z694)
- ML20137Z695 + (ML20137Z695)
- ML20137Z697 + (ML20137Z697)
- ML20137Z698 + (ML20137Z698)
- PNO-IV-85-061, on 851206,scheduled Maint Outage Will Begin. Replacement of Expansion Joint in Feedwater Heater & Repair of Main Generator Cooling Sys Hydrogen Leak Will Be Completed.Restart Scheduled for 851211 + (ML20137Z700)
- ML20137Z701 + (ML20137Z701)
- ML20137Z702 + (ML20137Z702)
- ML20137Z704 + (ML20137Z704)
- ST-HL-AE-1369, Clarifies That Stainless Steel Piping Will Be Used for ECCS Piping in Contact W/Borated Piping.Carbon Steel Piping May Be Used for Portions of ECCS Containing Nonborated Piping + (ML20137Z706)
- ML20137Z707 + (ML20137Z707)
- ML20137Z710 + (ML20137Z710)
- ML20137Z711 + (ML20137Z711)
- ML20137Z712 + (ML20137Z712)
- ML20137Z713 + (ML20137Z713)
- ML20137Z714 + (ML20137Z714)
- ML20137Z716 + (ML20137Z716)
- ML20137Z717 + (ML20137Z717)
- ML20137Z718 + (ML20137Z718)
- ML20137Z719 + (ML20137Z719)
- ML20137Z723 + (ML20137Z723)
- ML20137Z724 + (ML20137Z724)
- ML20137Z726 + (ML20137Z726)
- 05000029/LER-1983-013, :on 830413,due to Shifts in App G Curve, Determined That Events as Postulated in Original Design Basis Could Potentially Exceed Pressure Restrictions of Revised Curve.Caused by Personnel Error + (ML20137Z727)
- ML20137Z728 + (ML20137Z728)
- ML20137Z729 + (ML20137Z729)
- PNO-I-85-092, on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990 + (ML20137Z731)
- ML20137Z733 + (ML20137Z733)
- ML20137Z734 + (ML20137Z734)
- ML20137Z736 + (ML20137Z736)
- 05000416/LER-1985-042, :on 851102 & 23,ESF Bus Trips Occurred.Caused by Incorrect Wiring Configuration.Configurations Corrected + (ML20137Z737)
- ML20137Z739 + (ML20137Z739)
- ML20137Z740 + (ML20137Z740)
- ML20137Z745 + (ML20137Z745)
- ML20137Z746 + (ML20137Z746)
- 1CAN088507, Responds to NRC 850805 Request for Voluntary Participation in Efforts Re Generic Issue 77 Concerning Flooding of Safety Equipment Compartments by Backflow Through Floor Drains. Request Declined Due to Demands on Engineering Resources + (ML20137Z747)
- ML20137Z749 + (ML20137Z749)
- ML20137Z750 + (ML20137Z750)
- IR 05000445/1984040 + (ML20137Z751)
- ML20137Z753 + (ML20137Z753)
- ML20137Z754 + (ML20137Z754)
- ML20137Z755 + (ML20137Z755)
- ML20137Z757 + (ML20137Z757)
- ML20137Z758 + (ML20137Z758)
- ML20137Z759 + (ML20137Z759)
- ML20137Z760 + (ML20137Z760)