Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11627, Submits Plans to Prevent Recurrence of 850715 Plant Trip Caused by Improper Installation of Design Change Associated W/Pressurizer Spray Valves,Per Commitment at 850718 Meeting. Planned Corrective Actions Listed + (ML20137E724)
- ML20137E727 + (ML20137E727)
- IR 05000354/1985062 + (ML20137E728)
- ML20137E731 + (ML20137E731)
- IR 05000461/1985035 + (ML20137E733)
- ML20137E737 + (ML20137E737)
- B11658, Forwards Addl Six Requests for Deviations from BTP CMEB9.5-1 Re Fire Pumps,Barriers & Detection,Floor Drains,Control Room & Control Room Complex,Supplementing 850724 Request for Deviations + (ML20137E742)
- ML20137E744 + (ML20137E744)
- ML20137E745 + (ML20137E745)
- ML20137E746 + (ML20137E746)
- ML20137E748 + (ML20137E748)
- B11636, Clarifies Status of Encl Proposed Tech Spec Changes,Per 850709 Response to Generic Ltr 83-43 Re Reporting Requirements of 10CFR50.72 & 73.Submittal Supersedes May 1983 Proposed Tech Spec Section 6.9 Changes + (ML20137E749)
- ML20137E751 + (ML20137E751)
- ML20137E753 + (ML20137E753)
- ML20137E754 + (ML20137E754)
- NG-97-0514, Documents Plant FSAR Improvement Initiatives Re NRC Enforcement Policy rev,NUREG-1600,dtd 961018 + (ML20137E755)
- ML20137E756 + (ML20137E756)
- ML20137E758 + (ML20137E758)
- 05000482/LER-1985-053, :on 850717,during Surveillance Test Procedure, Control Room Ventilation Isolation Signal Initiated.Caused by Faulty Bypass Switch.Equipment Returned to Normal & Switch Replaced + (ML20137E763)
- ML20137E765 + (ML20137E765)
- ST-HL-AE-5613, Requests That Listed Changes Be Made for Tranmittals Related to South Texas Project,Units 1 & 2 + (ML20137E769)
- ML20137E772 + (ML20137E772)
- ML20137E776 + (ML20137E776)
- ML20137E777 + (ML20137E777)
- ML20137E778 + (ML20137E778)
- ML20137E782 + (ML20137E782)
- ML20137E783 + (ML20137E783)
- ML20137E785 + (ML20137E785)
- ST-HL-AE-5612, Submits Rept of Nuclear Insurance Protection,Per 10CFR50.54(w)(2) + (ML20137E786)
- DCL-85-270, Forwards Rev 2 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) + (ML20137E790)
- IR 05000382/1985001 + (ML20137E792)
- ML20137E793 + (ML20137E793)
- ST-HL-AE-5611, Notifies That Senior Reactor Operator Je Grant Will No Longer Serve in Position Requiring License + (ML20137E796)
- ML20137E797 + (ML20137E797)
- B11629, Advises That Util Unable to Meet Jul 1985 Schedule for Submittal of Amend to License DPR-61 Re post-accident Sampling Sys Containment Isolation Valves.Amend Request Will Be Submitted During Third Quarter 1985 + (ML20137E800)
- ML20137E802 + (ML20137E802)
- 05000316/LER-1985-033-01, :on 851023,lower Containment Airborne Monitor high-range Noble Gas Channel Gave Spurious High Alarm Signal Resulting in ESF Actuation Signal.Caused by Software Errors. Errors Being Evaluated by Mfg + (ML20137E803)
- ML20137E804 + (ML20137E804)
- ML20137E807 + (ML20137E807)
- ML20137E809 + (ML20137E809)
- ML20137E810 + (ML20137E810)
- ML20137E814 + (ML20137E814)
- ML20137E815 + (ML20137E815)
- ML20137E818 + (ML20137E818)
- ML20137E820 + (ML20137E820)
- ML20137E821 + (ML20137E821)
- ML20137E828 + (ML20137E828)
- ML20137E829 + (ML20137E829)
- ML20137E833 + (ML20137E833)
- ML20137E839 + (ML20137E839)
- ML20137E844 + (ML20137E844)