Forwards SALP Rept 50-483/85-01 for Dec 1983 - May 1985,for Util Review Prior to 850828 Meeting.Area of Plant Operations Will Need Continued Attention Due to High Number of Plant Trips.Written Comments Requested within 30 Days
ML20137E802
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/21/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20137E809 List:
References
NUDOCS 8508260078
Download: ML20137E802 (2)


See also: IR 05000483/1985001

Text

.

Dm8

I'

.-

AUG 2i 985

Docket No. 50-483

Union Electric Company

ATTN:

Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of August 28, 1985,

is the SALP 5 Board Report for the Callaway Nuclear Plant covering the period.

December 1, 1983 through May 31, 1985. This period encompassed the completion

of major construction. activities at the site, the preoperational and startup

testing phases, and finally the commencement of full power operations.

Overall performance of the Callaway Nuclear Plant was judged to be acceptable.

We are pleased to note that you achieved the highest performance rating

(Category 1) in five out of the fourteen areas rated. Your performance trend

in all of the areas rated remained the same or improved. No area rated showed

a declining trend and no area received a rating lower than Category 2.

Mutual

cooperation and support between the corporate and plant site offices is

evident, and your management has demonstrated an active involvement in assuring

a quality operation of the facility.

Performance in the areas of Fire Protection, Initial Fuel Loading, Electrical

Power Supply and Distribution, Startup Testing, and Licensing Activities was

rated as Category 1.

In some cases, this was a repeat rating from the previous

appraisal period.

Despite some initial problems in your Preoperational Testing

phase, you learned from those problems and were able to complete the Startup

Testing program in an exceptional manner. The area of Plant Operations was

marred due to the high number of plant trips, and this area will need your

continued attention. Your operator licensing efforts resulted in an initial

examination pass rate that was significantly higher than the national average.

The training department is to be commended for their efforts.

While you will have sufficient opportunity to present your comments at the

meeting on August 28, we also solicit written comments within 30 days after

the meeting to enable us to thoroughly evaluate your comments and provide you

with our conclusions relative to them.

8508260078 850821

gDR

ADOCK 05000483

PDR

fl

m40

.'

,'

Union Electric Company

2

AUG 21 USS

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC's Public Document Room.

No reply to this letter is required at this time; however, should you have any

questions concerning the SALP Report, we would be pleased to discuss them with

you.

Sincerely,

" Original Signed by A. B. Davis" for

James G. Keppler

Regional Administrator

Enclosure: SALP 5 Board Report

No. 50-483/85001

cc w/ enclosure:

W. H. Weber, Manager, Nuclear

Construction

S. E. Miltenberger, Plant Manager

R. L. Powers, Assistant Manager

Quality Assurance

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

'

-

N. J. Palladino, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

T. Alexion, NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaison Officer, State of

Missouri

INPO

RIII

RIII

RI

RII

RIII

'"Jff

(

Y

.A

I

"

P

cf{ibinz

J'

S

,, "

I

(Chrissoimos

Pa

ell /

D is

08/21/85p.)4(\\

th

NI

i