Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135H596 + (ML20135H596)
- ML20135H597 + (ML20135H597)
- 05000341/LER-1985-052, :on 850818,Div II Reactor Bldg Pressure High/ Low Plan Received.Caused by Reactor Bldg Supply Airflow Being Too High.Airflow Reduced & Div II of Standby Gas Treatment Initiated to Restore Pressure + (ML20135H607)
- ML20135H633 + (ML20135H633)
- U-600257, Forwards Rev 5 to Qualification & Training Plan,In Response to WR Butler .Rev Withheld (Ref 10CFR73.21) + (ML20135H659)
- ML20135H667 + (ML20135H667)
- ML20135H668 + (ML20135H668)
- ML20135H671 + (ML20135H671)
- ML20135H672 + (ML20135H672)
- ML20135H673 + (ML20135H673)
- ML20135H676 + (ML20135H676)
- ML20135H677 + (ML20135H677)
- ML20135H678 + (ML20135H678)
- ML20135H679 + (ML20135H679)
- ML20135H680 + (ML20135H680)
- TXX-4370, Suppls 840907 Response to Violations Noted in Insp Rept 50-445/84-08.Corrective Actions:Reinsp of Baseplate Shims & Bolt Tightening Committed to in Completed.Answers to Questions Raised in NRC Encl + (ML20135H681)
- ML20135H682 + (ML20135H682)
- ML20135H683 + (ML20135H683)
- ML20135H684 + (ML20135H684)
- ML20135H685 + (ML20135H685)
- IR 05000727/2008001 + (ML20135H686)
- ML20135H687 + (ML20135H687)
- ML20135H688 + (ML20135H688)
- IR 05000445/1984045 + (ML20135H691)
- IR 05000334/1985018 + (ML20135H692)
- ML20135H693 + (ML20135H693)
- ML20135H694 + (ML20135H694)
- ML20135H695 + (ML20135H695)
- ML20135H696 + (ML20135H696)
- PNO-III-85-082, on 850917,bomb Threat Received.No Suspects Found.Threat Considered Hoax & No Plant Search Taken + (ML20135H698)
- ML20135H699 + (ML20135H699)
- ML20135H700 + (ML20135H700)
- ML20135H702 + (ML20135H702)
- PLA-2537, Forwards Plan & Schedule for Security tie-in of Fifth Diesel Generator Under Const.Plan & Schedule Withheld (Ref 10CFR2.790) + (ML20135H704)
- IR 05000341/1985034 + (ML20135H705)
- ML20135H706 + (ML20135H706)
- ML20135H708 + (ML20135H708)
- ML20135H709 + (ML20135H709)
- U-600261, Forwards Dcrdr Summary Rept. Major Tasks Included in Dcrdr Enumerated.Human Engineering Design Discrepancies Identified by Dcrdr Categorized + (ML20135H712)
- ML20135H713 + (ML20135H713)
- IR 05000261/1985027 + (ML20135H715)
- ML20135H716 + (ML20135H716)
- U-600243, Forwards Revs 6 & 3 to Physical Security & Safeguards Contingency Plans,Respectively,Updating & Clarifying Info Re Detailed Security Measures for Physical Protection of Nuclear Power Station.Revs Withheld (Ref 10CFR73.21) + (ML20135H718)
- ML20135H719 + (ML20135H719)
- IR 05000401/2007009 + (ML20135H721)
- ML20135H722 + (ML20135H722)
- PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation + (ML20135H725)
- ML20135H726 + (ML20135H726)
- IR 05000401/2008009 + (ML20135H727)
- ML20135H731 + (ML20135H731)
- U-600259, Part 21 & Interim Potentially Reportable Deficiency Rept 55-85-07 Re Seismic Design & Const of Automatic Sprinkler Corp of America,Inc Fire Protection Sys.Initially Reported on 850813.Investigation Continuing + (ML20135H732)