Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B756 + (ML20135B756)
- B11662, Forwards Summaries of Public Safety risk-oriented Analyses of Projects Evaluated in Integrated Safety Assessment Program,Per NRC 850731 Request.Projects Include Reactor Water Cleanup Sys Pressure Interlock,Crdr & ATWS + (ML20135B757)
- ML20135B758 + (ML20135B758)
- ML20135B759 + (ML20135B759)
- ML20135B760 + (ML20135B760)
- ML20135B761 + (ML20135B761)
- ML20135B763 + (ML20135B763)
- TXX-4543, Interim Const Deficiency Rept SDAR-136 Re Temp Envelope Requirements on Environ Qualification of Equipment Outside Containment for High Energy Line Breaks.Completion of Calculations for Final Analysis Anticipated by 851014 + (ML20135B764)
- ML20135B765 + (ML20135B765)
- ML20135B766 + (ML20135B766)
- ML20135B770 + (ML20135B770)
- ML20135B771 + (ML20135B771)
- ML20135B772 + (ML20135B772)
- IR 05000254/1996012 + (ML20135B773)
- ML20135B775 + (ML20135B775)
- ML20135B778 + (ML20135B778)
- IR 05000416/1996018 + (ML20135B779)
- ML20135B781 + (ML20135B781)
- ML20135B783 + (ML20135B783)
- ML20135B784 + (ML20135B784)
- ML20135B787 + (ML20135B787)
- ML20135B788 + (ML20135B788)
- ML20135B791 + (ML20135B791)
- ML20135B792 + (ML20135B792)
- IR 05000344/1997001 + (ML20135B794)
- ML20135B795 + (ML20135B795)
- ML20135B797 + (ML20135B797)
- ML20135B798 + (ML20135B798)
- ML20135B799 + (ML20135B799)
- ML20135B800 + (ML20135B800)
- ML20135B801 + (ML20135B801)
- ML20135B802 + (ML20135B802)
- ML20135B803 + (ML20135B803)
- ML20135B804 + (ML20135B804)
- 3F1196-26, Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap) + (ML20135B805)
- ML20135B807 + (ML20135B807)
- ML20135B808 + (ML20135B808)
- ML20135B810 + (ML20135B810)
- ML20135B813 + (ML20135B813)
- ML20135B814 + (ML20135B814)
- ML20135B815 + (ML20135B815)
- ML20135B817 + (ML20135B817)
- 05000285/LER-1996-011, :on 961030,containment Closure Breached While Moving Fuel.Caused by Failure to Maintain Valves & Follow & Enforce SO-G-20A Requirements.Rev of Policies & Procedures Re Control & Maint of Containment Closure + (ML20135B821)
- ML20135B822 + (ML20135B822)
- ML20135B824 + (ML20135B824)
- ML20135B825 + (ML20135B825)
- ML20135B826 + (ML20135B826)
- ML20135B831 + (ML20135B831)
- 05000414/LER-1996-006-02, :on 961101,TS Surveillance for AC Offsite Power Sources Was Missed.Caused by Insufficient Detail in Test Procedure.Quality Improvement Team Has Been Created to Track Short Duration Inoperabilities + (ML20135B832)
- B16302, Informs That Senior Operator License SOP-11265 Is No Longer Needed for Ps Fitzgerald,Per 10CFR50.74(a) + (ML20135B833)
- ML20135B835 + (ML20135B835)