Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134A181 + (ML20134A181)
- ML20134A182 + (ML20134A182)
- ML20134A183 + (ML20134A183)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup + (ML20134A184)
- IR 05000302/1985040 + (ML20134A185)
- ML20134A186 + (ML20134A186)
- 05000254/LER-1996-025-01, :on 961220,discovered Original Value for Strainers Head Loss Incorrect.Cause Could Not Be Determined. Training Provided for Operators to Recognize Pump Cavitation During Design Basis Accidents + (ML20134A188)
- ML20134A189 + (ML20134A189)
- ST-HL-AE-1494, Forwards Response to Draft SER & FSAR Open/Confirmatory Items,Including Item Q430.118N Re ESF Load Sequencer Reliability Analysis.Info Will Be Included in Future FSAR Amend + (ML20134A190)
- ML20134A193 + (ML20134A193)
- ML20134A195 + (ML20134A195)
- ML20134A196 + (ML20134A196)
- ML20134A197 + (ML20134A197)
- ML20134A198 + (ML20134A198)
- ML20134A199 + (ML20134A199)
- ML20134A200 + (ML20134A200)
- ML20134A202 + (ML20134A202)
- ML20134A203 + (ML20134A203)
- ML20134A204 + (ML20134A204)
- ML20134A205 + (ML20134A205)
- ML20134A208 + (ML20134A208)
- B11815, Forwards Response to NRC Request for Addl Info on SER Confirmatory Item 58 Re Emergency Diesel Generator Fuel Oil Storage & Transfer Sys + (ML20134A210)
- B11814, Forwards Revised Deviation Request from Branch Technical Position Cmeb 9.5-1 Re Auxiliary Bldg - Separation Criteria, Per SER Open Item 14.3 on Safe Shutdown Capability + (ML20134A211)
- ML20134A212 + (ML20134A212)
- ML20134A215 + (ML20134A215)
- ML20134A216 + (ML20134A216)
- ML20134A217 + (ML20134A217)
- ML20134A219 + (ML20134A219)
- ST-HL-AE-1487, Responds to Draft SER or FSAR Item Re Question 430.16N Concerning Breaker Coordination Drawings.Drawings Will Not Be Incorporated in FSAR + (ML20134A221)
- ML20134A222 + (ML20134A222)
- ST-HL-AE-1422, Forwards Response to Draft Ser/Fsar Items Re Section 3.11 Concerning Environ Design of Mechanical & Electrical Equipment.Encl marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (ML20134A224)
- BSEP-85-1869, Suppls Response to Violations Noted in Insp Repts 50-324/85-19,50-325/85-19,50-324/85-22 & 50-325/85-22. Corrective Actions:Loose/Missing Bolts Investigated & Trouble Tickets Written + (ML20134A225)
- TXX-4527, Submits Results of Study to Verify Proper Coordination & Selective Tripping of Breakers & Fuses Required for Safe Shutdown Circuits & Power Supplies in Response to NRC Question 010.33.Summary of Findings Provided + (ML20134A226)
- ML20134A228 + (ML20134A228)
- ML20134A229 + (ML20134A229)
- ML20134A232 + (ML20134A232)
- ML20134A233 + (ML20134A233)
- ML20134A234 + (ML20134A234)
- ML20134A235 + (ML20134A235)
- ML20134A237 + (ML20134A237)
- U-600206, Forwards Results of Analysis of Unresolved Item 85016-07 Re Central File Storage Facility Developed During 850726 Exit Meeting.Detailed Schedule for Completion of Corrective Actions Will Be Forwarded by 850815 + (ML20134A238)
- ML20134A239 + (ML20134A239)
- IR 05000321/1985027 + (ML20134A240)
- ML20134A241 + (ML20134A241)
- ML20134A244 + (ML20134A244)
- ML20134A247 + (ML20134A247)
- ML20134A252 + (ML20134A252)
- ML20134A254 + (ML20134A254)
- ML20134A256 + (ML20134A256)
- ML20134A259 + (ML20134A259)
- ML20134A261 + (ML20134A261)