Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133G478 + (ML20133G478)
- ML20133G479 + (ML20133G479)
- ML20133G480 + (ML20133G480)
- PNO-IV-97-005, on 970111,Troxler Moisture/Density Gauge Was Stolen from Bed of licensee-owned Truck While Truck Was Parked in Lot.Region IV Has Notified NRC Operations Ctr,Nmss OCA & OSP + (ML20133G481)
- ML20133G483 + (ML20133G483)
- ML20133G484 + (ML20133G484)
- ML20133G485 + (ML20133G485)
- ML20133G486 + (ML20133G486)
- ML20133G487 + (ML20133G487)
- ML20133G488 + (ML20133G488)
- 05000352/LER-1985-062, :on 850428,fire Watch Patrol of Svc Water Pipe Tunnel Exceeded 1 H Limit.Cause of Event Unknown Due to Long Time Span Between Occurrence & Discovery.Fire Watch Personnel Counseled + (ML20133G489)
- ML20133G491 + (ML20133G491)
- 05000295/LER-1985-032-04, :on 850909,while Performing Periodic Test PT-10, Safeguards Actuation Unit 1, Six Containment Isolation Phase a Valves Inadvertently Stroked Closed.Caused by Improper Test Component Reset + (ML20133G493)
- 05000482/LER-1985-042, :on 850705 & 11,ESF Actuation Occurred Resulting in Feedwater Isolation,Main Turbine Trip & Main Feedwater Pump Trips.Caused by High Water Levels in Steam Generator & Overlap Between Setpoints + (ML20133G494)
- ML20133G495 + (ML20133G495)
- ML20133G496 + (ML20133G496)
- ML20133G498 + (ML20133G498)
- ML20133G500 + (ML20133G500)
- ML20133G503 + (ML20133G503)
- ML20133G504 + (ML20133G504)
- ML20133G505 + (ML20133G505)
- ML20133G506 + (ML20133G506)
- ML20133G507 + (ML20133G507)
- ML20133G508 + (ML20133G508)
- ML20133G509 + (ML20133G509)
- ML20133G511 + (ML20133G511)
- ML20133G515 + (ML20133G515)
- ML20133G516 + (ML20133G516)
- ML20133G517 + (ML20133G517)
- ML20133G518 + (ML20133G518)
- ML20133G519 + (ML20133G519)
- ML20133G521 + (ML20133G521)
- ML20133G522 + (ML20133G522)
- ML20133G523 + (ML20133G523)
- ML20133G524 + (ML20133G524)
- ML20133G525 + (ML20133G525)
- ML20133G527 + (ML20133G527)
- ML20133G528 + (ML20133G528)
- ML20133G529 + (ML20133G529)
- ML20133G530 + (ML20133G530)
- IR 05000333/1985023 + (ML20133G531)
- ML20133G532 + (ML20133G532)
- ML20133G533 + (ML20133G533)
- ML20133G534 + (ML20133G534)
- ML20133G535 + (ML20133G535)
- ML20133G536 + (ML20133G536)
- ML20133G537 + (ML20133G537)
- ML20133G539 + (ML20133G539)
- B11772, Discusses Schedule for Compliance W/Requirements of 10CFR50.62 Re Atws.Compliance Can Be Achieved by End of First Refueling Outage,Assuming Staff Concurrence W/Westinghouse Owners Group Generic Design by Early 1986 + (ML20133G540)
- ML20133G541 + (ML20133G541)
- ML20133G543 + (ML20133G543)