Text
7 _ .
_ _ - . -
. _ _ -
__.
.
. _ .
. _ _ _ _
.
i
_m
..
OCT 11 1985
i
i
!
Docket No. 50-245
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
,
P.O. Box 270
Hartford, Connecticut 06141-0?70
Gentlemen:
l
Subject:
Inspection Report 50-245/85-15
This refers to the special safety inspection conducted by Dr. Jin W. Chung of
,
this office on June 17-28, 1985, at Millstone Nuclear Power Plant, Unit 1,
Waterford, Connecticut of activities authorized by NRC License No. DPR-21 and
to the discussions of our findings held by Dr. Jin W. Chung with Mr. W. D.
Romberg, of your staff, at the conclusion of the inspection.
1
Areas examined during this inspection included systems selected from one acci-
I
dent sequence documented in the Millstone Unit 1 probabilistic risk assessment
1
(NUREG/CR-3085). The equipment inspection focused on the availability of
critical components as evidenced by plant conditions and implementation of
programs to assure operability.
In addition, this inspection examined the
l
ability of the Millstone staff to utilize procedures and equipment to recover
l
from accident sequences. These areas are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observa-
tion of equipment and simulated activities by the inspectors.
Based on the results of this inspection, it appears that several activities
were not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
These violations
have been categorized by severity level in accordance with the revised NRC
Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register
Notice (49 FR 8583) dated March 8,1984. You are required to respond to this
letter and in preparing your response, you should follow the instructions in
Appendix A.
The responses directed by this letter and the accompanying Notice are not
i
subject to the clearance procedures of the Office of Management and Budget
'
as required by the Paperwork Reduction Act of 1980, PL 96-511.
1
~
v
i
8510160014 851011
ADOCK 05000245 ~
G
l
l
OFFICIAL RECORD COPY
CAT MILLI 85-15 - 0001.0.0
j_
10/10/85
l
I
[E-O I
t
.
-
,
..
..
,
Northeast Nuclear Energy Company
2
Your cooperation with us in this matter is appreciated.
.
Sincerely,
prisin51 signed BYI
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosures:
1.
NRC Region I Inspection Report 50-245/85-15
2.
Appendix A, Notice of Violation
cc w/encls:
E. J. Mroczka, Vice President, Nuclear Operations
l
W. D. Romberg, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
l
R. T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
E. McCabe, Chief, Section 3B, ORP
!
0
l
RI:DRS
RI:DRS
RI:DRS
RI:DRS
!
hung /c 1
Anders n
Du r
Ebn te
Q
[
- lA 4 W
-
f
- >
/* "
0FFICIAL RECORD COPY
CAT MILL 1 85-15 - 0001.0.1
08/22/85
/
.
.
- .-
-
..
-
.
.
.-
.
.
.
.