ML20133G484
| ML20133G484 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 07/30/1985 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Farrar D COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20133G485 | List: |
| References | |
| NUDOCS 8508080701 | |
| Download: ML20133G484 (3) | |
Text
r-July 30, 1985 Docket Nos. 50-295 IISTRBRT4 and 50-304 Gocket M ie NRC PDR L PUR ORB #1 Rdg HThompson ORAB Mr. D. L. Farrar JNorris CParrish Director of Nuclear Licensing OELD EJordan Connonwealth Edison Company BGrimes JPartlow Post Office Box 767 TBarnhart 8 ACRS 10 Chicago, Illinois 60690 CMiles SECY RDiggs Gray File
Dear Mr. Farrar:
WGuldemond, Reg.III
SUBJECT:
ZION NUCLEAR POWER STATION UNITS 1 AND 2 - RELIEF FROM FIRST TEN-YEAR INSERVICE INSPECTION AND TESTING REQUIREMENTS By letter dated May 13, 1985, the Comonwealth Edison Company (CECO) submitted Revision 4 to the Inservice Inspection Program for Zion Units 1 and 2 for the first ten-year interval. The revision included requests for relief from certain hydrostatic testing requirements of Subsection IWA-5244(a) of the ASME Boiler and Pressure Yessel Code 1980 Edition through 1981 Winter Addenda.
We have reviewed this submittal and our review has determined that the code requirements for the specified systems are impractical and the granting of the relief is authorized by law and will not endanger life or property or the comon defense and security and is otherwise in the public interest, giving due consideration to the burden upon the license that could result if the requirements were imposed on the facility. Detailed technical assessment is contained in the enclosed Safety Evaluation. Based on our conclusion, pursuant to 10 CFR 50.55a(g)(6)(1), we grant the relief.
Sincerely,
/s/SVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page
- SEE PREVIOUS WHITE FOR CONCURRENCE j
W ORB #1:D R0 $#1 h)L
- 1:DL* %OEL g7
,is u,,
s Sva 7Q/f5 7/t485 85
/85 9500000701 850730 PDR ADOCK 05000295 G
Docket Nos. 50-295 DISTRIBUTION and 50-304 Docket File NRC PDR L PDR ORB #1 Rdg HThompson ORAB Mr. D. L. Farrar JNorris CParrish
/
Director of Nuclear Licensing OELD EJordan
/
Conunonwealth Edison Company BGrimes JPartlow Post Office Box 767 TBarnhart 8 ACRS 10
/
Chicago, Illinois 60690 CMiles SECY Gray File /
RDiggs
Dear Mr. Farrar:
WGuldemand, Reg.III
SUBJECT:
ZION NUCLEAR POWER STATION UNITS 1 AND 2 - AELIEF FROM FIRST TEN-YEAR INSERVICE INSPECTION AND TESTING REQUIREMENTS By letter dated May 13, 1985, the Commonwealth Edison Company (CECO) submitted Revision 4 to the Inservice Inspectiori Program for Zion Units 1 and 2 for the first ten-year interval. The re41sion included requests for relief from certain hydrostatic testing requf'rements.
We have reviewed this submittal and concipded that Revision 4 will not adversely impact the safety of Zion Unitt 1 and 2 and that the proposed alternate testing is acceptable.
Detajiedtechnicalassessmentis contained in the enclosed Safety Evalu'ation.
Based on our conclusion, we hereby grant the relief.
Sincerely, Steven A. Varga, Chief-Operating Reactors Branch #1 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page
)
f, J
lj&
/
A ORB #1:DLp 0 B#.0L B#1:DL OELD p CPa rish J gr kps a
A-6/p85 6/
5 5
7,F//8
\\
Ng Mr. D. L. Farrar Comonwealth Edison Company Zion Station cc:
Robert J. Vollen Esquire The Honorable John E. Grotberg 109 North Dearborn Street United States House of Chicago, Illinois 60602 Representatives Washington, D.C. 20515 Dr. Cecil Lue-Hing Director of Research and Development Mr. Michael C. Parker, Chief Metropolitan Sanitary District Division of Engineering of Greater Chicago Illinois Department of Nuclear 100 East Erie Street Safety Chicago, Illinois 60611 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza Sist Floor Chicago, Illinois 60602
~
Susan N. Sekuler, Esquire Assistant Attorney General Environmental Cohtrol Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Payor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Panager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Comission Resident Inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137