Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133D185 + (ML20133D185)
- ML20133D186 + (ML20133D186)
- L-96-029, Forwards non-proprietary & Proprietary Versions of Revised EPIPs Including Rev 38 to Index,EPIP-6.6c, Assembly Area Designations, Rev 22 to EPIP-22, Plant Personnel Emergency Call List & Rev 21 to EPIP-23.Proprietary Portion Withheld + (ML20133D187)
- PNO-V-85-061, on 850919,teletherapy Source Failed to Retract After Completion of Teletherapy Treatment on Patient.Caused by Contact Strips Which Activate Field Light Curling Up & Preventing Source from Returning to Fully Shielded Position + (ML20133D189)
- ML20133D190 + (ML20133D190)
- ML20133D191 + (ML20133D191)
- ML20133D192 + (ML20133D192)
- 05000409/LER-1985-013, :on 850701,09,10 & 12,high Pressure Svc Water diesel-driven Pump 1A Malfunctioned.Caused by Air in Fuel Line.Priming Tank Refilled & Diesel Fuel Filters Vented + (ML20133D193)
- ML20133D195 + (ML20133D195)
- ML20133D196 + (ML20133D196)
- ML20133D197 + (ML20133D197)
- ML20133D198 + (ML20133D198)
- ML20133D202 + (ML20133D202)
- ML20133D203 + (ML20133D203)
- ML20133D205 + (ML20133D205)
- PNO-IV-85-053, on 850928,reactor Shut Down in Preparation for Planned Refueling Outage.Outage Expected to Last 3 Months. State of Ne Informed.No Press Release Planned + (ML20133D206)
- ML20133D207 + (ML20133D207)
- ML20133D208 + (ML20133D208)
- ML20133D209 + (ML20133D209)
- ML20133D210 + (ML20133D210)
- IR 05000219/1985024 + (ML20133D211)
- NSD-NRC-97-4929, Requests Responses to NRC Request for Addl Info on AP600 Probabilistic Risk Assessment Rept + (ML20133D213)
- ML20133D214 + (ML20133D214)
- ML20133D216 + (ML20133D216)
- ML20133D219 + (ML20133D219)
- ML20133D220 + (ML20133D220)
- 05000325/LER-1985-020, :on 850503 & 0620,problems Identified W/Logic Response Time Testing of Isolation Logic of Main Steam Line Drain Primary Containment Isolation Valves BF21-F016 & F019. Caused by Procedural Overlap + (ML20133D221)
- ML20133D223 + (ML20133D223)
- ML20133D225 + (ML20133D225)
- ML20133D226 + (ML20133D226)
- ML20133D227 + (ML20133D227)
- IR 05000155/1985010 + (ML20133D228)
- ML20133D230 + (ML20133D230)
- ML20133D234 + (ML20133D234)
- ML20133D236 + (ML20133D236)
- ML20133D237 + (ML20133D237)
- IR 05000324/1984039 + (ML20133D238)
- ML20133D239 + (ML20133D239)
- ML20133D241 + (ML20133D241)
- ML20133D242 + (ML20133D242)
- ML20133D243 + (ML20133D243)
- ML20133D244 + (ML20133D244)
- ML20133D245 + (ML20133D245)
- ML20133D246 + (ML20133D246)
- ML20133D247 + (ML20133D247)
- ML20133D248 + (ML20133D248)
- ML20133D249 + (ML20133D249)
- ML20133D250 + (ML20133D250)
- ML20133D251 + (ML20133D251)
- ML20133D253 + (ML20133D253)
- ML20133D254 + (ML20133D254)