ML20133D243
| ML20133D243 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/16/1985 |
| From: | Bailey J GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20133D246 | List: |
| References | |
| TASK-2.D.1, TASK-TM 0053V, 53V, GN-706, NUDOCS 8510090003 | |
| Download: ML20133D243 (1) | |
Text
. - _ - _ _ _ _ _ _ _ _ _ _ _
George Power Company Routa 2, Box 299A W1ynisboro. Georgia 30830 Telephone 404 554-9SS1 404 724-8114 Southern Company Services. Inc.
Post Ottece Box 2625 Bamingham. Alabama 35202 Telephone 205 8704011 Vogtle Proj.ect September 16, 1985 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Ms. Elinor G. Adensam. Chief Log:
GN-706 Licensing Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 12: ITEM II.D.1-RELIEF AND SAFETY VALVE TESTS
Dear Mr. Denton:
Attached for your staff's review are reports that document analyses to support closing the subject confirmatory item. Attachment 1 is the Georgia Power Safety and Relief Valve Adequacy Report and the Block Valve Adequacy Report (comparison with EPRI tests). Attachment 2 is the structural analysis of the pressurizer safety and relief line based on as-designed information.
If your staff requires any additional information, please do not hesitate to contact me.
Sincerely,
(
.G.
J. A. Bailey Project Licensing Manager JAB /sm
[
Attachment xc:
D. O. Foster G. Bockhold, Jr.
l I/=
R. A. Thomas T. Johnson (w/o att.)
J. E. Joiner, Esquire D. C. Teper (w/o att.)
Ag l
B. W. Churchill, Esquire L. Fowler g
M j
g M. A. Miller (2)
W. C. Ramsey g'p 8fN B. Jones (w/o att.)
Vogtle Project File L. T. Gucwa g
pu EA BIEEda'
//
NM/
e 0053V 6
i i
- - - - - - - - - - - -