ML20133D196

From kanterella
Jump to navigation Jump to search
Physical Security Insp Repts 50-327/85-30 & 50-328/85-30 on 850903-06.Violation Noted:Compensatory Measures.Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20133D196
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/27/1985
From: Ennis J, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20133D183 List:
References
50-327-85-30, 50-328-85-30, NUDOCS 8510080264
Download: ML20133D196 (1)


See also: IR 05000327/1985030

Text

W

SAFEGUARDS INFORMATION'

'

@ MG

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

[

  • ,%

REGloN 11

g

j

101 MARIETTA STREET, N.W.

  • -

I t

ATLANTA, GEORGIA 30323

%,*****/

OCT 011985

Report Nos. 50-327/85-30 and 50-328/85-30

Licensee:

Tennessee Valley Authority

500A Chestnut Street

Chattanooga, TN 37401

Docket Nos. 50-327 and 50-328

License Nos. DPR-77 and DPR-79

Facility Name:

Sequoyah 1 and 2

Inspection Date:

S tem r 3-6, 1985

Inspector:

, /d[/W

4ff/I)

8F

erry D. Ennjs,7Fiysic41 Yecurity Inspector

'Date Tignsd

9 28 ! 6

Approved y:

c.

D. R. McGuire, Chief, Physical Security Section

Vate Signed

Nuclear Materials Safety and Safeguards Branch

Division of Radiation Safety and Safeguards

SUMMARY

Scope:

This routine, unannounced physical security inspection entailed

27 inspector-hours onsite (two hours on backshift) inspecting:

Locks, Keys, and

Combinations; Physical Barriers - Protected and Vital Areas; Security System

Power Supply; Lighting; Compensatory Measures; Detection Aids - Protected and

Vital Areas; Alarm Stations; and Safeguards Contingency Plan Implementation.

Results:

One violation was identified in the area of compensatory measures.

85100802648$h27

.

PDR

ADOCK

PDR

l

f'ZO::URE CourAIMs

'

G

$5SYEO"o',"yf'c"

PAcc 13 DECOMrttoI,g,gg~

SAFEGUARDS INFORMATION'

- - - -

\\