Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C503 + (ML20132C503)
- ML20132C504 + (ML20132C504)
- ML20132C505 + (ML20132C505)
- PNO-V-85-062A, on 850919,reactor Trip Involving Inoperable Turbine Driven Auxiliary Feedwater Pump & Main Turbine Overspeed Occurred.Caused by Inadequate Lubrication of Bearing.Event Still Under Investigation + (ML20132C506)
- ML20132C507 + (ML20132C507)
- ML20132C508 + (ML20132C508)
- ML20132C509 + (ML20132C509)
- ML20132C510 + (ML20132C510)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle + (ML20132C511)
- ML20132C512 + (ML20132C512)
- ML20132C513 + (ML20132C513)
- ML20132C514 + (ML20132C514)
- ML20132C516 + (ML20132C516)
- IR 05000530/1985009 + (ML20132C517)
- ML20132C518 + (ML20132C518)
- ML20132C519 + (ML20132C519)
- ML20132C520 + (ML20132C520)
- ML20132C522 + (ML20132C522)
- ML20132C523 + (ML20132C523)
- ML20132C524 + (ML20132C524)
- ML20132C527 + (ML20132C527)
- ML20132C528 + (ML20132C528)
- ML20132C529 + (ML20132C529)
- ML20132C532 + (ML20132C532)
- RBG-21-585, Forwards Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Unlicensed Approach Warranted at Present Since Process for Developing Integrated Living Schedule Program in Developmental Phase + (ML20132C534)
- ML20132C535 + (ML20132C535)
- ML20132C536 + (ML20132C536)
- ML20132C537 + (ML20132C537)
- ML20132C539 + (ML20132C539)
- B16057, Informs of Commitments to Revise Surveillance Procedure for Testing DG Air Compressor Auto Start Logic.Ler 96-056-00 Encl + (ML20132C540)
- B11730, Documents Basis for Continued Position That Auxiliary Feedwater Sys Meets Tech Spec & Design Basis Requirements. Areas Addressed Include Design Basis Analysis,Four & three- Loop Operation & Reanalysis Philosophy + (ML20132C541)
- ML20132C542 + (ML20132C542)
- 0CAN088508, Forwards Results of Reanalysis Against NRC Clarification/ Interpretation of App R to 10CFR50 - Supplemental Info, Incorporating Description of Engineering Evaluations Performed Per Generic Ltrs 83-33 & 85-01 + (ML20132C543)
- ML20132C546 + (ML20132C546)
- ML20132C547 + (ML20132C547)
- ML20132C548 + (ML20132C548)
- ML20132C549 + (ML20132C549)
- ML20132C550 + (ML20132C550)
- ML20132C551 + (ML20132C551)
- 05000219/LER-1996-013, :on 961113,mounting Bolts Were Missing from a Seismic Restraint Frame Around (MCC)DC-2.Caused by Personnel Error.Required Reading Will Be Issued & Job Orders Provided with Specific Instructions + (ML20132C552)
- ML20132C553 + (ML20132C553)
- ML20132C554 + (ML20132C554)
- RBG-21-567, Advises That Concern in IE Info Notice 85-09 Not Applicable at Facility,In Response to NRC 850409 Request.Design Includes Remote Shutdown Circuits Separately Fused & Isolated from Main Control Room Circuits + (ML20132C555)
- ML20132C556 + (ML20132C556)
- ML20132C558 + (ML20132C558)
- ML20132C559 + (ML20132C559)
- 3F0785-31, Forwards Fire Protection Evaluations Re Fire Barrier Deviations,Emergency Lights & Protection Against Spurious Actuation of Automatic Fire Suppression Sys,For Review & Concurrence + (ML20132C560)
- IR 05000206/1985013 + (ML20132C561)
- ML20132C562 + (ML20132C562)
- ML20132C564 + (ML20132C564)
- ML20132C565 + (ML20132C565)