Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B765 + (ML20132B765)
- ML20132B767 + (ML20132B767)
- RBG-21649, Forwards Rev to FSAR Re Recirculation Flow Control Hydraulic Penetrations,Per Containment Sys Branch Request. Potential Drywell Bypass Leakage Through Four Penetrations Approx 2% + (ML20132B768)
- ML20132B769 + (ML20132B769)
- ML20132B771 + (ML20132B771)
- ML20132B772 + (ML20132B772)
- ML20132B773 + (ML20132B773)
- LIC-96-0195, Forwards Certificate as Evidence of Util Continuation of Nuclear Energy Liability Insurance Policies of CY97 + (ML20132B775)
- ML20132B776 + (ML20132B776)
- ML20132B778 + (ML20132B778)
- ML20132B779 + (ML20132B779)
- ML20132B780 + (ML20132B780)
- ML20132B781 + (ML20132B781)
- ML20132B782 + (ML20132B782)
- ML20132B783 + (ML20132B783)
- ML20132B784 + (ML20132B784)
- ML20132B785 + (ML20132B785)
- ML20132B787 + (ML20132B787)
- LIC-96-0190, Informs NRC of Application of Interim Operability Criteria for Determining Operability of Two Pipe Supports + (ML20132B789)
- ML20132B791 + (ML20132B791)
- ML20132B792 + (ML20132B792)
- RBG-21505, Forwards Revs to FSAR Section 14.2.12.1, Preoperational Test Procedures. Effect of Revs on SER & Proposed Tech Specs Discussed.Revs Will Be Included in Future FSAR Amend + (ML20132B793)
- 05000336/LER-1996-035-02, :on 961009,failed to Perform Periodic Surveillance Testing for Interlock Function of Ms Isolation Sys Function of Esas.Caused by Inadequate Training. Surveillance Procedure Revised & I&C Personnel re-trained + (ML20132B794)
- PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures + (ML20132B795)
- ML20132B796 + (ML20132B796)
- ML20132B797 + (ML20132B797)
- ML20132B800 + (ML20132B800)
- LIC-96-0197, Informs That Tl Patterson Has Resigned from Util Effective 961213 + (ML20132B801)
- ML20132B802 + (ML20132B802)
- ML20132B803 + (ML20132B803)
- ML20132B804 + (ML20132B804)
- ST-HL-AE-5514, Fowards Annual Rept of ECCS Model Revs During 1996 + (ML20132B805)
- ML20132B807 + (ML20132B807)
- ML20132B808 + (ML20132B808)
- ML20132B810 + (ML20132B810)
- ML20132B812 + (ML20132B812)
- ML20132B813 + (ML20132B813)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval + (ML20132B814)
- ML20132B815 + (ML20132B815)
- RBG-21442, Forwards Rev to FSAR Sections 3.6A & App 3C.Revs Result of Completion of Equipment Installation,Final Walkdowns of Equipment Location & Verification of Final Stress Calculations.Info Suppls Submittals Re SER Open Item 3 + (ML20132B816)
- ML20132B817 + (ML20132B817)
- ML20132B818 + (ML20132B818)
- ML20132B819 + (ML20132B819)
- ML20132B820 + (ML20132B820)
- ML20132B821 + (ML20132B821)
- RBG-21487, Forwards Final Response to NRC 850430 Request for Addl Info Re Feedwater Line Break Outside Containment.Confirmatory Analysis Encl to Suppl Util 850520 Response,Per Discussion W/Mechanical Engineering Branch + (ML20132B822)
- ML20132B823 + (ML20132B823)
- ML20132B826 + (ML20132B826)
- ML20132B827 + (ML20132B827)
- RBG-21443, Forwards Revs to FSAR & Tech Specs in Response to Auxiliary Sys Branch Concern Re Standby Liquid Control Sys Discussed During Tech Spec Review + (ML20132B828)
- RBG-21485, Forwards Revs to FSAR Section 8.3 Re Final Loading Info for Standby Diesel Generators.No Addl Impact Expected on FSAR or Proposed Tech Specs.Revs Will Be Included in Future FSAR Amend + (ML20132B829)