Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B736 + (ML20132B736)
- ML20132B737 + (ML20132B737)
- NRC-96-0125, Forwards Addl Info on Proposed TS Change on Administrative Controls + (ML20132B738)
- ML20132B740 + (ML20132B740)
- ML20132B741 + (ML20132B741)
- ML20132B742 + (ML20132B742)
- ML20132B743 + (ML20132B743)
- ML20132B745 + (ML20132B745)
- ML20132B747 + (ML20132B747)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed + (ML20132B748)
- PY-CEI-NRR-0350, Suppls 850717 Response to 850520 Request for Addl Info Re Offsite Dose Calculation Manual.Emergency Svc Water Radiation Monitors Will Be Set to Alarm at Three Times Measured Background Level + (ML20132B750)
- TXX-4518, Forwards Listed Documents,Including Rev 3 to Engineering Justification for Placement of Automatic... by Prof Loss Control,Inc & Table Listing Fire Area NFPA Code Compliance. Encls Should Close Concerns Re Sprinkler Sys + (ML20132B751)
- ML20132B752 + (ML20132B752)
- ML20132B753 + (ML20132B753)
- ML20132B754 + (ML20132B754)
- HL-5278, Special Rept:On 961203,30 Days Elapsed Since Position Indication Light for MSIV 1B21-F022D Declared Inoperable. Caused by Limit Switch Out of Proper Adjustment for Power Conditions.Light Will Be Restored During Next Outage + (ML20132B755)
- ML20132B756 + (ML20132B756)
- ML20132B758 + (ML20132B758)
- ML20132B759 + (ML20132B759)
- 05000263/LER-1996-011-01, :on 961112,jumper Placement Error Occurred During Surveillance Procedure,Causing Dual Recirculation Pump Trip Requiring Manual Scram.Caused by Inadequate Labeling.Surveillance Procedure Revised + (ML20132B760)
- ML20132B761 + (ML20132B761)
- ML20132B765 + (ML20132B765)
- ML20132B767 + (ML20132B767)
- RBG-21649, Forwards Rev to FSAR Re Recirculation Flow Control Hydraulic Penetrations,Per Containment Sys Branch Request. Potential Drywell Bypass Leakage Through Four Penetrations Approx 2% + (ML20132B768)
- ML20132B769 + (ML20132B769)
- ML20132B771 + (ML20132B771)
- ML20132B772 + (ML20132B772)
- ML20132B773 + (ML20132B773)
- LIC-96-0195, Forwards Certificate as Evidence of Util Continuation of Nuclear Energy Liability Insurance Policies of CY97 + (ML20132B775)
- ML20132B776 + (ML20132B776)
- ML20132B778 + (ML20132B778)
- ML20132B779 + (ML20132B779)
- ML20132B780 + (ML20132B780)
- ML20132B781 + (ML20132B781)
- ML20132B782 + (ML20132B782)
- ML20132B783 + (ML20132B783)
- ML20132B784 + (ML20132B784)
- ML20132B785 + (ML20132B785)
- ML20132B787 + (ML20132B787)
- LIC-96-0190, Informs NRC of Application of Interim Operability Criteria for Determining Operability of Two Pipe Supports + (ML20132B789)
- ML20132B791 + (ML20132B791)
- ML20132B792 + (ML20132B792)
- RBG-21505, Forwards Revs to FSAR Section 14.2.12.1, Preoperational Test Procedures. Effect of Revs on SER & Proposed Tech Specs Discussed.Revs Will Be Included in Future FSAR Amend + (ML20132B793)
- 05000336/LER-1996-035-02, :on 961009,failed to Perform Periodic Surveillance Testing for Interlock Function of Ms Isolation Sys Function of Esas.Caused by Inadequate Training. Surveillance Procedure Revised & I&C Personnel re-trained + (ML20132B794)
- PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures + (ML20132B795)
- ML20132B796 + (ML20132B796)
- ML20132B797 + (ML20132B797)
- ML20132B800 + (ML20132B800)
- LIC-96-0197, Informs That Tl Patterson Has Resigned from Util Effective 961213 + (ML20132B801)
- ML20132B802 + (ML20132B802)
- ML20132B803 + (ML20132B803)