ML20132B756

From kanterella
Jump to navigation Jump to search
Forwards Listed Documents,Including Rev 3 to Engineering Justification for Placement of Automatic... by Prof Loss Control,Inc & Table Listing Fire Area NFPA Code Compliance. Encls Should Close Concerns Re Sprinkler Sys
Date released: 05/25/2020 Download: ML20132B756


Rev 3 to Engineering Justification for Placement of Automatic Sprinklers,Comanche Peak Steam Electric Plant.
ML20132B758
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 05/27/1985
From: Dungan K, Olaughlin R, Wahl W
PROFESSIONAL LOSS CONTROL, INC.
To:
References
Download: ML20132B758 (37)
Forwards Listed Documents,Including Rev 3 to Engineering Justification for Placement of Automatic... by Prof Loss Control,Inc & Table Listing Fire Area NFPA Code Compliance. Encls Should Close Concerns Re Sprinkler Sys
ML20132B751
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/22/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: NOONAN V S
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
References
Download: ML20132B751 (5)