Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129B894 + (ML20129B894)
- IA-85-128, Discusses Effects of Fire Protection Sys Actuation on safety-related Equipment.Issue May Not Have Been Adequately Considered.Div of Engineering Reviewing Recent Fire Sys Actuations + (ML20129B897)
- ML20129B897 + (ML20129B897)
- ML20129B898 + (ML20129B898)
- ML20129B899 + (ML20129B899)
- ML20129B900 + (ML20129B900)
- ML20129B904 + (ML20129B904)
- 05000295/LER-1985-021-04, :on 850603,when Instrument Bus Switched from Alternate to Normal Power,Momentary Power Loss Caused Reactor Trip.Caused by Switching Procedure Not Being Referenced.Warning Sign Placed at Switch + (ML20129B905)
- ML20129B906 + (ML20129B906)
- ML20129B907 + (ML20129B907)
- ML20129B909 + (ML20129B909)
- ML20129B910 + (ML20129B910)
- 05000341/LER-1985-007, :on 850423,24 & 25,Tech Spec 3.3.7.11.b Violated Due to Grab Samples Not Taken within Required 8 H Period When Radiation Monitor Inoperable.Caused by Personnel Error.Personnel Counseled.Procedure Written + (ML20129B911)
- ML20129B912 + (ML20129B912)
- ML20129B913 + (ML20129B913)
- ML20129B914 + (ML20129B914)
- ML20129B915 + (ML20129B915)
- PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed + (ML20129B916)
- 05000219/LER-1996-006, :on 960818,augmented Offgas Hydrogen Analyzer Left Out of Service.Caused by Procedure Deficiency.Returned Analyzer to Service,Reviewed Procedure & Counseled Operators on Sys Startup + (ML20129B917)
- ML20129B918 + (ML20129B918)
- ML20129B919 + (ML20129B919)
- IA-85-206, Responds to FOIA Request for Contracts & Purchase Orders for Svcs Awarded to Commerce Clearing House for CY85-86.Purchase Order for CY85 Encl.No Contracts Awarded for CY85 + (ML20129B919)
- ML20129B920 + (ML20129B920)
- B15895, Provides Info Required by Unit 2 TS 3.3.3.4 & Constitutes Special Rept Required by Specification & TS 6.9.2 + (ML20129B922)
- 05000295/LER-1985-019-04, :on 850607,reactor Trip Resulted in High Steam Flow Safeguards Actuation,Closing All Msivs.Caused by Failure of Summator,Which Spiked Low.Module Replaced + (ML20129B923)
- ML20129B927 + (ML20129B927)
- ML20129B930 + (ML20129B930)
- ML20129B931 + (ML20129B931)
- B15950, Notifies Commission That R Gauzza,License SOP-3198-6, Transferred to Position No Longer Requiring SO License + (ML20129B932)
- 05000341/LER-1985-021, :on 850607,reactor Protection Sys & ESF Actuations Occurred During Surveillance Testing of Reactor Vessel Pressure Instruments.Caused by Personnel Error. Procedure Revised + (ML20129B934)
- ML20129B937 + (ML20129B937)
- ML20129B939 + (ML20129B939)
- B15948, Notifies NRC of Change of Status of SO License of J Stanford (SRO 10218),per 10CFR50.74.J Stanford License No Longer Needed Due to Reassignment + (ML20129B940)
- ML20129B941 + (ML20129B941)
- TXX-4505, Final Deficiency Rept SDAR-177 Re Possible Defect in Pipe & Tubular Steel Products.Initially Reported on 850412.Item Not Reportable Per 10CFR50.55(e) + (ML20129B943)
- ML20129B946 + (ML20129B946)
- IA-84-734, Responds to Appeal Re Denial of FOIA Request for Replies to Tayloe Questions Re Invitation for Bids,SECY-84-327, Per App D of NRC 850206 Partial Response Ltr.Document Withheld (Ref FOIA Exemption 5) + (ML20129B946)
- ML20129B949 + (ML20129B949)
- ML20129B950 + (ML20129B950)
- ML20129B951 + (ML20129B951)
- ML20129B953 + (ML20129B953)
- NSD-NRC-96-4841, Submits Responses to 961003 Telcon Re NRC Mechanical Engineering Branch Questions Related to Qa,Reactor Vessel Internal Vibration,Crdms & Equipment Seismic Qualification + (ML20129B956)
- ML20129B957 + (ML20129B957)
- IR 05000458/1985018 + (ML20129B958)
- ML20129B961 + (ML20129B961)
- ML20129B962 + (ML20129B962)
- RBG-21-126, Suppls Re Shift Advisors.Wj Beck Replaces J Mccullough & Should Be Included in List of Individuals Qualified as Shift Advisors.Beck Resume Encl + (ML20129B963)
- RBG-21-568, Forwards,For Review,Proposed Revs to Tech Spec 3/4.3.2 Re Isolation Actuation Instrumentation.Changes Conform to Info Contained in FSAR + (ML20129B965)
- ML20129B966 + (ML20129B966)
- ML20129B967 + (ML20129B967)
- ML20129B969 + (ML20129B969)