ML20129B969

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/85-23 & 50-414/85-18 on 850520-24.No Violation Noted
ML20129B969
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/05/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20129B974 List:
References
NUDOCS 8507290311
Download: ML20129B969 (1)


See also: IR 05000413/1985023

Text

V>$hk

.

.

JUN

5 1985

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT NOS. 50-413/85-23 AND 50-414/85-18

On May 20 - 24, 1985, NRC inspected activities authorized by NRC Operating

License No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba

facility. At the conclusion of the inspection, the findings were discussed with

those members of your staff identified in the enclosed inspection report.

.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Ib

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-413/85-23

and 50-414/85-18

cc w/ enc 1:

R. L. Dick, Vice President - Construction

J. W. Hampton, Station Manager

bec w/ encl:

Document Control Desk

State of South Carolina

G. Johnson, ELD

K. N. Jabbour, NRR

R

SHs. ?

R

- h

bS

'

Nh.;

omas:es

Jap

AR er t

Q

l

6/3 /85

6/3

5

blf/85

,h

8507290311 850605

PDR

ADOCK 05000413

l(

G

PDR

ZE^ol