Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128K991 + (ML20128K991)
- TXX-4514, Forwards Table of Parameters on SPDS Displays,Per 850625-26 Audit Request + (ML20128K993)
- ML20128K994 + (ML20128K994)
- ML20128K995 + (ML20128K995)
- ML20128K997 + (ML20128K997)
- ML20128K998 + (ML20128K998)
- ML20128L000 + (ML20128L000)
- ML20128L001 + (ML20128L001)
- ML20128L002 + (ML20128L002)
- ML20128L003 + (ML20128L003)
- ML20128L005 + (ML20128L005)
- PY-CEI-NRR-2100, Forwards Rev 8 to USAR for Perry Nuclear Power Plant, Reflecting Facility & Procedure Changes Made After Cutoff Date of Last Submittal & 960410 + (ML20128L007)
- ML20128L008 + (ML20128L008)
- ML20128L011 + (ML20128L011)
- ML20128L012 + (ML20128L012)
- ML20128L013 + (ML20128L013)
- ML20128L016 + (ML20128L016)
- ML20128L017 + (ML20128L017)
- ML20128L019 + (ML20128L019)
- IR 05000269/1985006 + (ML20128L020)
- ML20128L021 + (ML20128L021)
- ML20128L022 + (ML20128L022)
- B11614, Responds to 850312 Request for Addl Info to Close SER Open Item 15,including Increase in Illumination Level at Manned Work Stations,Compliance W/Illuminating Engineers Soc Handbook & Definition of High & Slight Hazard + (ML20128L023)
- 05000482/LER-1985-036-01, :on 850531,ESF Actuation Signal Initiated When Steam Generator Level Bistable Tripped in Error During Maint Activity.Caused by Technician Pressing Trip Button on Wrong Bistable Logic Card.Personnel Counseled + (ML20128L024)
- ML20128L026 + (ML20128L026)
- ML20128L028 + (ML20128L028)
- ML20128L030 + (ML20128L030)
- TXX-4510, Forwards Safety Evaluations Performed by Westinghouse & Gibbs & Hill,Supporting 850517 Request to Change Tech Specs to Allow Use of Manual Operators on MSIV Bypass Valves. Analyses Indicate No Safety Impact as Result of Mod + (ML20128L032)
- ML20128L034 + (ML20128L034)
- ML20128L036 + (ML20128L036)
- ML20128L037 + (ML20128L037)
- ML20128L040 + (ML20128L040)
- ML20128L041 + (ML20128L041)
- ML20128L042 + (ML20128L042)
- ML20128L044 + (ML20128L044)
- 05000311/LER-1985-005, :on 850417,reactor/turbine Trip Occurred During Startup Operations.Caused by Corrosion Products Collected in Reheat Steam Drain Line Piping Following Extended Shutdown. Procedural Review to Be Performed Re Blowdown + (ML20128L045)
- ML20128L048 + (ML20128L048)
- ML20128L050 + (ML20128L050)
- IR 05000416/1985006 + (ML20128L051)
- ML20128L052 + (ML20128L052)
- IR 05000327/1985018 + (ML20128L054)
- ML20128L055 + (ML20128L055)
- ML20128L056 + (ML20128L056)
- ML20128L057 + (ML20128L057)
- PNO-I-85-051, on 850717,diesel Generator 1 Failed Monthly Surveillance Test Due to Woodward Governor Load Limit Setting Being Set at 3,instead of Normal Setting of 10. Caused by Possible Tampering W/Generator Setting + (ML20128L059)
- IR 05000369/1985015 + (ML20128L063)
- B11603, Clarifies Misinterpretations of Re Insp Rept 50-213/85-07.Ltr Discussed Measures Planned to Approve Coordination & Technical Review of Submittals to Nrc.No Specific Procedures to Fulfill Objective Implemented + (ML20128L064)
- PNO-I-85-052, on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned + (ML20128L068)
- ML20128L070 + (ML20128L070)
- ML20128L071 + (ML20128L071)
- ML20128L073 + (ML20128L073)