Category:INSPECTION REPORT
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:UTILITY
MONTHYEARIR 05000324/19900441990-11-20020 November 1990 Partially Withheld Insp Repts 50-324/90-44 & 50-325/90-44 on 901022-26.No Violations Noted.Areas Inspected:Records, Operations & Physical Inventory for Use,Control & Accountability of SNM ML20062G3941990-11-19019 November 1990 Insp Repts 50-324/90-41 & 50-325/90-41 on 901002-1104. Noncited Violation Noted.Areas Inspected:Surveillance Observation,Operational Safety Verification,Initial Response to Onsite Events,Onsite Review & Followup IR 05000324/19900461990-11-0505 November 1990 Partially Withheld Insp Repts 50-324/90-46 & 50-325/90-46 on 901017 (Ref 10CFR73.21).No Violations or Deviations Noted. Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19900421990-10-23023 October 1990 Insp Repts 50-324/90-42 & 50-325/90-42 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Independent Action Plan Action Items to Correct Three Weaknesses Identified in 1989 by NRC IR 05000324/19900321990-10-18018 October 1990 Insp Repts 50-324/90-32 & 50-325/90-32 on 900806-10 & 20-24. No Violations Noted.Major Areas Inspected:Inservice Testing, Reverse Pressurization of Containment Isolation Valves & Followup on Previous Insp Findings IR 05000324/19900371990-10-18018 October 1990 Insp Repts 50-324/90-37 & 50-325/90-37 on 900908-1001. Violations Noted.Major Areas Inspected:Maint & Surveillance Observation,Operational Safety Verification,Esf Sys Walkdown,Ler Review & Nonroutine Reporting Program IR 05000324/19900361990-09-17017 September 1990 Insp Repts 50-324/90-36 & 50-325/90-36 on 900821-25.Major Areas Inspected:Review of Events That Lead to Unit 2 Reactor Trip on 900819 IR 05000324/19900301990-08-24024 August 1990 Partially Withheld Insp Repts 50-324/90-30 & 50-325/90-30 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Mgt Support,Security Program Plans & Audits IR 05000324/19900281990-08-24024 August 1990 Insp Repts 50-324/90-28 & 50-325/90-28 on 900723-27.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluent,Plant Chemistry & Confirmatory Measurements IR 05000324/19900311990-08-23023 August 1990 Insp Repts 50-324/90-31 & 50-325/90-31 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Diagnostic Evaluation Team Evaluation of Integrated Action Plan Corrective Action IR 05000324/19900261990-08-22022 August 1990 Safety Insp Repts 50-324/90-26 & 50-325/90-26 on 900701-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Onsite Review Committee & Onsite LER Review IR 05000324/19900271990-08-0303 August 1990 Revised Insp Repts 50-324/90-27 & 50-325/90-27 on 900709-12. No Violations Noted.Major Areas Inspected:Electrical Sys Designs & Maint ML20059A7231990-08-0101 August 1990 Insp Repts 50-324/90-27 & 50-325/90-27 on 900709-12.No Violations or Deviations Noted.Major Areas Inspected: Electrical Sys Design & Maint & Follow Up to Potential Concerns Identified in Previous Insp IR 05000324/19900251990-07-26026 July 1990 Insp Repts 50-324/90-25 & 50-325/90-25 on 900709-13. Violations Noted.Major Areas Inspected:Review of Licensee Organization & Mgt Controls & Onsite Followup of Events at Facility ML20056A9101990-07-17017 July 1990 Insp Repts 50-324/90-19 & 50-325/90-19 on 900601-30.No Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Licensee self-assessment Capability & Onsite LER Review IR 05000324/19900231990-07-11011 July 1990 Insp Repts 50-325/90-23 & 50-324/90-23 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Status of Corrective Action Program for Problems Noted by Site Issued Engineering Work Requests IR 05000324/19900221990-07-10010 July 1990 Insp Repts 50-324/90-22 & 50-325/90-22 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Planning & Technical Issues Associated W/Recirculation Sys Inlet & Core Spray Sys safe-ends & Piping Replacement IR 05000324/19900211990-06-26026 June 1990 Insp Repts 50-324/90-21 & 50-325/90-21 on 900521-25.No Violations or Deviations Noted.Major Areas Inspected: Followup of Diagnostic Evaluation Team Findings IR 05000324/19890301989-09-28028 September 1989 Partially Withheld Insp Repts 50-324/89-30 & 50-325/89-30 on 890904-08 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Records & Repts, Protected & Vital Area Access Controls & Alarm Stations IR 05000324/19890221989-09-22022 September 1989 Revised Pages to Insp Repts 50-324/89-22 & 50-325/89-22 ML20248C8911989-09-18018 September 1989 Insp Repts 50-324/89-24 & 50-325/89-24 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected: Corrective Actions in Response to Previous Insp Findings Re Environ Qualification of Electrical Equipment & LER 84-16 IR 05000324/19890201989-09-14014 September 1989 Safety Insp Repts 50-324/89-20 & 50-325/89-20 on 890801-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, 10CFR21 Reporting & Onsite LERs Review IR 05000324/19890271989-09-14014 September 1989 Partially Withheld Insp Repts 50-324/89-27 & 50-325/89-27 on 890824-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel ML20247D7241989-09-0606 September 1989 Insp Repts 50-324/89-22 & 50-325/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Open Items,Especially Issue of Svc Water Lube Water Support Operability IR 05000324/19890141989-08-28028 August 1989 Insp Repts 50-324/89-14 & 50-325/89-14 on 890622-0731. Violations Noted.Major Areas Inspected:Maint & Surveillance Observations,Esf Sys Walkdown,Rosemount Analog Transmitter Trip Unit Failures & Onsite & in-ofc LER Reviews IR 05000324/19890231989-08-16016 August 1989 Partially Withheld Insp Repts 50-324/89-23 & 50-325/89-23 on 890803-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19890181989-08-10010 August 1989 Insp Repts 50-324/89-18 & 50-325/89-18 on 890710-14. Violation & Unresolved Item Noted.Major Areas Inspected: Snubber Surveillance Program,Licensee Identified Items & Licensee Action on Previous Insp Findings IR 05000324/19890211989-08-0808 August 1989 Partially Withheld Insp Repts 50-324/89-21 & 50-325/89-21 on 890720-22 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19890171989-07-27027 July 1989 Insp Repts 50-324/89-17 & 50-325/89-17 on 890710-14.No Violations Noted.Major Areas Inspected:Radiological Effluents,Plant Chemistry & Environ Monitoring IR 05000324/19890161989-07-24024 July 1989 Partially Withheld Insp Repts 50-324/89-16 & 50-325/89-16 on 890626-30 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security program.Non-cited Violation Noted Re Inattentive Guard ML20247L2421989-07-19019 July 1989 Insp Repts 50-324/89-11 & 50-325/89-11 on 890522-26 & 0620-22.Violations Noted.Major Areas Inspected:Licensee Methods of Meeting Requirements of 10CFR50,App R,Sections Iii.G Iii.J & Iii.L for Safe Shutdown Capabilities IR 05000324/19890151989-07-12012 July 1989 Insp Repts 50-325/89-15 & 50-324/89-15 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Rcic, F013 Valve Replacement,Temporary Instruction 2500/27,IE Bulletin 88-05,inspector Identified Items & LERs IR 05000324/19890131989-06-26026 June 1989 Insp Repts 50-324/89-13 & 50-325/89-13 on 890522-24.No Violations or Deviations Noted.Weaknesses Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise & Associated Critique IR 05000324/19890101989-06-14014 June 1989 Insp Repts 50-324/89-10 & 50-325/89-10 on 890508-12.No Violations or Deviations Noted.Major Areas Inspected:Ie Bulletins 79-02 & 79-14,Mark I Containment & Plant Unique Analysis Rept IR 05000324/19890091989-06-0202 June 1989 Insp Repts 50-324/89-09 & 50-325/89-09 on 890418-0515.No Violations Noted.Weakness Noted Re Failure to Convey Two Potential Concerns to Technical Support Staff.Major Areas Inspected:Svc Water Design Deficiencies & LER Review IR 05000324/19890071989-05-0808 May 1989 Insp Repts 50-324/89-07 & 50-325/89-07 on 890316-0417. Violation Noted Re Cracked Environmentally Qualified Cable Insulation on Acoustic Monitor.Major Areas Inspected:Onsite LER Review,Tmi Action Items & QA Program Implementation IR 05000324/19890011989-05-0303 May 1989 Insp Repts 50-324/89-01 & 50-325/89-01 on 890109-13 & 23-27. Violations Noted.Major Areas Inspected:Maint Program & Implementation IR 05000324/19890061989-04-17017 April 1989 Insp Repts 50-324/89-06 & 50-325/89-06 on 890306-10.No Violations & Deviations Noted.Major Areas Inspected: IE Bulletin Followup & Action on Previous Insp Findings IR 05000324/19890081989-04-0707 April 1989 Partially Withheld Insp Repts 50-324/89-08 & 50-325/89-08 on 890313-17 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Power Supply ML20244C9821989-04-0606 April 1989 Insp Repts 50-324/89-05 & 50-325/89-05 on 890201-0315. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification,Esf Sys Walkdown & Onsite Licensee Event Repts Reviews ML20235W2161989-02-27027 February 1989 Insp Repts 50-324/89-02 & 50-325/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Flow Restricting Orifices & Onsite LER Review IR 05000324/19890031989-02-10010 February 1989 Insp Repts 50-324/89-03 & 50-325/89-03 on 890123-27.No Violations Noted.Major Areas Inspected:Followup to Operational Performance Assessment Conducted on 880627-0715, Described in Insp Repts 50-324/88-19 & 50-325/88-19 IR 05000324/19890041989-02-10010 February 1989 Insp Repts 50-324/89-04 & 50-325/89-04 on 890117-20 & 30.No Violations Noted.Major Areas Inspected:Review of Emergency Plan & Implementing Procedures,Emergency Facilities, Equipment,Instrumentation & Supplies ML20235R3421989-01-25025 January 1989 Insp Repts 50-324/88-200 & 50-325/88-200 on 880926-1007. Technical Inaccuracies Noted.Major Areas Inspected:Emergency Operating Procedures,Procedures & Plant Operations Re Human Factors & Primary Containment Venting Procedures IR 05000324/19880371988-11-25025 November 1988 Insp Repts 50-324/88-37 & 50-325/88-37 on 881017-19 & 27. Violation Noted.Major Areas Inspected:Emergency Preparedness Exercise IR 05000324/19880381988-11-23023 November 1988 Insp Repts 50-324/88-38 & 50-325/88-38 on 881001-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification & Onsite Followup of Events IR 05000324/19880341988-11-0404 November 1988 Safety Insp Repts 50-324/88-34 & 50-325/88-34 on 880901-30. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, 10CFR21 Followup & LERs Review IR 05000324/19880361988-10-28028 October 1988 Insp Repts 50-324/88-36 & 50-325/88-36 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Mark I Containment long-term Program Mods.Three Unresolved Items Identified,Including Suppression Pool Temp IR 05000324/19880351988-10-0606 October 1988 Partially Withheld Insp Repts 50-324/88-35 & 50-325/88-35 on 880912-16 (Ref 10CFR2.790(d) & 73.21).No Violations Noted. Major Areas Inspected:Program Audit,Records & Repts,Power Supply & Training & Qualification IR 05000324/19880291988-10-0303 October 1988 Insp Repts 50-324/88-29 & 50-325/88-29 on 880808-31.No Violations or Deviations Noted.Major Areas Inspected:Maint Observation,Surveillance Observation,Operational Safety Verification,Review of LERs & Unresolved Items 1990-09-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
See also: IR 05000324/1985014
Text
. .
p rec UNITED STATES
oq'o NUCLEAR REGULATORY COMMISSION
[' o REGION 11
g j 101 MARIETTA STREET,N.W.
'* I
c AT LANTA, GEOR GI A 30323
%...../ .
Report Nos.: 50-325/85-14 and 50-324/85-14
Licensee: Carolina Power and Light Company-
411 Fayetteville Street
Raleigh, NC 27602
Docket Nos.: 50-325 and 50-324 License Nos.: DPR-71 and DPR-62
Facility Name: Brunswick 1 and 2
Inspection Conducted: May 20-24, 1985
Inspectors: . p - d ~ /7 ' ff
N. Merriweather, Team Leader Date Signed
R. Pierson
f Yr- h
'
d-l?'Y
Date Signed
H. Whitcomb~
fd N
, h - 19 "?f
Date Signed
Consultant: P. M. Chan, Lawrence Livermore National Laboratory
Accompanying Personnel: T. E. Conlon
Approved by: pp & d '/7' W
T. E. Conlon, Section Chief Date Signed
Engineering Branch
Division of Reactor Safety
SUMMARY
Scope: This special, announced inspection entailed 130 inspector-hours on site
concerning licensee response to Generic Letter (GL) 83-28, Required Actions Based
on Generic Implications of Salem Anticipated Transient Without Scram (ATWS)
Events. Areas inspected included: post-trip review; equipment classification;
vendor interface and manual control; surveillance and post-maintenance testing;
and reactor trip system reliability.
Results: No violations or deviations were identified.
$[kD
G
og _
. ,
i
REPORT DETAILS
1. Persons Contacted
Licensee Employees
- E. A. Bishop, Assistant to General Manager
- J. W. Chase, Manager - Operations
- J. D. E. Jeffries, Manager - Corporate Nuclear Safety
- L. E. Boyer, Director - Administrative Support ,
- M. A. Jones, Acting Director - Onsite Nuclear Safety
- J. O'Sullivan, Manager - Maintenance
- D. E. Quidley, Instrumentation and Control (I&C) Maintenance Representative
- J. W. Moyer, I&C Maintenance Supervisor
- R. E. Helme, Director of Onsite Nuclear Safety
- B. E.-Hinkley, Manager - Technical Support
- M. Hogle, Engineering Supervisor - Technical Support
- M. Kesmodel, Document Control Supervisor
- K. E. Enzor, Director Regulatory Compliance
- J. Boone, Principal Engineer - Special Projects
- W. Leonard, Principal Engineer.- Operations
D. Fasnacht, Principal Engineer - Licensing
W. Murray, Senior Engineer - Onsite Licensing
G. Eagle, Projects Engineer - Computer
D. Savage, Shift Foreman
M. Robinson, Document Control
- L. Jones, Director - Quality Assurance / Quality Control (QA/QC)
- R. Creech, I&C Maintenance Supervisor
- R. M. Rogers, Engineer - QA
W. Martin, Onsite Nuclear Safety
D. Phipps, Performance Engineer
G. Locklear, Q-List Coordinator
B. Parks, Engineering Supervisor
T. Mills, Procurement Engineer
I. Fermyduval, I&C Planner
M. S. Haynes, I&C Foreman
R. Drew, I&C Maintenance Engineer
P. Musser, Senior Engineer
Other licensee employees contacted included engineers, technicians, opera-
tors, security force members, and office personnel.
Other Organizations
D. Musick, Engineer, General Electric Co.
W. Kassebaum, Engineering Consultant
.
. .
2
NRC Resident Inspector
L. Garner, Resident Inspector
2. Exit Interview
The inspection scope and findings were summarized on May 24, 1985, with
those persons indicated in paragraph 1 above. The inspectors described the
areas inspected and discussed in detail the inspection findings. No dissent-
ing comments were received from the licensee. The following new item was
identified during this inspection:
Inspector Followup Item 325, 324/85-14-01, Q-List Program Changes,
paragraph 7.
The licensee did not identify as proprietary any of the materials provided
to or reviewed by the inspectors during this inspection.
'
3. Licensee Action on Previous Enforcement Matters
This subject was not addressed in the inspection.
4. Unresolved Items
Unresolved items were not identified during this inspection.
5. Background
In February 1983, the Salem Nuclear Power Station experienced two failures
of the reactor trip system upon the receipt of trip signals. These failures
were attributed to Westinghouse - Type DB-50 reactor trip system (RTS)
circuit breakers. The failures at Salem on February 22 and 25,1983, were
believed to have been caused by a binding action within the undervoltage
trip attachment (UTVA) located inside the breaker cubicle. Due to problems
of the circuit breakers at Salem and at other plants, NRC issued Generic
Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS
Events, dated July 8, 1983. This letter required the licensees to respond
on immediate-term actions to ensure reliability of the RTS. Actions to be
performed included development of programs to provide for post-trip review,
classification of equipment, vendor interface, post-maintenance testing, and
RTS reliability improvements. The licensee responded to Generic Letter
83-28 by correspondence dated November 7,1983. This inspection was per-
formed to review the licensee's current program, planned program improve-
ments, and implementation of present procedures associated with post-trip
review, equipment classification, vendor interface, post-maintenance test-
ing, and reactor trip system reliability for Brunswick Steam Electric Plant
(BSEP) Units 1and2.
_.
_ _ .
. .
3
6. Post-Trip Review
The inspector reviewed the licensee's response to Ceneric Letter 83-28 which
described their program for post-trip review. Their implementation of these
guidelines was also evaluated. The post-trip review program is addressed
and implemented by Operating Instruction: 01-22, Plant Incident And Post-
trip Investigation.
The capability for assessing the sequence of events leading to a reactor
trip is provided by the process computer, a Honeywell 4010. The process
computer receives power from the uninterruptible power supply (UPS) system.
The UPS System consists of a vital bus, a power switching module, and two
power converter modules, each supplied by divisionalized emergency ac and de
sources. Each power converter module is capable of supplying the total UPS
load. Only one power converter module is in service, with the other module
in standby.
The process computer provides data points for two post-trip logs: (1)
Nuclear Steam Supply System (NSSS) log which includes data points for
Average Power Range Monitor, Generator Megawatts, Reactor Pressure, Core
Power Recirculation Flow, Feedwater Flow A, Feedwater Flow B, Reactor Level,
Steam Flow and Throttle Pressure and the (2) Balance of Plant (B0P) log
which includes approximately 30 additional data points. The functions of
the 80P programs are to monitor assigned B0P, to perform calculations, and
to log plant performance variables not directly associated with the Nuclear
Steam Supply System. The NSSS is set for one-second intervals for one
minute prior to the SCRAM to one minute following the SCRAM. The B0P values
are set for various intervals for approximately five minutes prior to the
SCRAM to five minutes following the SCRAM depending upon the set-time
interval. In addition, the computer provides for a sequence of events alarm
log printout and provides control rod drive position. Strip charts from
control room indicators are also utilized and are included in the Post-Trip
report as specified in Attachment 1 of 01-22.
Operating Instruction: 01-22 clearly specifies the requircments for review-
ing trip data. The qualifications, responsibilities and authority of the
personnel responsible for performing the review and analysis are clearly
delineated. Criteria for determining the acceptability of a plant restart
conform with the guidelines as described in Generic Letter 83-28, and 01-22
adequately describes the methods and criteria for comparing the event
information with known or expected plant behavior.
If the cause of the event is repetitive and requires more extensive action a
mechanism exists for providing for an independent assessment of the event
prior to conducting restart. If the cause of the trip cannot be determined,
if a potential safety concern exists or if a specified system did not
respond as required, reactor startup is prohibited until concurrence is
obtained from the Plant Nuclear Safety Committee.
,
. .
4
Interviews revealed that plant personnel preparing and/or reviewing the
post-trip documentation were familiar with plant systems, equipment, and
plant operation. Training had been performed and rescheduled periodically
and the training records were being maintained.
The inspector reviewed six reactor SCRAMS which included Unit No. 1 SCRAMS
on March 31, 1984, August 1, 1984 and January 24, 1985 and Unit No. 2 SCRAMS
on February 22, 1984, October 24, 1984 and November 27, 1984. The packages
appeared to be thorough and adequately documented the events. Documentation
of corrective action was also included in those instances where it had been
completed.
Site procedures provide for the identification of Plant Incident and Post-
Trip Invastigation reports and accompanying data as Quality Assurance (QA)
records and for storage of these records in the proper location. The plant
Incident and Post-Trip Investigation reports are placed in QA Documentation
storage following completion of any procedure changes and required plant
modifications and following completion of the senior plant management
review.
Several instances were found where these documents were not placed in
document control in a timely manner. For example, Post-Trip reviews of
February 22, 1984, October 24, 1984, November 27, 1984 and January 24, 1985
are still in the custody of the Operations Engineer since corrective action
has not been completed. However, following implementation of corrective
action (in most cases these were procedural changes or modifications requir-
ing a refueling outage) the package will be forwarded for QA Document
Storage. However, the long time span for which these documents are not
maintained under controlled storage conditions is potentially hazardous for
document retention. The licensee acknowledged this concern and informed the
inspectors that the procedure was being revised to have the reports reviewed
in a more timely manner.
Onsite Nuclear Safety has developed computer software to facilitate graphi-
cal display of the process computer data points; however, the data points
must still be manually inserted. This graphical analysis was performed by
Onsite Nuclear Safety during their review of the SCRAM. This program has
since been turned over to Operations to allow Operations to plot these
graphs. Operations utilizes this graphic capability only during instances
when the cause of the SCRAM is not immediately obvious or when subsequent
analysis is required. For reactor SCRAMS from apparently known, easily
diagnosed causes, graphing of the NSSS data points is not used. This
presents potential problems as some phenomena may not be readily recognized
unless graphical results are utilized. The licensee acknowledged this
concern and agreed to review this matter further. The NRC inspector agreed
with the licensee's approach and had no further concerns.
Within the area examined, no violations or deviations were identified.
. .
5
7. Equipment Classification
The licensee was requested in GL 83-28 to confirm that all components of the
reactor trip system whose function is required to trip the reactor are
identified as safety-related on documents, procedures, and information
handling systems used in the plant to control safety-related activities,
including maintenance, work orders, and parts replacement. In addition, the
licensee was requested to describe their program for ensuring that all
components of other safety-related systems necessary for accomplishing
required safety functions are also identified as safety-related on informa-
tion handling systems used at the plant. The licensee's response to Sec-
tions 2.1 and 2.2 of GL 83-28 gives a detailed description of the program
and procedures for safety-related equipment classification. The inspector
reviewed their response, appropriate procedures, and interviewed responsible
licensee personnel to confirm that the licensee's program for equipment
classification was adequate and consistent with their response to GL 83-28.
The inspector examined the following procedures and documents:
Maintenance Procedure MP-03, Calibration of Process Instruments,
Revision 021
Maintenance Procedure MP-04, General Maintenance Procedure,
Revision 011
Maintenance Procedure MP-10, Preventive Maintenance Program,
Revision 025
Maintenance Procedure MP-14, Corrective Maintenance, Revision 029
Maintenance Procedure MP-16, Writing Corrective Maintenance
Instructions
Volume XI, Book 2 Q-List, Revisions 26 and 27
Engineering Procedure ENP-3, Plant Modification Procedure
Engineering Procedure ENP-3.1, Direct Part Replacement,
Revision 000,
Engineering Procedure ENP-12, Engineering Evaluation Procedure,
Revision 009
Administrative Procedure AI-25, Procurement of Noncompany Labor and
Services, Revision 008
Maintenance Instruction MI-10-19, C71/C72-K14A-G and C71/C72-K15A-D
Relay Inspection, Revision 001
f . .
.
6
Storekeeper Instruction SK-01, Material Requisition and Reorder
Procedures and Responsibilities, Revision 014
Brunswick Unit 2 Technical Specifications, Amendment 98
Work Requests and Authorizations Nos. 2-E-84-5771, 2-E-84-4926,
1-E-84-0082, 1-E-84-5751, 1-E-84-5755 and 1-E-84-5757
The inspector concluded through discussions with licensee personnel and by
review of the above procedures and documents that the licensee's program for
equipment classification included the following elements:
- Plant and component control for classification of structures, systems,
and components as safety-related were being implemented.
- The licensee has developed a program to assure that safety-related or
nonsafety-related maintenance activities are identified during the
planning stage.
- Personnel participating in activities impacting safety-related or
nonsafety-related structures, systems, and components were aware of the
appropriate level of QA controls.
- Written directives assigned principal responsibility for satisfactory
completion of procurement and maintenance activities associated with
safety-related structures, systems and components.
- Personnel performing activities impacting equipment on the safety
listing have received indoctrination and training.
-
Repairs to equipment to correct failures, malfunctions, deficiencies,
deviations, defective material, and nonconformances were performed,
documented, and reviewed to determine reliability of replacement
components.
Other details of the inspection are discussed below:
9
Volume XI, Book 2 of the Plant Operating Manual is the procedure used by the
licensee to determine the safety classification of structures, systems and
components at Brunswick units 1 and 2. The Q-list identifies, in tables,
the portions of systems, the instruments, and the special components of
systems which are safety-related (Q-list). The licensee uses the Q-list
procedure to identify those activities (such as maintenance, design and
procurement) which are considered safety-related and governed by the re-
quirements of the corporate Quality Assurance Program. The procedure does
not identify all safety-related components and sub-components; however, it
delineates general criteria for the proper classification of all safety-
related components and sub-components.
. -
- _ ___
. _
,_ - ._ .- - __ --
__= -__- _. - - .
. .
7
The Q-list is part of the Plant Operating Manual and is a controlled docu-
ment. It is the responsibility of the Q-List Group-Technical Support Unit
to maintain and revise the Q-List. Any revisions to the Q-List are required
to have a safety analysis, two-party technical and safety review and approv-
al by the Plant General Manager; however, in cases where an unreviewed
safety question exist, as defined in 10 CFR 50.59, approval is also required
by the Plant Nuclear Safety Committee prior to implementation. This is
delineated by Technical Specifications.
In addition to the Q-List procedure described above, the licensee is cur-
rently developing a computerized equipment data base (EDB) system that will
upgrade the Q-List. This EDB will be a detailed listing of components,
sub-components and parts. The licensee expects to have all safety-related
systems entered into the EDB by the end of July 1985 and all data fields
validated and classification determinations made on safety-related compo-
nents by December 1986.
The inspector discussed with cognizant licensee personnel their procedures
for processing work requests and authorizations, purchase requisitions,
purchase orders, and design modifications. Discussions with licensee
personnel in the Q-List Group revealed the following concerns:
a. The Q-List Group has been classifying as Q or Non-Q, piece parts of
major plant components and documenting the results of their evaluations
on three part memorandums. These evaluations are used by plant staff
in classifying as Q or non-Q replacement components on maintenance and
procurement requests; however, this evaluation is not procedurally
addressed by the licensee. The inspector informed the licensee that
the evaluations of piece parts could possibly effect the Q-List and
should be controlled by some procedure. The licensee acknowledged this
concern and committed to revise Volume XI, Book 2, Q-List to incorpo-
rate steps for processing component parts evaluations. The licensee
indicated that the procedure would require that each evaluation re-
ceives independent reviews and a safety evaluation prior to approval
and implementation.
b. Engineering procedure ENP-12 is the procedure used for upgrading parts
to Q-List. This procedure is also used to downgrade components identi-
fled in the Q-List. Procedure ENP-12 has a required distribution for
the completed evaluations. However, the completed Engineering Evalua-
tion Report is not routed to the Q-List Group who has responsibility
for revising the Q-List. The licensee indicated that although the
Q-List Group is not on the required distribution they have been receiv-
ing copies of Engineering Evaluation Reports. However, the licensee
indicated that procedure ENP-12 would be revised to include the Q-List
Group on the distribution list.
The above concerns were identified to the licensee as Inspector Followup
Item 325, 324/85-14-01, 0-List Program Changes.
<
. .
8
The inspector also reviewed records for six completed Work Requests and
Authorization Forms. The records were examined to verify that the work had
been properly classified per the Q-List, that all required reviews and
approvals were received prior to performing work, and that appropriate post
maintenance testing was conducted prior to returning the component back to
service.
The records reviewed are identified as follows:
WRAF System
2-E-84-5771 RPS
2-E-84-4926 RPS
1-E-84-0082 RPS
1-E-84-5751 CRD
1-E-84-5755 CRD
The records indicated that all reviews and approvals were received prior to
beginning work, forms were properly classified as Q-List, appropriate post
maintenance testing was conducted, and finally records were reviewed and
transferred to the storage facility.
Within the area examined, no violations or deviations were identified.
8. Vendor Interface and Manual Control
The inspector reviewed the licensee's response which described their program
for vendor interface and control of vendor technical information. Their
response described the following program:
CP&L is supporting the INP0 Nuclear Utility Task Action Committee
(NUTAC) on NRC Generic Letter 83-28, which is currently focusing on
industry-wide vendor information programs for safety-related equipment
vendors other than NSSS vendors. We believe this program will provide,
when implemented, a practical industry-wide approach to assuring
safety-related equipment reliability.
BSEP has in place a vendor interface program which provides for the
evaluation of vendor information associated with safety-related compo-
-
nents and the subsequent incorporation into plant instructions and
procedures as appropriate. The vendor interface process, in combina-
tion with other plant and industry programs, provides assurance of the
reliability of safety-related components commensurate with the safety
functions.
Existing vendor interface process features include:
- Control of vendor manuals supplied with original plant equipment and
with equipment installed as a result of design changes (RMI-01: Capture
and Indexing of Correspondence and Plant Records; and RMI-03: Reproduc-
tion, Distribution, and Accountability of Plant Documents).
. .
9
-- Use of vendor information in developing self-sufficient approved and
controlled technical maintenance instructions (MP-16; Writing Correc-
tive Maintenance Instructions).
- Evaluation of vendor recommendations (PPP-02; Vendor Recommendation
Processing).
In summary, the licensee states that the vendor interface processes and the
regulatory and industry notifications, in combination with BSEP's commitment
to equipment preventive maintenance, surveillance testing, equipment correc-
tive maintenance, and the quality assurance program, provide assurance of
safety-related component reliability. This obviates the need for develop-
ment of additional formal programs of periodic vendor contact or acknowl-
edgement of feedback for other than the NSSS vendor. For safety-related
equipment vendors who have gone out of business or will not supply informa-
tion, such formal vendor contact programs would serve no purpose. Thus, the
licensee does not plan to implement additional formal programs for periodic
vendor contact or acknowledgement of feedback for other than the NSSS
vendor. The licensee further states that the BSEP program provides assur-
ance of safety-related equipment reliability and cost-effective safety
enhancement.
The inspector reviewed licensee procedures, vendor manuals and other docu-
mentation and activities concerning safety-related components to determine
if adequate controls have been developed and are being implemented as
required by Technical Specifications, industry guides and standards,
regulatory requirements and CP&Ls response (dated November 7,1983) to
Generic Letter 83-28. The review revealed that the procedures were consis-
tent with the licensee's submittal. The following documents were reviewed
during this inspection:
PPP-002, Vendor Recomendation Processing, Revision 3, dated 9/19/84
RMI-003, Reproduction, Distribution, and Accountability of Plant
Documents, Revision 20, dated 1/16/85
MP-10, Preventive Maintenance Program, Revision 25, dated August 29,
1984 >
MP-16, Writing Corrective Maintenance Instructions, Revision 10, dated
May 2, 1984
MP-43, Maintenance Subunit Action / Commitment Items Tracking System,
Revision 0, dated January 25, 1984
AI-02, Feedback of Operating Experience, Revision 21, dated May 19,
1983
AI-25, Procurement of Noncompany Labor and Services, Revision 8, dated
March 22, 1985
'
. .
10
AI-72, Control / Approval of Vendor Technical Manuals, Revision 0, dated
May 5, 1985
AP-01, Administrative Procedures, Revision 94, dated May 7, 1985
01-25, Operations Action Items Tracking System, Revision 0, dated
January 25, 1984
ENP-20, Engineering Work Request (EWR), Revision 3, dated August 17,
1984
1985 Annual Vendor Recommendation Status Report, dated March 18, 1985,
BSEP 85-0256
Vendor Recommendation Status Report, dated May 7, 1985 BSEP 85-0885
BSEP SIL Report, dated April 23, 1985
BSEP SAL Report, dated April 23, 1985
BSEP FDI Status Report, dated April 23, 1985
Engineering Work Request 84-385 For GE SIL-407, Preventing
Unauthorized Control Rod Patterns, closed out on April 4, 1985
Engineering Work Request 83-136 For GE SIL-390, Modification of
Invessel Rack Cable Assemblies, closed out on December 13, 1983
Quarterly Component Failure Report - Failures Through the Third Quarter
1984, dated January 18, 1985
Quarterly Component Failure Report - Failures Through the Fourth
Quarter 1984
Through examination of the above documents, interviews with plant personnel
and observation of activities in progress, the inspector concluded that
vendor interface comitments expressed in the licensee's response to Generic
Letter 83-28 were being implemented and appear to be progressing satisfacto-
rily. In their response, the licensee estimated that completion of its
commitments would occur in the December 1985 timeframe. Based on the
progress observed and through various discussions with personnel responsible
for vendor interface activities, delays in fully implementing all commit-
ments by this time are not anticipated. The licensee has already responded
to and resolved the majority of General Electric (NSSS vendor) Service
Information Letters (SILs), Service Advice Letters (SALs). Technical Infor-
mation Letters (TILs) and Field Disposition Information (FDIs). It is the
licensee's intent to review and implement as necessary all applicable vendor
recommendations or provide justification for not implementing such
recommendations.
. .
11
All incoming vendor manuals and correspondence is screened and controlled by
the plant document control. A program has been established which alerts the
affected organizations that the vendor manuals have been revised and that
revisions to plant procedures and documents may be required. Department
tracking systems have been established to track the progress of required
action.
The inspector reviewed several vendor recommendations and manual revisions
and determined that the program was being implemented in accordance with
established procedures and commitments.
The inspector also reviewed licensee's progress in incorporating vendor
recommendations into maintenance procedures to verify that the licensee
would meet the estimated completion dates specified in Appendix C to their
response.
The licensee contracted with General Electric (GE) Company to secure and
evaluate vendor recommendations regarding testing and maintenance of safety
related components at Brunswick. In October 1984 GE mailed about 150
letters to Q-List vendors and received about 120 responses. This resulted
in a GE transmittal of five vendor recommendations to the licensee's docu-
ment control. The five vendor recommendations were held at licensee's
document control for about six weeks for no practical reason. During this
inspection the licensee's document control unit began to get ready to
transmit the five vendor recommendations to the appropriate disciplines for
review and incorporation into the maintenance procedures. At the exit
interview, the licensee responded that the six weeks delay was due to
impending issuance of Administrative Instruction AI-72, " Control / Approval of
Vendor Technical Manuals." The inspector noted that Revision 000 of AI-72
was issued on May 5,1985 and the licensee was on target with meeting their
commitment as stated in their response to GL 83-28.
Within the areas examined, no violations or deviations were identified.
9. Surveillance and Post-Maintenance Testing
a. Licensee's Procedures and Documents Reviewed
(1) Maintenance Procedure: MP-10, Preventive Maintenance Program,
Rev 025
(2) Maintenance Procedures: MP-14, Corrective Maintenance, Rev. 029
(3) Administrative Instruction: AI-33, Surveillance Test Cross
Reference to the Technical Specifications
(4) Engineering Procedure: ENP-16, Procedure for Administrative
Control of Inservice Inspection Activities
(5) Maintenance Surveillance Test: 2MST-RPS 24M, RPS Reactor Vessel
Low Water Level (LL1) Trip Unit Channel Calibration
r-
, ,
12
(6) Maintenance Instruction: MI-10-19, C71/C72-K14A-G and
C71/C72-K15A-D Relay Inspection, Rev. 001
(7) General Maintenance Procedure: MP-04, Rev. 011
(8) Administrative Instruction: Al-02, Feedback of Operating
Experience, Rev. 021
(9) Maintenance Procedure: MP-26, Loop Calibrations, Rev. 006
(10) Administrative Instruction: AI-25, Procurement of Noncompany
Labor and Services, Rev. 008
(11) Periodic Test: PT-01.1.10-1, Reactor Protection Logic System
Functional Test, Rev. 0
(12) Regulatory Compliance Instruction: RCI-02.5, Surveillance Test
Cross Reference to Technical Specifications, Rev. 6
(13) Administrative Procedures, Vol. I, Book 1, pages 1 & 2
(14) Administrative Instruction: AI-72, Control / Approval of Vendor
Technical Manuals, Rev. 000, dated May 5, 1985
(15) Records Management Instruction: RMI-3, Reproduction, Distri
bution, and Accountability of Plant Documents, Rev. 021,
dated April 30, 1985
b. Surveillance Testing
The inspector observed the performance of Maintenance Surveillance Test
No. 2MST-RPS 24M, RPS Reactor Vessel Low Water Level (LL1) Trip Unit
Channel Calibration. This procedure is performed on each Brunswick
unit on a monthly basis. The entire procedure is performed by two I&C
technicians and takes about two hours. The test simulates a low water
level signal to the Primary Containment Isolation System (PCIS) and
provides a half-scram signal to the Reactor Protection System (RPS)
logic. This is done on each of the four channels A1, B1, A2, and B2.
The test verifies the operability of the reactor vessel low water level
trip function of the PCIS and the RPS. The inspector noted that the
I&C technicians performing the test followed the procedure carefully,
and performed all the steps correctly. The inspector noted, however,
that the procedure 2MST-RPS 24M (M for monthly) was specifically
written for Unit 2 and that a corresponding procedure IMST-RPS 24M
would be used for Unit 1. The inspector noted that the unit designator
on all the panel alarm windows throughout the entire procedure was
,
omitted. To illustrate as an example, the inspector noted that para-
l graph 7.2.2.1 of 2MST-RPS 24M calls for the test technician to verify a
!
'
clear status on window (A-04 5-1). This would be Alarm Panel 04, row
5, column 1. However, the inspector noted that the actual designations
on the seven control room alarm panels themselves were different.
1
, - - - - - - ,- ,- - ,
4 - p a 4 4 , , a
. .
13
A comparison of the alarm panel designations is tabulated below:
On Panel On Procedure
Brunswick Unit 1 1-A-4 A-4
Brunswick Unit 2 2-A-4 A-04
There are two obvious inconsistencies:
(1) The unit designator "1" or "2" is shown in the panel version, but
it is not shown in the procedure version.
(2) Two digits are used to specify the Alarm Panel Number "04" in the
procedure version, whereas only one digit is used in the panel
version.
In the course of performing the entire MST procedure, the test techni-
cians went back and forth from the test area to the control room area
to verify the status of approximately 100 windows. The inspector
pointed out to the licensee that the discrepancies in the alarm panel
designations on the panel and in the procedure can lead to errors in
verification. This can be as a result of the large number of compari-
sons that have to be made.
The inspector conferred with the licensee's engineers responsible for
implementing the Maintenance Surveillance Test (MST) Procedure System.
The licensee's engineers' response was that they are in the process of
converting approximately 230 Periodic Test (pts) Procedures to approxi-
mately 400 MSTs. The plan is to delete most of the pts that were
written for Unit 0, which meant for both units 1 and 2. The MSTs would
be written for the same test: one for Unit 1 and the other for Unit 2.
On each page of the MST is printed the unit number. The lack of a unit
designator in the alarm panel designation was due to the decision to
follow the licensee's Writer's Guide for MST. Section 3.7.1, page
Al-12 of the Writer's Guide showed an example where the unit designa-
tors for valves were omitted in the procedure. This approach was
similarly applied to alarm panels on page Al-13. The end result was a
saving in having to repetitiously show the unit designator on all
equipment numbers.
c. Post-Maintenance Testing
(1) Review of Completed Work Packages
The inspector reviewed the licensee's maintenance and post-main-
tenance testing records. The inspector randomly selected six of
the licensee's Work Request and Authorization Forms (WRAF) and
reviewed all the infonnation and data in each work package. The
inspector found all the work packages complete, and all minor
discrepancies were adequately addressed by the licensec's person-
nel. The WRAFs audited by the inspector were as follows:
1
.. w
s
14
WRAF No. Description
(a) 2E-83-3709 MSL Rad Monitor D, Unit 2
No discrepancies were
identified.
(b) 1E-83-1334 RPS MG Set Output Breaker
No discrepancies were
identified.
(c) IM-83-1817 Core Spray System Valve Repack
No discrepancies were
identified.
(d) 1E-83-061 Replace Relay Coil
No discrepancies were
identified.
(e) 1E-82-3970 Electrical Support Work on
Valve Maintenance
The inspector noted that the Post Maintenance Testing Re-
quirement (PMTR) was signed off on 7-18-83 as satisfactory. ,
However, contradictory information was noted in the Job
Supplement Form of the WRAF. The Job Supplement Form stated
that the post maintenance test was unsatisfactory on the same
date: 7-18-83. The inspector questioned several licensee
personnel about this discrepancy and concluded that the entry
on the Job Supplement Fom, which stated that the -tests were
unsatisfactory, was made approximately four to five weeks
prior to the 7-18-83 date shown on the form. Apparently, the
valve in question was subjected to a series of test in early
June 1983 and the valve failed those tests. This led to
additional maintenance work and resulted in another series of
tests which culminated in the acceptance on 7-18-83. The
inspector pointed out to the licensee that the records
associated with this WRAF were not clear and can lead to
confusion unless time was spent fitting the pieces together.
'
(f) 2E-84-4365 Repair V120 Throttle Valve
The inspector noted that item #39 " Clearance Required" was
not checked off on the WRAF. The licensee responded that
this was an oversight, and submitted proof of adequate work
procedure on this WRAF.
(2) RPS Relay Inspection
The inspector participated in observing the licensee's I&C Group
performing a demonstration of RPS relay inspection using Mainte-
nance Instruction MI-10-19. The licensee's demonstration went
. .
15
well. However, there was an apparent typographical error in the
subject Maintenance Instruction MI-10-19. On page 1 of 5 in the
" References" section, the General Electric product information was
referred to as "GEH-2416C". A search of the licensee's Document
Control showed that the vault copy was a "GEH-2416B". Further
search by the licensee revealed that no revision "C" existed. The
licensee committed to have the error corrected in the next revi-
sion to Maintenance Instruction MI-10-19.
Within the areas examined, no violations or deviations were identified.
10. Surveillance Testing of the Diverse Reactor Trip Functions of the Reactor
Trip System
The licensee states in their response to GL 83-28 that on-line testing of
the Reactor Protection System is accomplished by periodic functional channel
tests, channel checks, and scram timing of control rods. The licensee also
states that on-line testing of the backup scram solenoid valves is not
possible without scramming the plant; however, testing of the backup scram
valves will be performed during each refueling outage. The inspector
confirred that the licensee's surveillance procedures PT-01.1.10-1/2 inde-
pendently test each backup scram solenoid valve once every 18 months while
the plant is shutdown.
Within the areas examined, no violations or deviations were identified.