Text

P 4

-s n

ot r a

+

f QUALITY ASSURANCE j

, PROCEDURE NUMBER:

19 Rev' 1

r

$' SMUD SACRAMENTO MUNIC PAL uTIUTY OtSTRICT ' EFFECTIVE DATE:

August 10, 1984 l

RANCHO SECo NuCL!AR GENERAT!NG STATION !

. l l APPROVED:

l

! MC Ibt.

j QUALITY ASSURANCE PROGRAM m m.. u m m.. u s CUR ED:

/

l SYSTEM AUDITING L Q y,,,, l y,,,,,,,

l

'j'

)

.l

{ PURPOSE: theoperation, maintenance,repairandmodificationoftheRancho; This procedure establishes and defthes the program for auditing Seco Nuclear Generating Station No.

1, l

?

GENERAL REQUIREMENTS:

j for auditing of the operating, maintenance, repair and modi 1.

The Management Safety Review Committee establishes a schedule fication of the generating plant.

i 2.

The Manager of Quality Assurance assigns the personnel to audit those activities necessary to provide confidence that the plant is operated and maintained in a satisfactory man-ner.

The audit personnel shall be trained and qualified in !

accordance with Section 2.2.2 of Quality Control Instruction i(s'-

(QCI) No. 2.

3.

Audits shall be performed on elements of the nuclear opera-tions by Quality Assqrance in conformance to 10CFR50, Appen-dix B; ANSI N18.7-1972, Administrative Controls for Nuclear Power Plants; and ANSI N45.2.12, Requirements for Auditing l

of Quality Assurance Programs for Nuclear Power Plants.

l 4.

Audits shall be conducted in accordance with the detailed instructions and schedules provided by Quality Control In-i struction No. 2.

i 5.

Each audit report shall' include the standard audit cover sheet (Figure 19-1) which shall include all applicable infor; l

mation.

l l

6.

Published audit findings shall be, as a minimum, distributed I

to the Executive Director, Nuclear; Managers of Quality Assur-l j

ance, Nuclear Operations, Nuclear Engineering; MSRC members;;

and the Quality Assurance Documentation Control Center (QA-DCC).

i 7

Audits defining Technical Specifications violations shall b e ',

j sent to PRC' members by filing an 00R.

8.

All organizations shall provide. prompt corrective action to rectify quality assurance inadequacies.

QCI No. 2 shall N

1g-1

1:a e

QUALITY ASSURANCE PROCEDURE NO. 19 specify those methods that will help to ensure that cor-rective actions are handled promptly.

9.

Followup audits shall be performed to determine the ade-quacy and effectiveness of the corrective actions,taken.

10.

The MSRC shall direct an independent audit of the Imple-mentation of the Quality Assurance Audit Program at least once per year.

11.

Auditors will review all QA surveillance reports applicable j

to the functional area being audited.

Pertinent surveil-lances will be included as part of the auoit report.

QUALITY ASSURANCE AUDIT PROGRAM The MSRC Quality Assurance Audit Program shall consist of the following four audit groups:

1.

Regular Quality Assurance Audits - All audits specifically identified on the. MSRC Quality Assurance Audit Program Schedule found in Attachment No. 1 of QCI NO. 2, other than I.

~ (A--

the Operational QA Program (MSRC Item # 5) and the Vendor Audit Program (MSRC #44) audits.

2.

Operational Quality Assurance Audits - Audits of confor-mance of facility operation to all provisions contained within the Technical Specifications and applicable license conditions at'least once per year.

3.

Vendor Audits - Audits directed by the Manager of Quality Assurance to verify the qualifications of vendors to pro-vide goods and/or services for Rancho Seco Nuclear Genera-ting Station Unit No.

1.

4 Special Audits - Audits specifically directed by the MSRC, Executive Director, Nuclear or the Manager of Quality Assurance which are separate from the audit groups listed above.

(

19-2 L-.

t a

a Audit No.

RANCHO SECO AUDIT REPORT Activity Checklist No.

Auditor (s)

Audit Date Distr. Cate Signature (s)

Response Oue Organizations Aucited:

Individuals Contacted:

i.

Audit Description and Comments:

Summary:

lk O

Corrective Action Requested:

Corrective Action Cometeted:

Manager, Quality Assurance Date ec:

J.J. MattimoeiR.J. Rodriguez;0.G. RaaschiR. Cclombo/L.R. KeilmaneR.P. Cubre'!J.V. McColligan/

R.A. Dieterichil.G. Schwieger'J.S. SullivansG.A. Cow arc!J. Field /N. BrocksR. Lawrenceio. Comstock/

R. Miller /S. CrunkiS. Recexer swo.e. o s.

l Figure 19-1 m___

.