Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L436 + (ML20127L436)
- ML20127L438 + (ML20127L438)
- ML20127L440 + (ML20127L440)
- ML20127L441 + (ML20127L441)
- ML20127L443 + (ML20127L443)
- ML20127L444 + (ML20127L444)
- IR 05000321/1985002 + (ML20127L445)
- ML20127L447 + (ML20127L447)
- ML20127L448 + (ML20127L448)
- ML20127L449 + (ML20127L449)
- ML20127L450 + (ML20127L450)
- ML20127L451 + (ML20127L451)
- ML20127L452 + (ML20127L452)
- A04919, Responds to NRC Re Violations Noted in Insp Rept 50-213/85-08.Corrective Actions:Review Conducted to Ensure Environ Review Board Audits Subsequent to 1983 Complete + (ML20127L453)
- ML20127L454 + (ML20127L454)
- IR 05000285/1985002 + (ML20127L455)
- 05000412/LER-1992-013, :on 931223,identified SG Blowdown Isolation Due to SG Blowdown Tank High Level.Sg Blowdown Sys Demineralizer Outlet Filter Cleaned + (ML20127L456)
- ML20127L457 + (ML20127L457)
- ML20127L458 + (ML20127L458)
- ML20127L459 + (ML20127L459)
- ML20127L460 + (ML20127L460)
- ML20127L461 + (ML20127L461)
- ML20127L462 + (ML20127L462)
- 05000443/LER-1992-013-01, Forwards LER 92-013-01 Re Tornado Design of Plant Doors. Submittal Documents Root Cause & Corrective Actions Ongoing at Time of LER 92-013-00 Submittal + (ML20127L463)
- BSEP-92-0063, Responds to Request for Addl Info Re Hotside & Coldside Walkdowns & Mgt Actions Re Documented Instruction or Procedure in Connection W/Previous Response to NOV Re Insp Repts 50-324/92-27 & 50-325/92-27 + (ML20127L464)
- ML20127L465 + (ML20127L465)
- ML20127L466 + (ML20127L466)
- ML20127L467 + (ML20127L467)
- ML20127L468 + (ML20127L468)
- ML20127L469 + (ML20127L469)
- 05000443/LER-1992-013, :on 920827,determined That Six Plant Doors Did Not Have Tornado Design to Withstand Differential Pressure, Per Updated Fsar.Caused by Failure to Include Doors in United Engineers & Constructors Spec.Updated FSAR Revised + (ML20127L470)
- ML20127L471 + (ML20127L471)
- ML20127L472 + (ML20127L472)
- ML20127L473 + (ML20127L473)
- 05000423/LER-1992-024-01, :on 921015,ESF Bldg Normal Ventilation Radiation Monitor Declared Inoperable & Temporary Sample Rig Installed.On 921015 & 16,breaker Tripped Open.Caused by Inadequate Installation.Breaker Reset + (ML20127L475)
- ML20127L478 + (ML20127L478)
- 05000354/LER-1992-012-02, :on 921017,RM Skid Declared Inoperable Due to Low Sample Flow Indication on Particulate,Iodine & Noble Gas Monitor Portion of Skid.Caused by Design Deficiency.Design Review of RMS Skid Will Be Performed + (ML20127L479)
- 3F0193-08, Responds to NRC Ltr Re Weaknesses Noted in Insp Rept 50-302/92-26.Corrective Action:Lesson Plan for Emergency Coordinator Training Has Been Revised to Include Review of 1992 Exercise Deficiencies + (ML20127L480)
- ML20127L481 + (ML20127L481)
- ML20127L482 + (ML20127L482)
- 05000445/LER-1992-024, :on 921022,determined That Surveillance for Containment post-accident Water Level Instrumentation Did Not Include Check of Level Sensors.Caused by Personnel Error.Vendor Manual Will Be Amended + (ML20127L483)
- ML20127L484 + (ML20127L484)
- ML20127L486 + (ML20127L486)
- ML20127L487 + (ML20127L487)
- ML20127L489 + (ML20127L489)
- 05000368/LER-1992-007, :on 920923,discovered That Flow Rates Through HPSI Legs Unbalanced & Below Min TS Value.Caused by Vendor (Target Rock) Error.Eight Stock Disc Plus Reworked & Refurbished Discs Installed in HPSI Valves + (ML20127L490)
- ML20127L491 + (ML20127L491)
- ELV-05102, Forwards Responses to NRC 921203 RAI Re Util 920917 License Amend Request Associated W/Implementation of New 10CFR20 Requirements & Revised Proposed TS Associated W/Responses + (ML20127L492)
- ML20127L493 + (ML20127L493)
- ML20127L494 + (ML20127L494)
- ML20127L495 + (ML20127L495)