Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L008 + (ML20127L008)
- ML20127L009 + (ML20127L009)
- IR 05000424/1985015 + (ML20127L010)
- ML20127L011 + (ML20127L011)
- ML20127L013 + (ML20127L013)
- ML20127L014 + (ML20127L014)
- ML20127L015 + (ML20127L015)
- AECM-85-0121, Advises That Need for Addl Relief Requests & Mods to Spec Mp&L M-189.1,Rev 0 Re Pump & Valve Inservice Testing Program Identified.Forwards Complete Package of All Relief Requests Desired + (ML20127L016)
- ML20127L018 + (ML20127L018)
- ML20127L019 + (ML20127L019)
- ML20127L021 + (ML20127L021)
- ML20127L023 + (ML20127L023)
- ML20127L024 + (ML20127L024)
- ML20127L025 + (ML20127L025)
- ML20127L027 + (ML20127L027)
- ML20127L028 + (ML20127L028)
- B14354, Forwards Addl Info in Support of 930115 Application for Amend to License NPF-49,changing TS to Revise SR Frequency for Functional Tests of Snubbers by Allowing one-time Extension to Current 18-month Surveillance Interval + (ML20127L030)
- ML20127L031 + (ML20127L031)
- ML20127L032 + (ML20127L032)
- ML20127L035 + (ML20127L035)
- IA-92-445, Forwards Draft of Proposed Objectives for NRC Continuing Dialogue W/Natl Assoc of Regulatory Utility Commissioners + (ML20127L035)
- ML20127L036 + (ML20127L036)
- ML20127L039 + (ML20127L039)
- 05000250/LER-1985-011, :on 850406,while in Refueling Shutdown,Two safety-related Snubbers Inside Containment on RCS Pressurizer Spray & Relief Line Removed Before Inservice Insp Could Be Performed + (ML20127L040)
- ML20127L042 + (ML20127L042)
- ML20127L044 + (ML20127L044)
- ML20127L045 + (ML20127L045)
- ML20127L046 + (ML20127L046)
- ML20127L048 + (ML20127L048)
- ML20127L049 + (ML20127L049)
- ML20127L050 + (ML20127L050)
- B14351, Forwards Special Procedure 93-1-01,Rev 0, Bypassing Main Steam Line Radiation Detectors While Placing Condensate Demineralizers in Svc Following URC, Per 930113 & 14 Telcons W/Nrc Re 930112 TS Change Request + (ML20127L053)
- ML20127L054 + (ML20127L054)
- 05000315/LER-1985-016, :on 850412,w/RCS in Mode 3,vent Inside Containment Opened to Drain Header & Vent Outside Containment Opened to Drain Hxs,Creating Flow Path from Inside to Outside Containment.Procedure Revised + (ML20127L055)
- ML20127L056 + (ML20127L056)
- ML20127L057 + (ML20127L057)
- ML20127L059 + (ML20127L059)
- ML20127L063 + (ML20127L063)
- 05000423/LER-1992-032, :on 921219,channel Check of Process Flow Monitor for Ventilation Vent Radiation Monitor Improperly Completed Due to Inattention to Detail by Operator.C/A Included Counselling Shift Operators + (ML20127L064)
- ML20127L066 + (ML20127L066)
- ML20127L067 + (ML20127L067)
- IR 05000321/1985013 + (ML20127L068)
- ML20127L071 + (ML20127L071)
- ML20127L072 + (ML20127L072)
- ML20127L075 + (ML20127L075)
- ML20127L076 + (ML20127L076)
- ML20127L077 + (ML20127L077)
- ML20127L078 + (ML20127L078)
- 05000237/LER-1985-017-03, :on 850413,during Startup,Reactor Water Samples Not Taken Every 4 H.Caused by Misunderstanding Between Personnel.Personnel Briefed on Importance of Providing & Following Specific Instructions During Startup + (ML20127L079)
- ML20127L080 + (ML20127L080)
- ML20127L081 + (ML20127L081)