Text
A
.
.
MAY 2 31985
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT NOS. 50-321/85-13 AND 50-366/85-13
On April 29 - May 3,1985, NRC inspected activities authorized by NRC Operating
License No. DPR-57 and NRC License No. NPF-5 for your Hatch facility. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should ycu have any questions concerning this letter, please contact us.
Sincerely,
$
Virg"1 L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-321/85-13
and 50-366/85-13
cc w/ enc 1:
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
H. C. Nix, Site General Manager
P. E. Fornel, Site QA Supervisor
L. Gucwa, Chief, Nuclear Engineer
bec w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
RII)fh
RII()%
,
'
WRosYfsa
ake
ARHerdt
05//7 /85
!;/Ji /85
05/p /85
8 }
'
8506270725 850523
ADOCK 050
1
gDR