ML20127L019
| ML20127L019 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/21/1993 |
| From: | Shelton D CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 2111, NUDOCS 9301260311 | |
| Download: ML20127L019 (5) | |
Text
.-
M
-ENE.GY Donald C. Shelton 300 Madison Avenue -
Vice President Nuclear Toledo, OH 43652G01 DavwBesse (419)249-2300 i-
{
Docket Number 50-346 License Number NPF-3
-Serial Number 2111 January 21, 1993 t
United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.
20555 i
~
Subj ect:
Semiannual-Fitness-For-Duty Report
-July - December 1992 Gentlemen:
j Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison hereby submits its Semiannual Fitness-For-Duty (FFD) report.for the period of July - December 1992 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance. Data.
The data form is an industry standard developed by Nuclear Management I
_and Resources Council to provide the information required by 10 CFR-26.71(d). Attach.aent 2 provides a summary of management actions _taken by Toledo Edison based on positive-FFD results, presumptive positivesi and a list of FFD event reports submitted by Toledo Edison.
If you have any questions, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366-.
Very t
- yours, (6tw W
-GAB /dle L.
attachments i
l
_cc:
A. B; Davis, Regional Administrator, NRC Region-III J. B. Ilopkins, NRC/NRR DB-1 Senior. Project Manager S. Stasek, NRC Region _III, DB-1 Senior. Resident Inspector Utility Radiological Safety Board-
-9301260311 930121' -
M
~
=
PDR ADOCK-05000364~
\\g -
g OperatingCompo es:.
250123 I
' Cloverond Electne mummotmg
- Toledo Edison
Docket Number 50-346 License Number NPF-3 Shrial Number 2111 Toledo Edison's Fitness-For-Duty Report July - December 1992 i
. Docket Number 50-346 License Number NPF-3 Serial Number 2111 Fitness for Duty Program.
-Performance Data Personnel Subject to 10CFR 26 Toledo Edison December 31. 1997 comoany a h Energ Davis-Besse Locanon Robert W.
Mehrauder
(&14) 944-9166 ConM Nam Phone (6nende eros code)
Cutoff s: Screen / Confirmation (ng/ml)
O ' Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 / 500
/
Cocaine Phencyclidine 25 / 25
/
300 150
~
Opiates 300 / 300 Alcohol (% BAC) 0.04
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contr::ctor Personnel Average Number witt.
Unescorted Access 1191 166 Categories Tested Positive Tested Positive Tested Positive Pre-Access 50 0
63 0
[
Post accident 16 0
0 0
9 Observec oehavior 1
1
-1 0
Random 672 0
39 0
Follow up -
11 0
0 0
Other 105 0
0 0
Total 855 1
103 0
n e
i T
I t
6 e
E f
A 1
9 O
5 4
3 2
1 lats s e uT fe o Rt lo s
h e
o i
0 1
c lc n
A a
t s
-ye b
c n u
ni eid o
0 0
S hl Pc c
if i
- s c
e e h n e
pi p
mm o
0 0
a S
At r
o f
se s
ia 0
t ts p
o 0
e O
T e
en v
i ia o
0 0
t c
i o
s
.C oP a
n d
a e
u 0
j ir o
0 m
.a r
.M ifn s
s o
r r
s o
o C
e c
c t
t f
e a
a r
y r
o o
n n
t t
n lp o
o r
C C
w r
o m
m E
r e
r d
e e
e k
s T-T-
n g
t l
a r
e n
o a
e ic o
h o
t r
L L
S T
B
Docket Number 50-346 License Number NPF-3
- Serial Number 2111-Attachment.2 Page 1-
- 1 TOLEDO EDISON'S MANAGEMENT ACTIONS
-RELATING TO FITNESS-FOR-DUTY Toledo Edison Contractor Personnel Personnel Referred to EAP 1
0 Management Sanctions 1
0 Toledo Edison does not perform onsite initial drug screening test.
Therefore, no management actions on unconfirmed presumptive positive result from drug testing.
TOLEDO EDISCN'S FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (July - December 1992)
..,., ~., -. -.
..n
.