ML20127L071
| ML20127L071 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/04/1975 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | OFFICE OF THE FEDERAL REGISTER |
| References | |
| NUDOCS 9211230414 | |
| Download: ML20127L071 (1) | |
Text
'
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINCToN. o. C. 20585 November 4, 1975,
)FFICE eF THE SECRET ARY Director Office of the Federal Register FJ National Archives and Records Service Washington, D. C.
20408 Dear Sir Enclosed for publication in the Federal Register are an original cnd two certified copies of a document entitled:
NORTIIERN STATES POITER Col!PANY Docket No. 50-263 NOTICE OF ISSUANCE OF AMEND!iENT TO PROVISIONAL OPERATING LICENSE AND NEGATIVE DECLARATION Please publish these two (2) notices concurrently.
Publication of the above document at the earliest possible date would be oppreciated.
Sincerely, 1
Samuel J. Chilk Secretary of the Commission
Enclosures:
Original and 2 certified copies i
bcct central Files
<3V m Information Services Legal Director Office of Congressional Affairs
.0GC
,pwiso&
SECY Files ~
Ih,)1230414751104 tifg.g1c ADOCK 05000263 p
~. - - -. _ -.
i i
U.':11Eli STATES '?uct EA't IU GUI NFORY COGISS10" D3CiliT NO. 50-263 NORTIIERN STATES POKER COMPANY NOTICE OF ISSUN:CE OF MHiSD'GNT TO PROVISTO'AL OPDIATI :G LICENSE Notice is hereby given that the U. S. Nuclear Regulatory-Commission-(the Come.ission) has issued Amendaent No.14 to Provisional Operating License No. DPR-22,--issued to I:orthern States Power Company (the:]icensee),
which revised Technical Specifications for operation of the Monticello Nuclear Generating Plant (the facility) located in liright County, Minnesota. The amendment is effective as of its date of issuance.
The amendment revises the provisions in the Technical Specifications for the facility to authorize operation (1) with additional S x 8 fuel assemblics, (2) using modified operating limits based upon an evaluation of emergency core cooling system performance calculated in accordance with an acceptable evaluation model that conforms to the requirements of l
Section 50.46 of 10 CFR Part 50 of the Commission's regulations, and (3) using operating limits based on' the General Electric Thermal Analysis-Basis (GETAD).
The applications for the amendment comply with the standards and requirements of the A_tomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appro-priate findings as required by the Act'and the Commission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment.
Notice of Proposed Issuance of Amendment to Facility Operating License in cor.nection with items (1) and (2) above was published n :
, / (Q
() ! n 7f V (~ V l L) V J v t
a n-
~. _ _ _ -,
. in th TFDEPat !!!11STr.n ou <cp!
- r 3, 1!)?5 (M !.R. 40592) nnJ Notico of Proposed 1snowe of AnchdNnt to Facility Operating License in connection with item (3) chse was -published in the FEDERAL REGISTER on April 27,1975 (40 F.R.18019).
No request for a hearing or pet ition for leave to intervene was filed follouing notiecn of the proposed actions.
For further det ails with respect to this" action, see (1) the applications for t.nenduent dat ed Shrch - 12, 1975 anJ August 4, 1975 and supp; rtive filings related t heret o-dated August - 20, 1974, July 9,1975, July 10 and 24, 1975, and Septenber 16, 1975, (2) Amendrnent No.14 to
. License No.-DPR-22,.with Change No. 22, (3) the Conmission's concurrently issued related Safety Evaluation, and (4) the Commission's-Negative Declaration dated October 23,1975 (which is also bein:.; publisned in the FEDERAL REGISTER), and the associated Environmental Irpact Appraisal.
All of these items are available for public inspection at the Com:aissien's Public Document Room, 1717 H Street, N.
K., Kashington, D.
C., and at the Environmental Conservation Library,1:inneapolis Public _ Library, 300 l
Nicollet Mall, Minneapolis,?!innesota-55401.
A single copy of items (2),_- (3) _ and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington,.D. C.
20555, Attention:
Director, Division of Reactor Licensing.
Dated at Bethesda, Maryland,- this 30th day of October,1975.
I-OR TIIE :NUCLEAPg REGULATORY CO3 MISSION J<-
, WWAW
.O*vvw A.
)
Dennis L. Eicmann,tthief Operating Reactors' branch #2 Division of Reactor Licensing-I l-
)
i a
.c.
n, -., -,
, 4 L, i.,,, r
..n-nn,
.., e n n,
..w,
-,.rwi,..,,-
-,v
.,, n. n -
f;EG/.TIVEIQL/& TION REGARDiiiG PROPOSED CH/dGES TO THE
_ TECHNICAL _5f,ECIFICliT10(:f 0F l.ICfD)E DPR _2j, it0NTICELLO UNIT 1 DOCKET i:0. 50-263 The fluclear Regulctory Cormission (the Commission) has considered
~
the issuance of change to the Technical Specifications of Provisional Operating License flo. CPR-22.
These changes would authorize the llorthern States Power Company (the _ licensee) to operate lionticello
!!uclear Generating Plant, Unit 1 (located in !!right County, flinnesota) with changes to the liniting conditions for operation resulting from application of the Acceptance Criteria for Emergency Core Cooling Systea, (ECCS).
This change is being rede in conjunction with core changeout liumber 5 and refueling with 8 x 8 fuel.
The U. S. fluclear Regulatory Comission, Division of Reactor Licensing, has prepared an environmental impact appraisal for the pro-posed changes to the Technical Specifications of License flo. DPR-22, Monticello, Unit 1, referred to above.
On the basis of this appraisal, the Commission has concluded that an environmental impact statement for the particular action is not warranted because there will be no environ-mental impact attributable to the proposed action other than that which has already _been predicted and described in the Con:nission's Final s
Environmental Statement for fionticello, Unit 1, issued in flovember 1972.
The environmental impact appraisal is available.for public inspection at l
-ocy?
. Q : i>
}
i
,, -, - ~, -,,, - -,
,----~n
,- - ~
w,
- e me-
2, the Comiission's l'ublic Doctrent Rovi,1717 H Street fl. '.
ahington, D.C.
and at the Envis onnentel 0;ncervation L.ibrary of liinnesota. 300 IP; collet fla11, l'inneapolit, l'iroiewic.
Dated at Rockville, thiyland, thir. 23r 1 day of Oct ober, I ti?T.
TO:( 11 r inlCLl'AR hlCULATO':Y 00"/115S10:1 l
l 1
Jan A l' orris, Acting Chief Environmental Projects P, ranch 4 Division of Reactor Licensing 1
f t
i f
e l--