Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127J215 + (ML20127J215)
- ML20127J219 + (ML20127J219)
- ML20127J221 + (ML20127J221)
- ML20127J223 + (ML20127J223)
- ML20127J225 + (ML20127J225)
- B14345, Forwards Addl Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity,10CFR50.54(f), in Connection W/Telephone Discussion Held on 930113 W/Nrc Related to Upper Shelf Energy of Plant Reactor Vessel + (ML20127J227)
- ML20127J228 + (ML20127J228)
- ML20127J229 + (ML20127J229)
- ML20127J230 + (ML20127J230)
- ML20127J233 + (ML20127J233)
- ML20127J234 + (ML20127J234)
- ML20127J235 + (ML20127J235)
- ML20127J236 + (ML20127J236)
- ML20127J238 + (ML20127J238)
- ML20127J241 + (ML20127J241)
- ML20127J243 + (ML20127J243)
- ML20127J245 + (ML20127J245)
- ML20127J246 + (ML20127J246)
- ML20127J247 + (ML20127J247)
- ML20127J248 + (ML20127J248)
- 05000327/LER-1985-019, :on 850524,design Review Revealed That During Seismic event,1-inch Demineralized Water Pipe & High Pressure Fire Protection Header Could Have Failed. Demineralized Water Pipe Isolated for Repair + (ML20127J249)
- ML20127J251 + (ML20127J251)
- ML20127J252 + (ML20127J252)
- ML20127J254 + (ML20127J254)
- ML20127J255 + (ML20127J255)
- W3P85-1290, Forwards marked-up FSAR Page 14.2-136,reflecting Changes to Initial Test Program,Test Subsection 14.2.12.3.31, Control Sys Checkout. Change Deletes 20% Reactor Power Level Test + (ML20127J256)
- ML20127J257 + (ML20127J257)
- IA-92-460, Final Response to FOIA Request for Documents.Informs That NRC Div of Contracts & Property Mgt Does Not Anticipate Awarding Contract for Solicitation Until Late Oct 1992 + (ML20127J257)
- ML20127J258 + (ML20127J258)
- 05000397/LER-1985-035, :on 850531,diesel Fuel Oil Supply Line on Engine 1 Developed Leak & Diesel Manually Shut Down by Operator.Caused by Broken Copper Tubing in Fuel Line.Faulty Line Replaced & Other Fuel Oil Lines Inspected + (ML20127J259)
- ML20127J262 + (ML20127J262)
- ML20127J263 + (ML20127J263)
- ML20127J264 + (ML20127J264)
- ML20127J265 + (ML20127J265)
- ML20127J266 + (ML20127J266)
- ML20127J268 + (ML20127J268)
- ML20127J269 + (ML20127J269)
- ML20127J270 + (ML20127J270)
- ML20127J271 + (ML20127J271)
- ML20127J273 + (ML20127J273)
- ML20127J275 + (ML20127J275)
- ML20127J276 + (ML20127J276)
- ML20127J277 + (ML20127J277)
- ML20127J278 + (ML20127J278)
- ML20127J279 + (ML20127J279)
- ML20127J280 + (ML20127J280)
- ML20127J281 + (ML20127J281)
- ML20127J282 + (ML20127J282)
- ML20127J284 + (ML20127J284)
- ML20127J285 + (ML20127J285)
- SNRC-1181, Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD + (ML20127J288)
- ML20127J291 + (ML20127J291)