Text
bnM a
.I t t THE CLEVELAND ELECTR P.O BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622 9600 - ILLUMIN ATING BLDG.
- 55 PUBLICSQUARE Serving The Best Location in the Nation June 13, 1985 MUMMY R. EDRMAN PY-CEI/OIE-0064 L vice mesiomi NUC LE AR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Reinforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Topaz Class IE Inverters RDC [120(84)]
Dear Mr. Keppler:
This letter serves as an update on the status of corrective actions delineated by our final report filed February 7 and April 9, 1985, pursuant to 10CFR50.55(e) concerning Class IE inverters manufactured by Topaz which are utilized in various control panels supplied by General Electric (GE).
Although further delays were experienced as a result of testing, our efforts to readjust the upper and lower voltage setpoints have been completed.
Therefore, all of the Topaz inverters in-stalled in Unit 1 and common have been properly calibrated per FDI-WO3W.
We are currently in the process of ensuring account-ability for the GE supplied spare Topaz Inverters, in order to complete work on FDI-WOBW.
Project Organization personnel will then re-review the associated documentation prior to submittal to GE for closure.
When GE has closed the FDI, the documentation will be made available for NRC review.
Please call if there are any questions.
Sincerely, 4L
[
Murray
. Edelman Vice President Nuclear Group MRE:sab 62%h p
s JUN 171935 TF5L 4 7
Nr. Jcme3 G. KOpplor Juno 13, 1985 PY-CEI/OIE-0064 L cc Mr. J. Grobe USNRC Site Office, SBB50 Mr. D. E. Keating USNRC Site Office, SBB50 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339