ML20127J221

From kanterella
Jump to navigation Jump to search
Safety Evaluation Supporting Amends 38 & 30 to Licenses DPR-77 & DPR-79,respectively
ML20127J221
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/11/1985
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127J220 List:
References
NUDOCS 8506260514
Download: ML20127J221 (3)


Text

.-

[

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION

+

RELATED TO AMENDMENT NO. 38 TO FACILITY OPERATING LICENSE DPR-77 AND AMENDMENT N0. 30 TO FACILITY OPERATING LICENSE DPR-79 TENNESSEE VALLEY AUTHORITY INTRODUCTION The Tennessee Valley Authority (the licensee) has filed with the Nuclear Regula-tory Consnission a request to amend Facility Operating Licenses DPR-77 and DPR-79.

The amendment would approve a revision to the licensee's physical security plan entitled, "Sequoyah Nuclear Plant Physical Security Plan."

DISCUSSION By letters dated June 13 and October 2, 1984, and March 11 and March 27, 1985, the licensee submitted for staff review a revision to the Sequoyah Nuclear Plant Physical Security Plan involving a major reduction in the size of the site's protected area. The stated purposes for the change are (i) to shorten the length of the perimeter boundary required to be alarmed and monitored, and (ii) to exclude from the protected area plant workers who normally do not have a need for access to safety-related equipment.

10 CFR 73.55 requires that vital equipment be located within a vital area which, in turn, has to be located within a protected area so that access to the vital equipment requires the passage through at least two physical barriers.

The physical barrier at the perimeter of the protected area is to be provided with isolation zones on both sides and a means for detecting unauthorized penetrations. Other than as stated above, there are no requirements or guidance relative to the size of a protected area or the extent to which non-vital equip-ment should or should not be within the protected boundary. The currently-approved plan for Sequoyah has included, in the protected area, all vital equipment and, in addition, many electrical, mechanical and administrative activities that are not safety-related.

The licensee is proposing to reduce the size of the protected area so as to encompass only the power block and the emergency diesel buildings and to exclude the turbine and administration buildings, the 161 KV and 500 KV switchyards, warehouses, the main pumping station, and the area between the reactor buildings and the emergency raw cooling water (ERCW) pumping station.

The proposal also includes replacing the existing perimeter intrusion detection system with a combination of fence disturbance detectors and manned guard towers located along the protected area fence line.

EVALUATION None of the buildings, areas or activities excluded from the protected area contain vital equipment (the ERCW pumping station will be located within a QSh$

f P

. separate protected area). The shortening of the alarmed perimeter (by more than 1/2) should facilitate assessment of and response to intrusion alarms or attempted intrusions.

Similarly, the reduction in the size of the protected area (by about 2/3) should reduce the effort needed to effectively monitor the exterior areas as required by regulations.

On the other hand, the distance between the prott. ted and vital area barriers is now shorter, thereby placing additional demands on the armed response force's capability to interdict pene-trations of the perimeter.

This need has been satisfied to some extent by the tactical placement of the manned guard towers.

There is also an indirect benefit to be gained from the fewer number of alarmed zones being employed that should result in correspondingly fewer zones being out-of-service from equip-ment malfunction.

The licensee also states that the number of workers permitted access into the protected area would be significantly reduced.

It is not clear what safeguards benefit this would have since in either case access to vital equipment would be limited to individuals having a work-related need.

Excluding the turbine building from the protected area results in the perimeter line coinciding with the interface between the control and turbine buildings (inside the structures).

In this plane a Seismic Category I interior wall performs the function of both a protected and vital area barrier.

This is permitted by 10 CFR 73.55(a) since the penetration resistance of a reinforced concrete, seismically designed wall is considered to equal or exceed that intended by the dual barrier requirements of the regulations.

At this location detection of penetration is provided by routine surveillance measures that would detect activity long before a break could be effected.

Openings through this common barrier leading into a vital area are double-barriered and double-alarmed electronically.

Part 73 does not address protection requirements for vital intake structures, such as the Sequoyah ERCW pumping station, located apart from the main reactor complex.

Staff practice, which has been applied in the past at several other l

facilities, requires an alarmed protected area barrier (except that Seismic I reinforced concrete walls are pennitted to serve as a dual barrier), increased hardening of access doors leading into the structure, a means for imediate, l

remote alarm assessment, special procedures for work-related access, and in l

certain instances depending on local conditions an armed response force l

stationed at the main site but dedicated to the protection of the intake struc-ture.

The licensee's proposal contains all of these elements.

The staff finds this to be acceptable.

The proposed perimeter intrusion detection system as described in the licensee's l

letter dated June 13, 1984, has not been approved by the staff since guidance l

published in Regulatory Guide 5.44 does not permit the use of fence disturbance l

.o.

.- sensors as primary intrusion detectors, and the licensee has not provided data that demonstrate the effectiveness of the conjoined system.

By letter dated March 27,1985, the licensee has agreed to apply approved compensatory measures to make the system acceptable to the staff.

Because the March 27, 1985, l e t.ter revised the original request, a notice was published in the Federal Register _ on April 26, 1980, describing the changes.

The licensee has agreed to provide additional operational and test data to support their initial proposal of June 13, 1984, for the perimeter intrusion detection system. The staff will evaluate these data and those from other sources to detennine the adequacy of the initially proposed system.

If the staff determines that the data justify the use of the system as proposed, it will so advise the licensee and allow the licensee to remove the compensatory measures.

If the staff determines that the data do not justify the use of the system as proposed, it will so advise the licensee and require the licensee to provide an acceptable system.

The staff concludes that the revised security plan with the approved compensa-tory measures as discussed above continues to satisfy the requirements of 10 CFR 73.55.

ENVIRONMENTAL CONSIDERATION These amendments relate solely to safeguards matters and do not involve any I

significant construction impacts.

Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(12).

Pursuant to 10 CFR 50.22(b), no environmental assessment need be prepared in connection with the issuance of the amendments.

CONCLUSION The Commission made a proposed determination that the amendments involve no significant hazards consideration which was published in the Federal Register (49 FR 36947) on September 20, 1984, and (50 FR 16574) on April 26, 1985, and consulted with the state of Tennessee.

No public cements were received, and the state of Tennessee did not have any comments.

We have concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributors:

E. McPeek, Standardization & Special Projects Branch, DL C. Stahle, Licensing Branch No. 4, DL C. Gaskin, Power Reactor Safeguards Licensing Branch, NMSS Dated: June 11, 1985 i

.__ _