- 05000285/LER-1992-027, :on 920817,determined That Open Stop Valve Between Regenerative Heat Exchanger & CH-202 Did Not Conform to Code Requirements.Caused by Inadequate Design Review. Plant Procedures Will Be Reviewed & Revised + (ML20118A600)
- JPN-92-049, Withdraws 910419 Application for Amend to License DPR-59, Changing TS to Add Operability & SR for HVAC Equipment Associated W/Four Environ Encls.Analyses & Mods Initiated to Allow post-accident Qualification of Load Ctrs + (ML20118A602)
- 3F0922-09, Requests That NRC Review Findings in Insp Rept 50-302/92-201 Re Insp of Procurement & commercial-grade Dedication Programs,In Light of NRC Mgt Direction,Per 920813 Meeting. Updated Technical Assessment & Viewgraphs Encl + (ML20118A604)
- 05000423/LER-1992-019-01, :on 920818,determined That Trains a & B of Hydrogen Recombiner Sys Had Been Inoperable Between 920812 & 17 & Train a Positive Displacement Blower Motor Found W/ Lifted Lead Due to Personnel Error + (ML20118A607)
- 05000454/LER-1992-007-09, :on 920727,discovered Nonconservative Method Used to Calculate Shutdown Margin.On 920818,determined That TS 3.1.1.1 Not Met for Surveillance Performed on 900211. Caused by Procedural Flaw.Procedure Revised + (ML20118A608)
- ML20118A609 + (ML20118A609)
- ML20118A612 + (ML20118A612)
- ML20118A613 + (ML20118A613)
- ML20118A615 + (ML20118A615)
- 05000336/LER-1992-015-01, :on 920821,determined That SPEC 200 Cabinets Mfg by Foxboro Co May Not Be Seismically Qualified as Result of Missing Bumpers.Caused by Lack of Vendor Instruction.Seismic Bumpers Ordered + (ML20118A618)
- 05000325/LER-1992-019, :on 920821,safety Relief Valves Tested at Wyle Laboratories Exceeded TS Limit Due to Pilot disc-to-seat Bonding.Srv Pilots Will Be Recertified Prior to Startup of Units 1 & 2 + (ML20118A619)
- ML20118A622 + (ML20118A622)
- ML20118A623 + (ML20118A623)
- ML20118A625 + (ML20118A625)
- NRC-92-0101, Monthly Operating Rept for Aug 1992 for Fermi 2 + (ML20118A627)
- ML20118A629 + (ML20118A629)
- ML20118A631 + (ML20118A631)
- RBG-37494, Updates 891027 Initial Response to GL 88-20 Re IPE, Consisting of Revised Completion Dates for Milestones.Level 1 & 2 IPE Submittals,Per GL 88-20,Suppls 1,2 & 3,will Be Submitted by 930201 + (ML20118A634)
- ML20118A635 + (ML20118A635)
- ML20118A636 + (ML20118A636)
- 05000219/LER-1992-009, :on 920822,reactor Scrammed on Low Water Level Due to Failure of Proportional Amplifier.Failed Proportional Amplifier Replaced & Plant Restarted + (ML20118A638)
- ELV-04004, Application for Amends to Licenses NPF-68 & NPF-81,revising TS Re Overtemp delta-T & Overpower delta-T Reactor Trip Functions to Provide Addl Operating Margin to Reactor Trip & Turbine Runback Setpoints to Account for Flow Phenomena + (ML20118A639)
- ML20118A641 + (ML20118A641)
- 05000327/LER-1992-016, :on 920819,LCO 3.0.3 Entered for 18 Minutes When Both CREVS Trains Taken Out of Svc to Replace Inlet Damper in Each Train.Caused by Bypass Leakage Through Existing Dampers.Both Dampers Replaced + (ML20118A644)
- ML20118A645 + (ML20118A645)
- ML20118A646 + (ML20118A646)
- ML20118A648 + (ML20118A648)
- ML20118A649 + (ML20118A649)
- ML20118A654 + (ML20118A654)
- ML20118A655 + (ML20118A655)
- 05000456/LER-1992-010-06, :on 920814,dual Accounting for Samarium to Boron Value Contained in Curvebook Table 1-1 Re Min Required Boron Concentration for Shutdown Margin Occurred.Caused by Procedural Flaw.Procedure Revs Submitted + (ML20118A656)
- 3F0992-05, Forwards Update to Util 900102 Response to GL 89-10 & Suppls 1 Through 4 Re safety-related MOV Testing & Surveillance. Util Intends to Complete Implementation of MOV Program During Refuel 9,currently Scheduled for Apr 1994 + (ML20118A657)
- ML20118A660 + (ML20118A660)
- ML20118A671 + (ML20118A671)
- ML20118A673 + (ML20118A673)
- ML20118A674 + (ML20118A674)
- ML20118A678 + (ML20118A678)
- ML20118A680 + (ML20118A680)
- ML20118A681 + (ML20118A681)
- ML20118A682 + (ML20118A682)
- ML20118A684 + (ML20118A684)
- ML20118A686 + (ML20118A686)
- ML20118A689 + (ML20118A689)
- ML20118A691 + (ML20118A691)
- 05000423/LER-1992-016, :on 920704,both Trains of Auxiliary Bldg Filters Declared Inoperable When Access Door on Common Intake Plenum for Subj Bldg Found Open.Caused by Impoper Design.Door Locked Wired Shut + (ML20118A698)
- HL-2376, Forwards Response to NRC 920708 Meeting Request to Provide Addl Info Re Resolution of Human Engineering Discrepancies, Specifically,Differences in Annunicator Arrangements Between Units 1 & 2 & History of Dcrdr Project + (ML20118A699)
- ML20118A700 + (ML20118A700)
- ML20118A702 + (ML20118A702)
- 05000254/LER-1991-022, :on 911104,CR Train B Air Filtration Unit Declared Inoperable Due to Failing to Attain 15 F Differential Temp.Caused by Inaccurate Flow Measuring Device.Flow Measuring Device Recalibr + (ML20118A703)
- ML20118A707 + (ML20118A707)
- ML20118A709 + (ML20118A709)