Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117D541 + (ML20117D541)
- ML20117D553 + (ML20117D553)
- ML20117D569 + (ML20117D569)
- ML20117D589 + (ML20117D589)
- 05000280/LER-1985-005-01, :on 850403,operator Discovered Lockout of Automatic Initiation of CO2 for Fire Zone 7 W/O Required Fire Watch.Caused by Misunderstanding Between Personnel Re Fire Zone Tagging + (ML20117D590)
- ML20117D609 + (ML20117D609)
- ML20117D615 + (ML20117D615)
- 05000219/LER-1985-008, :on 850401,review of Tech Spec Amend 80 Revealed New Testing & Calibr Requirements for 4,160-volt Emergency Bus Undervoltage & Degraded Voltage Equipment Not Yet Incorporated in Existing Plant Procedures + (ML20117D632)
- ML20117D638 + (ML20117D638)
- ML20117D640 + (ML20117D640)
- ML20117D649 + (ML20117D649)
- ML20117D659 + (ML20117D659)
- NSD-NRC-96-4716, Forwards Matl Presented to NRC Technical Staff on 960503 at Meeting to Further Discuss Thermal Hydraulic Uncertainty Issue.Matl Suppls Presentation Matl from 960229 Meeting & Written Submittal of 960412 + (ML20117D662)
- NSD-NRC-96-4715, Forwards Westinghouse Response to NRC Requests for Addl Info on AP600 Design Certification Program.Encl 1 Contains Responses to 69 follow-on Questions Pertaining to Level 2 PRA Modeling & Severe Accident Issues + (ML20117D664)
- 05000416/LER-1985-014, :on 850401,Tech Spec Limiting Condition of Operation Action Statement Not Reported When Main Steam Line High Flow Isolation Channel a Remained Inoperable Beyond 2 H Limit & Required Trip Signal Not Provided + (ML20117D665)
- ML20117D668 + (ML20117D668)
- ML20117D677 + (ML20117D677)
- 05000368/LER-1996-002-04, :on 960409,RAS Surveillance Test Not Performed. Caused by Inadequate Testing Procedures.Revise Procedures Prior to Next Scheduled Surveillance Test.Mgt Expectations Re TS Compliance Reinforced W/Ano Personnel + (ML20117D680)
- 05000285/LER-1984-021, :on 841017,sample from Safety Injection & Refueling Water Tank Yielded Low Boron Concentration.Change Made to Test ST-CHEM-1,F.2 to Notify Supervisor When Boron Concentration Falls Below 1,740 Ppm + (ML20117D681)
- ML20117D690 + (ML20117D690)
- ML20117D691 + (ML20117D691)
- 05000341/LER-1985-003, :on 850403,after Calibr of Div II 48/24-volt Dc Battery Charger B-1,no Output Current Observed.Low Voltage Alarm Ignored Based on Belief That Problem Involved Spare Charger.Cause Unknown + (ML20117D692)
- ML20117D694 + (ML20117D694)
- 05000445/LER-1996-005, :on 960310,entry Into TS 3.0.3 Occurred Due to Cracked Weld in SI Sys Piping.Removed & Replaced Cracked Weldment W/New Weld + (ML20117D698)
- ML20117D699 + (ML20117D699)
- ML20117D702 + (ML20117D702)
- 05000445/LER-1996-006, :on 960411,rod Control Malfunction Resulted in Manual Rt.Replaced Bank Overlap Counter Circuit Board + (ML20117D704)
- ML20117D705 + (ML20117D705)
- ML20117D706 + (ML20117D706)
- ML20117D707 + (ML20117D707)
- ST-HL-AE-5367, Provides Supporting Info Re Operations QA Plan Change QA-026 + (ML20117D708)
- ML20117D709 + (ML20117D709)
- ML20117D712 + (ML20117D712)
- 05000424/LER-1996-003-01, :on 960425,determined That Accumulator Crosstie Could Have Prevented Fulfillment of Safety Function of Sys Needed to Mitigate Consequences of Accident.Caused by Inadequate Procedures.Procedures Changed + (ML20117D718)
- NG-96-1033, Forwards 1995 Annual Financial Repts for Owners of Duane Arnold Energy Ctr,Including Ies Utils,Inc,Corn Belt Power Cooperative & Central IA Power Cooperative + (ML20117D719)
- ML20117D724 + (ML20117D724)
- ML20117D729 + (ML20117D729)
- ML20117D734 + (ML20117D734)
- ML20117D744 + (ML20117D744)
- ML20117D745 + (ML20117D745)
- ML20117D750 + (ML20117D750)
- BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station + (ML20117D759)
- ML20117D763 + (ML20117D763)
- ML20117D770 + (ML20117D770)
- ML20117D780 + (ML20117D780)
- 05000331/LER-1996-002-01, :on 960408,PCIS Half Group III Isolation Occurred Due to Blown Fuse During Maint.Fuse Was Replaced & Radiation Monitor Was Tested + (ML20117D784)
- ML20117D787 + (ML20117D787)
- ML20117D788 + (ML20117D788)
- 05000423/LER-1996-007-01, :on 960403,CRS & Qs Sys Found Outside Design Basis Due to Design Errors.Restored Sys to Appropriate Design Basis Requirements Prior to Declaring Sys Inoperable + (ML20117D790)
- ML20117D794 + (ML20117D794)
- ML20117D799 + (ML20117D799)