Submits Rev 23 to VEGP Units 1 & 2 Emergency Plan.Plan Incorporates Editorial,Plant Equipment,Organizational & Other Changes That Improve Emergency Preparedness Program
ML20117D640
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/01/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117D643 List:
References
LCV-0816, LCV-816, NUDOCS 9605100248
Download: ML20117D640 (11)


Text

._

Georgia Power Cornpany 40 inverres Center Parkway Post Oftcc Box 129$

Birmingham, Alabama 35201 Telephono 205 877 7122 Georgia Power C. K. McCoy Vce President. Nuclear Vogtfe Pro;ect tre southern electic system May 1, 1996 LCV-0816 Docket Nos. 50-424 50-425 s

U.S. Nuclear Regulatory Commission Attn: Document Control Desk

~

Washington, D. C.

VOGTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 23 Gentlemen:

In accordance with 10 CFR 50.54 (q) and 10 CFR 50.4, Georgia Power Company hereby submits Revision 23 to the Vogtle Electric Generating Plant ( VEGP ) Units 1 and 2 Emergency Plan ( the Plan ).

Revision 23 incorporates editorial changes, changes to plant equipment, organizational changes, and other changes that improve the einergency preparedness program. With this revision, new binders and tabs arc also being distributed. Enclosure 1 provides a description and justification of the individual changes. Enclosure 2 provides insertion instructions. The revised plan pages are in Enclosure 3. The changes made to the Plan do not decrease the effectiveness of the Plan.

In accordance with 10 CFR 50.4, two copies of Revision 23 are being sent to the NRC Region II oflice and one copy is being sent to the NRC Senior Resident Inspector at VEGP.

Please contact this oflice if you have any questions regarding this submittal or contact Mr.

l J. N. Roberts, Emergency Preparedness Coordinator, at (706) 826-3416.

Sincerely, h..

C. K. McCoy CKM/PAH cc: (See next page) 9605100248 960501 PDR ADOCK 05000424 F

PDR

\\

l GeorgiaPower d U.S. Nuclear Regulatory Commission Page 2

Enclosures:

1. Description and Justification of Changes
2. Insertion Instnictions
3. Revised Plan Pages cc:

Georgia Power Company Mr. J. B. Beasley Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle l

l l

i 1

LCV-0816 i

l

i

!(

i Description and Justification of Changes 4

~

4 j

i 1

i f

1 4

h

!O 4

i.

4

]

i j

l l

a a

a&.-

-.a s

s n

aa-4 a:

d d

4 i

Insertion Instructions i

1 4

1 l

i 4

4 i

l 4

k i

)

i i

t 6

l 1

JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN (3

1.

Global Change, NaturalDisaster Operation Plan (NDOP), to Georgia Emergency Operations Plan (EOP.

J Justification:

Name of Plan changed by GEMA.

l 2.

Page A-6 Paragraph A.2.2.2.a. Add, onsite.

Justification:

Correct error.

l 3.

Page A-7 Add paragraph 5.d.

l l

Justification:

Update of GEMA plan.

Paragraph 6.a. Change expedient to expeditious. Editorial l

l 4.

Page A-9 Paragraph A.4 Change SCCEPP to SCEOP, and Bureeu ofRadiological Health to Bureau of Solid and Hazardous Waste, Nuclear Emergency Planning (NEP) Section.

l Justification:

Changes to South Carolina Emergency plans and organizational name changes.

%/

5.

Page A-10 Paragraphs 4., S., and 6. Change 1985 to 1995 to reflect updating of plans.

l 6.

Page A-12 Paragraph A.4.2.1.b. Change Primary to Backup.

l Justification:

South Carolina EPD has established a new primary warning point in their State EOC.

7.

Page A-14 Paragraphs 6.c. and 7.c. Change BRH to NEP to reflect organizational changes.

8.

Page A-15 Paragraph A.S.2.a. Change Law Enforcement Center to Central Dispatch to reflect change in location of Allendale County's warning point.

9.

Page A-20 Paragraph 3. Delete (highwaypatroldispatcher), change law enforcement center to central, and delete duty officer for South Carolina Warning Point.

Reasons as in paragraphs 6. and 8. above.

10. Table B-2 Dose analyst. Delete radwaste supervisor, add qualified assistant team leaders.

}

Justification:

The radwaste supervisor position was changed to assistant team leader.

Page 1 of 7 l

JUSTIFICATION FOR REVISION 23 TO THE 1

(

VEGP EMERGENCY PLAN O

Maintenance supervisor. Delete superintendent, supervisors, andforeman.

Add Team leaders and assistant team leaders.

OSC manager. Delete Maintenance manager, supervisors, superintendents, andforeman. Add Performance team manager, assistant performance team manager, team leaders, and assistant team leaders.

Justification:

These positions have been changed to team leader titles.

Dosimetry team. Change dosimetry specialist and health physics technicians to Qualified health physics personnel.

Justification:

Dosimetry specialist position has been reduced and there are other personnel (HP technicians) who are qualified to perform these duties.

I 1.

Figure B-1 Change title of maintenance organization to reflect performance team concept.

12. Table C-2 Update location of Allendale County EOC from Court House to Brandt Building.
13. Table D-1 Add EALs Hl.1 and H2.1 for hurricanes.

O Justification: To be consistent with the other nuclear plants in The Southern Company. All state and county governments in the 10 mile EPZ had verbally agreed to this change.

14. Page E-1 Paragraph E.1 Delete " specific" from.. by sounding a specific tone signal for the emergency. Change pulse andyelp to warble for a Site Area Emergency and General Emergency.

Justification:

To be consistent with the other nuclear plants in The Southern Company. This will enhance cross training of different site personnel.

15. Table E-1 Control Room Staff. Delete Plant & system from Plant telephone system Table E-2 and add PA system and pager for notifying Vogtle duty manager.

1 Vogtle duty manager. Delete " plant & system" from Plant telephone system.

Justification:

Update notification methods.

16. Page F-1 Paragraph F.1.1.,2nd paragraph Add and the three South Carolina counties.

Replace dedicatedcircuit with...is a prearranged conference call over commercial telephone lines and...

Justification:

The dedicated circuit ADL has been replaced with a prearranged conference set up on a special conference bridge called ALLEGRO Page 2 of 7 l

JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN GO located at the Savannah River Site. The previous ADL equipment was obsolete, difficult to maintain, and unreliable.

17. Page F-2 Paragraph F.2.1. Delete warningpoint and add emergency operations center l

(SEOC). Delete at the Emergency Preparedness Division Office (State emergency operations center (SEOC).

Changes are also made to the second paragraph to reflect the changes made to the ADL as in paragraph 16 above.

Justification: The South Carolina Warning Point has been moved to the state emergency operation center (SEOC). This change incorporates that move and j

cleans up the wording.

18. Pages F-4, Delete Corporate office hotline and Corporate office dial.

F-5, & F-6 Delete line from Facsimile line. Add prearranged conference in place of dedicated circuit for the ADL.

Justification: The Corporate Office hotline and Corporate Office dial l

provided a dedicated path to the corporate office over The Southern Company microwave system. These circuits were seldom used during drills and exercises and the existing nondedicated circuits to the Corporate Office over the Southern Company microwave, which can be accessed from any plant PBX line, are considered adequate.

I

19. Table F-1 Delete corporate office hotline and corporate office dial.

Add ERDS capability to GEMA, NRC Operations Center, and NRC Region II.

Add ADL capability to SC Counties.

20. Page G-1 Third paragraph. Delete in local telephone booths. Add on siren poles.

Justification:

There are currently only six public phone booths in the Vogtle j

10 mile EPZ Replacing these sign locations with placards on each of the 47 l

emergency siren poles should improve the probability of providing emergency information to transients. In addition, other public locations such as convenience stores will continue to have placards displayed and brochures available.

I

21. Page G-2 Paragraph G.I. Deletepublicphone booths. Add siren poles.
22. Page H-2 Second line. Delete the TSCis activated basedon. Add required by.

Justification:

Remove any ambiguity from the meaning of the sentence.

23. Page H-11 Paragraph 2, first bullet. Add Chemistry Display Console. Delete and l

annunciation.

l Page 3 of 7

JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN Second bullet. Add Communicates with the IPC to provide PERMS data to general plant areas.

Justification: The PERMS is being modified to improve reliability and maintainability.

24. Page H-12 First Bullet. Add except safety related DPMs which have one way communications.

Third bullet. Delete TSC and Healthphysics controlpoint. Add Radiochemistry Lab.

Fourth bullet. Delete Controlroom and TSC. Add Radiochemistry Lab.

Justification:

Update to PERMS. Those areas where displays have been deleted will have information available from IPC terminals. The printers in the control room and TSC have been found to be unnecessary and rarely used.

25. Page H-17 Delete paragraph 7, Gross FailedFuelDetector.

Justification:

The gross failed fuel detector has been removed due to high maintenance and high radiation dose (2 REM /yr - reference DRC/MDC #93-VIN 0052-0-1). The information provided by the instrument is not used for emergency plan implementation.

26. Page J-l Paragraph J.l.2. Add new paragraph, A security related emergency

......made by the Emergency Director.

Justification: For some security related events invohing armed intruders, it may not be prudent to order assembly and accountability because the act of assembling may help to provide targets for the intruder.

ARer "a personnel roster" add (TSC and OSC only).

Justification:

It is not necessary to sign in on a personnel roster in the control room as a shiR roster is maintained and is used to determine accountability.

27. Page J-3 Third parag;raph. Delete, Wash water andsolutionsform thepersonnel decontamination process along with.

Justification: Delete requirement to collect water used to decontaminate personnel outside of the plant because FF.MA does not require it to be done.

g

Reference:

FEMA-REP-18, page D.22-1, Issue 1; which states in part, "Special W

arrangements for the collection and containment of water used for decontamination are not necessary."

Page 4 of 7

1 JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN O 3 V

28. Page K-3 Paragraph K.3, first paragraph. Delete Table K-2 presents. Add are delineated in plant admin, and health physics procedures.

Justification:

Table K-2 is identical to action levels in plant admin. and health physics procedures. There is no need to have special action levels for emergency procedures.

Second paragraph. Delete Liquid waste will be collectedand returned to the plantforprocessing.

Justification:

Same as page J-3.

29. Page K-4 Second paragraph and last paragraph. Delete oftable K-2 and Table K-2 providesguidance to be usedin this effort. Add standard health physics.

Delete sentence Personnelindicating greater than 20,000 dpm/100 cm' will be

....... decontamination.

\\

Justification:

Use standard health physics for contamination limits and q

guidance.

kJ

30. Table K-2 Delete entire table.

2

31. Page L-1 Paragraph L.1, seccnd paragraph. Delete... 5000 dpm/100 cm 3,fyfgyyyy above bacicground....

Justification:

It is not necessary to state contamination limits. Standard plant health physics procedure limits will be used.

32. Appendix 1 Page 1-2. Delete GFFD grossfailedfueldetector.

Annendix 8 Emergency Communications Plan

33. Page 2 Paragraph E. Delete. This is redundant to a statement in paragraph 1.0.
34. Page 3 Paragraph 4.0.F. Change will to should.

Justification:

State and county agency representatives may not be available.

35. Pages 15-21 Section 8.0 Major revision to this section. The following position descriptions were deleted.: E. Government Relations Coordinator; G. Media Monitor; H.

O News Writers for the EOF, ENC, GOOC and Corporate Office; I. Southern V

Company Services Liaison; K. Technical Briefer; L. Facilities / Operations Coordinator; N. Community Relations Coordinator; O. ENC Secretary; Q.

Employee Communications Coordinator; R. Telephone Response Teams; Page 5 of 7

JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN S. Corporate Public Information (PI) Secretary; T. Technical Assistants, U.

Financial Response Officer: V. Corporate Facilities Assistant. Notification information was removed from the remaining position descriptions.

Justification: The position descriptions that were removed are not considered principal Emergency Communication staff and therefore their descriptions are not appropriate for this plan. Position duties are contained in procedures. Notification methodology should not be part of a position description and it is adequately described in section 7.0 of this appendix and implemented by procedures.

36. Page 15 Paragraph 8.0. A, last sentence. Delete sentence The PIDirector willmaintain contact....... Emergency Communications Manager.

Justification:

Unnecessary detail which is too prescriptive.

j

37. Page 16 Paragraph D. Delete sentence He will remain in constant contact.......via dedicated telephone line.

Justification: Unnecessary detail which is too prescriptive.

38. Page 29 Change office to Headquarters.

1

39. Page 30 Paragraph F.2. Delete entire paragraph. Renumber paragraphs which follow.

l 1

Justification:

Signs and posters have been deleted from phone booths.

Verification of other displays / sign is covered in paragraph 3. below.

40. Page 31 Paragraph 5.

Delete entire paragraph.

Justification: Information about the plant is available at the visitors center and through periodic public meetings and exercise critiques.

41. Table 2 Public Information Director and Emergency Communications Manager: Delete VP, Corporate Communication.

Comvany Sookesperson: Delete Manager, Engineering Technical Support.

EOF Information Coordinator: Delete Employee / Ext. Communication Supervisor.

Local Media Monitor: Add Marketing StafiMembers.

Corocrate Media Relations Coordinator: Delete all specific positions. Add Corporate Communication Staff.

Justification:

Staff changes and added flexibility in assignments.

Page 6 of 7

=..

I JUSTIFICATION FOR REVISION 23 TO THE VEGP EMERGENCY PLAN O

42. Volume 1, Preface, Folding Map, VOGTLE ELECTRIC GENERATING, PLANT &

SAVANNAH RIVER SITE 59 MILE EPZ INGESTION PATHWAY, figure IV:

Justification: Update Waynesboro insert to reflect change to Backup EOF location.

O O